COMPANY RECORD · PHILADELPHIA, PA

John Dibuonaventura Jr Plumb & Heating — permit history in Philadelphia, PA

John Dibuonaventura Jr Plumb & Heating appears on 84 Philadelphia permit records from 2021 through 2026, most often plumbing (67.9% of the record).

Permit categories

CategoryPermitsShare
Plumbing5767.9%
Mechanical2732.1%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202117
202214
202317
202412
202511
202613

Busiest year on record: 2021, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Construction Force Inc102026-03-02
Arco Db Companies, Inc.72026-07-17
Fastrack Construction, Inc.62026-03-09
Donat Inc42025-03-28
Hybar Construction LLC32022-06-24
The Nubo Group, Inc.22025-05-22
G & M Efestos Contracting Inc22023-01-04
Frank Ciminelli22024-11-22
Ocf Construction LLC22023-07-28
Franjo Construction Corporation22022-11-03
Sport Builders Inc22025-07-18
Pelco Builders Inc.22023-06-08

18 named participants share a resolved project timeline with John Dibuonaventura Jr Plumb & Heating. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
650 FAIRMOUNT AVE2026-10-21
5000 RICHMOND ST2026-07-17
1112 N HANCOCK ST2026-05-28
200 S BROAD ST2026-03-09
1849 WALNUT ST2026-03-02
311 S JUNIPER ST2026-02-24
219-29 S 18TH ST2025-09-10
913-29 WALLACE ST2025-07-18
1608-34 SANSOM ST2025-05-22
1809 E PASSYUNK AVE2025-03-28
1201-15 CALLOWHILL ST2025-01-15
775 S CHRISTOPHER COLUMBUS BLVD2024-12-14
700 N DELAWARE AVE2024-11-22
2101 WASHINGTON AVE2024-10-31

50 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Ryan Gagliardi132021–2023
Thomas Uhl132021–2024
Al-Kaun Co122021–2023
Klehr Harrison Harvey Branzburg LLP72021–2026
Altin Xhixho72021–2025
Elite Fire Protection Corp72021–2024
Aqueduct Fire Protection Systems, LLC72021–2022
Arber Sulaj62021–2026

Companies that also appear in Philadelphia permit records at addresses where John Dibuonaventura Jr Plumb & Heating filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

84 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
PP-2023-0080602026-10-21Plumbing650 FAIRMOUNT AVEINSTALL 4 INCH WATER SERVICE, 106 WATER CLOSETS, 106 LAVATORIES, 105 SHOWER/TUBS, 90 KITCHEN SINKS, 164 FLOOR DRAINS, 1 BOOSTER PUMP, 1 EJECTOR SUMP, 1 ELEVATOR SUMP PUMP, 1 BACKFL
MP-2026-0027822026-07-17Mechanical5000 RICHMOND STMechanical / Fuel Gas Permit for combo CP-2026-002114
PP-2026-0065452026-05-28Plumbing1112 N HANCOCK STFOR THE INSTALLATION OF PIPE AND FIXTURES ACCORDING TO APPROVED PLANS, PER CODE. ADDITIONAL FIXTURES INCLUDE MOP RECEPTOR (1) & GREASE INTERCEPTORS (2), AND CONNECT TO EXISTING FI
PP-2026-0016602026-03-09Plumbing200 S BROAD STALTERATIONS TO EXISTING COMMERCIAL SPACE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. V
PP-2026-0019402026-03-02Plumbing1849 WALNUT STALTERATIONS TO EXISTING HIGH-RISE TO ADD 5 DWELLING UNITS. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO
MP-2026-0009772026-02-27Mechanical1849 WALNUT STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE D
MP-2026-0002042026-02-24Mechanical311 S JUNIPER STINSTALLATION OF HVAC SYSTEM FOR EXISTING MULTI-FAMILY DWELLING IN AN EXISTING HIGH-RISE BUILDING AS PER APPROVED PLANS. *2018 IMC REVIEW*
MP-2026-0006482026-02-13Mechanical5000 RICHMOND STMechanical / Fuel Gas Permit for combo CP-2025-005674
PP-2026-0006902026-02-13Plumbing5000 RICHMOND STPlumbing Permit (Interior) for combo CP-2025-006368
PP-2026-0012802026-02-13Plumbing5000 RICHMOND STPlumbing Permit (Interior) for combo CP-2025-005674
PP-2026-0016952026-02-13Plumbing5000 RICHMOND STINTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE BASE VENTING METHOD. ALL WORK TO B
MP-2026-0008602026-02-13Mechanical5000 RICHMOND STFOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSIO
MP-2026-0003422026-02-13Mechanical5000 RICHMOND STMechanical / Fuel Gas Permit for combo CP-2025-006368
PP-2025-0088552025-09-10Plumbing219-29 S 18TH STINTERIOR ALTERATIONS OF DWELLING UNIT 202. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES CONNECTING TO EXISTING METALLIC PIPING. VENTING TO BE DEISGN
MP-2025-0034312025-08-06Mechanical219-29 S 18TH STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO
MP-2025-0036892025-07-18Mechanical913-29 WALLACE STFOR THE INSTALLATION OF PIPING SYSTEMS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS.
PP-2025-0089032025-07-14Plumbing913-29 WALLACE STFOR THE INSTALLATION OF PIPE AND FIXTURES TO TWO LAVS, TWO WATER CLOSETS, ONE SEWAGE EJECTOR, ONE MOP SINK, AND ONE WATER FOUNTAIN, PER APPROVED PLANS, ACCORDING TO CODE. 7 NEW FIX
MP-2025-0028872025-06-13Mechanical200 S BROAD STFOR THE INSTALLATION OF FUEL GAS PIPING SYSTEM, REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPEC
PP-2025-0065002025-06-06Plumbing200 S BROAD ST plumbing only. Gas pipe must be applied for under a mechanical permit
PP-2025-0067552025-05-22Plumbing1608-34 SANSOM STREPLACE TWO UTILITY SINKS WITHIN ONE CONDOMINIUM
MP-2025-0014612025-03-28Mechanical1809 E PASSYUNK AVEFOR THE INSTALLATION OF APPLIANCES NOT CONNECTED VIA DUCTWORK; FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN
PP-2025-0029962025-03-19Plumbing1809 E PASSYUNK AVEINTERIOR INSTALLATION OF LISTED FIXTURES AND ASSOCIATED PIPING. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS.
PP-2024-0066652025-01-15Plumbing1201-15 CALLOWHILL STINSTALL 11 AREA DRAINS, 1 BACKFLOW PREVENTER, 4 BACKWATER VALVES, 104 FLOOR DRAINS, 149 HOT WATER HEATERS, 2 EJECTOR SUMP PUMPS, 144 WASHING MACHINE BOXES, 144 KITCHEN SINKS, 12 RO
PP-2025-0002312025-01-08Plumbing1201-15 CALLOWHILL STFor minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ S
MP-2024-0052962024-12-14Mechanical775 S CHRISTOPHER COLUMBUS BLVDFOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO B
MP-2024-0050942024-11-22Mechanical700 N DELAWARE AVEFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS P
MP-2024-0046242024-10-31Mechanical2101 WASHINGTON AVEFOR THE INSTALLATION OF A FUEL GAS PIPING SYSTEM. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE
PP-2024-0118182024-09-13Plumbing705 PINE STINTERIOR INSTALLATION OF PIPE AND 66 FIXTURES TO SIX (6) DWELLING UNITS ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 PPC
PP-2024-0037772024-08-15Plumbing700 N DELAWARE AVEINSTALL 197 KITCHEN SINKS, 197 DISHWASHERS, 197 WASHING MACHINE BOXES, 60 FLOOR DRAINS, 5 HOT WATER HEATERS, 250 WATER CLOSETS, 260 LAVATORIES, 245 SHOWER/TUBS, 14 ROOF DRAINS, 7 G
MP-2024-0031732024-08-02Mechanical1849 WALNUT STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS P
MP-2024-0031742024-08-02Mechanical1849 WALNUT STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS P
PP-2024-0081402024-07-25Plumbing1849 WALNUT STINSTALL 9 KITCHEN SINKS, 9 HOT WATER HEATERS, 16 WATER CLOSETS, 19 LAVATORIES, 17 SHOWER/TUBS, 9 WASHING MACHINE BOXES AND 17 FLOOR DRAINS ACCORDING TO THE 2018 PPC.
PP-2024-0081802024-07-25Plumbing1849 WALNUT STINSTALL 14 WATER CLOSETS, 9 KITCHEN SINKS, 9 WASHING MACHINE BOXES, 15 SHOWER/TUBS, 17 LAVATORIES, 9 HOT WATER HEATERS AND 17 FLOOR DRAINS ACCORDING TO THE 2018 PPC AND PER PLANS.
PP-2024-0037692024-04-12Plumbing711 PINE STFOR THE INSTALLATION OF PLUMBING & FIXTURES TO NINE (9) DWELLING UNITS AS PER APPROVED PLANS
PP-2024-0050312024-04-03Plumbing3111 W ALLEGHENY AVEFOR THE INSTALLATION OF PLUMBING & FIXTURES TO THE EXISTING TENANT SPACE AS PER APPROVED PLANS. FIXTURES INCLUDE ONE EACH: WATER CLOSET, LAV, LAUNDRY TUB, SEWAGE EJECTOR, ELECTRIC
MP-2024-0009822024-03-10Mechanical2235 WASHINGTON AVEFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS P
PP-2023-0163882023-12-18Plumbing713 PINE STFOR THE INSTALLATION OF PLUMBING & FIXTURES TO NINE (9) DWELLING UNITS, AS PER APPROVED PLANS.
MP-2023-0047352023-11-17Mechanical4701-29 PINE STFOR THE INSTALLATION OF FUEL GAS PIPING YSTEM IN ACCORDANCE WITH APPROVED PLAN.
PP-2023-0100232023-09-19Plumbing3111 W ALLEGHENY AVEFOR THE INSTALLATION OF PLUMBING & FIXTURES TO ONE-HUNDRED-SIXTY-FOUR (164) DWELLING UNITS, FOR AN APARTMENT BUILDING, AS PER APPROVED PLANS. OTHER FIXTURES INCLUDE THREE (3) PET S
PP-2023-0080582023-09-15Plumbing650 FAIRMOUNT AVEINSTALL 207 WASHING MACHINE BOXES, 207 KITCHEN SINKS, 10 ROOF DRAINS, 32 TRENCH DRAINS, 8 GARAGE DRAINS, 2 EJECTOR SUMP PUMPS, 399 FLOOR DRAINS, 3 SUMP PUMPS, 1 BOOSTER PUMP, 3 HOS
PP-2023-0087792023-08-15Plumbing2026-58 MARKET STFOR THE INSTALLATION OF PLUMBING & FIXTURES TO FOUR (4) DWELLING UNITS, AS PER APPROVED PLANS.
PP-2022-0171282023-08-11Plumbing4701-29 PINE STINSTALL 8 AREA DRAINS, 1 BACKFLOW PREVENTER, 230 FLOOR DRAINS, 228 HOT WATER HEATERS, 225 KITCHEN SINKS, 225 WASHING MACHINE BOXES, 262 LAVATORIES, 52 ROOF DRAINS, 257 SHOWER/TUBS
PP-2023-0097572023-07-28Plumbing2235 WASHINGTON AVEINSTALL PLUMBING & FIXTURES WITHIN ONE SHELL COMMERCIAL SPACE. FIXTURES TO BE ONE WATER CLOSET, ONE LAV, ONE DRINKING FOUNTAIN, ONE MOP SINK, AND ONE ELECTRIC WATER HEATER, PER 201
PP-2023-0087882023-07-28Plumbing2235 WASHINGTON AVEINSTALL 2 FLOOR DRAINS, 1 WATER CLOSET, 1 LAVATORY, 4 HAND SINKS, 1 THREE COMPARTMENT SINK, 1 HOT WATER HEATER, 1 MOP SINK AND 1 GREASE INTERCEPTOR ACCORDING TO THE 2018 PPC AND P
PP-2023-0082032023-07-18Plumbing2121-41 MARKET STINSTALL 8 KITCHEN SINKS, 8 DISHWASHERS, 8 WASHING MACHINE BOXES, 8 FLOOR DRAINS, 8 HOT WATER HEATERS, 12 SHOWER/TUBS, 8 LAVATORIES AND 12 WATER CLOSETS ACCORDING TO THE 2018 PPC AN
PP-2023-0054582023-06-08Plumbing2101 WASHINGTON AVEFOR THE INSTALLATION OF PLUMBING & FIXTURES FOR AN APARTMENT BUILDING AND SHELL COMMERCIAL SPACE, AS PER APPROVED PLANS, ACCORDING TO THE 2018 PPC
PP-2023-0068682023-06-05Plumbing717 PINE STFOR THE INSTALLATION OF PLUMBING & FIXTURES TO NINE (9) DWELLING UNITS, FOR AN APARTMENT BUILDING, AS PER APPROVED PLANS.
MP-2023-0018232023-05-23Mechanical2101 WASHINGTON AVEFOR THE INSTALLATION OF NATURAL GAS PIPING TO ROOF-TOP BOOSTER PUMP AND GENERATOR, IN ACCORDANCE TO ALL CODES, PER APPROVED PLANS
MP-2023-0018422023-05-23Mechanical2101 WASHINGTON AVEFOR THE INSTALLATION OF A NEW HVAC SYSTEM INCLUDING REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK TO TWO-HUNDRED-FOURTY-SIX (246) DWELLING UNITS AND COMMON AREAS AS
PP-2023-0058692023-05-19Plumbing1924-36 WASHINGTON AVEPlumbing Permit (Interior) for combo CP-2022-007168

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Other plumbing contractors in Philadelphia

CompanyPermits on record
Summers Quality Services Inc88
Ben Manis Plumbing LLC87
William Bierman Jr87
Flow Temp 368 Gen Contracting86
Klein & Company Plumbing Inc86
Sila Services, LLC86
Keith P Scott85
Right Price Plumbing & Heating LLC85

Companies whose main permit category in Philadelphia is also plumbing, closest to John Dibuonaventura Jr Plumb & Heating in filing volume. Listed for comparison, not as a recommendation.

Search these records

The 84 permits above are a static record through 2026. Select a year above to open that year’s records, or search John Dibuonaventura Jr Plumb & Heating in Philadelphia, PA by address, trade or date range.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.