COMPANY RECORD · PHILADELPHIA, PA

Dylan Sloan — permit history in Philadelphia, PA

Dylan Sloan appears on 32 Philadelphia permit records from 2021 through 2026, most often plumbing (90.6% of the record).

Permit categories

CategoryPermitsShare
Plumbing2990.6%
Mechanical39.4%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20213
20221
20247
202512
20269

Busiest year on record: 2025, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.

PROJECTS AHEAD SEARCH

Search every Philadelphia permit, not only this company's

This page is a snapshot of Dylan Sloan. The search behind it holds more than 242,223 Philadelphia permits naming a contractor, since 2021: 82,008 plumbing permits, 51,127 electrical permits, 25,710 mechanical permits, 25,367 residential building permits, 24,512 zoning permits.

  • Search the full history by company, address, permit type or date range.
  • Set an alert and get an email when a new permit matches — the next permit Dylan Sloan files, or any new plumbing permit in Philadelphia. A new permit is an early signal of work to bid on, supply or finance.
  • Export to CSV for your CRM or spreadsheet.

Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans

Names on the same project timelines

Name in sourceLinked permitsLast seen
Domus, Inc.62025-09-22
Kmc Partners LLC32025-12-12
Torino Inc32026-03-02
D Lauro & Rodgers Inc22026-07-13
Rycon Construction, Inc.22026-02-05
Connor Construction LLC12024-11-04
Lott Restaurant Construction12024-12-10
Lawrence W Basher12021-07-08
Northeast Construction Contractors12025-11-14
Tricon Construction, LLC12022-12-01

10 named participants share a resolved project timeline with Dylan Sloan. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
1001-99 N DELAWARE AVE2026-10-09
2027 FAIRMOUNT AVE2026-09-17
44-46 S 3RD ST2026-08-17
1420 PINE ST2026-07-13
123 S BROAD ST2026-07-07
1401-49 N BROAD ST2026-03-02
1717 ARCH ST2026-02-05
1601-23 MARKET ST2025-12-12
1604 CHESTNUT ST2025-11-14
27-29 N 3RD ST2025-10-09
1515-21 FAIRMOUNT AVE2025-09-22
150 ROUSE BLVD2025-07-22
3201 CHESTNUT ST2025-07-22
2825-29 DIAMOND ST2025-05-11

27 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Sunlight Electrical Contracting Co., Inc.42025
H&W Mechanical Services LLC42025
Domus, Inc.42024–2025
Klehr Harrison Harvey Branzburg LLP32021–2025
A & S Sprinkler Co Inc22022–2026
Hunter Mechanical Inc22022–2026
Wayman Fire22024–2026
Joseph F Spaeder22024–2026

Companies that also appear in Philadelphia permit records at addresses where Dylan Sloan filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

32 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
MP-2026-0054982026-10-09Mechanical1001-99 N DELAWARE AVEFOR THE INSTALLATION OF GAS PIPING SYSTEM TO APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PE
PP-2026-0098122026-09-17Plumbing2027 FAIRMOUNT AVEALTERATIONS TO EXISTING COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION
PP-2026-0090722026-08-17Plumbing44-46 S 3RD STFIT-OUT TO DOG WASH SALON IN COMMERCIAL SPACE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSI
PP-2026-0111352026-08-17Plumbing1001-99 N DELAWARE AVEALTERATIONS TO CASINO. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGN
MP-2026-0032062026-07-13Mechanical1001-99 N DELAWARE AVEFOR THE INSTALLATION OF PIPING SYSTEM AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSL
PP-2026-0082182026-07-13Plumbing1420 PINE STALTERATIONS TO EXISTING SCHOOL. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO
PP-2026-0071832026-07-07Plumbing123 S BROAD STProvide above and below floor DWV for gang bathrooms and three coffee pantries. New domestic water lines and water heaters.
PP-2026-0021222026-03-02Plumbing1401-49 N BROAD STINSTALLATION OF 2 NEW FIXTURES WITH PIPING. ALL WORK PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND PLUMBING EZ STANDARD.
PP-2025-0156502026-02-05Plumbing1717 ARCH STInstallation of new bathroom, 2 pantries, and wellness room plumbing. Sanitary and domestic hot and cold water supply lines.
PP-2025-0157592025-12-12Plumbing1601-23 MARKET STInstallation of newly located pantry sink and bottle filler/ water fountain
PP-2025-0094692025-11-14Plumbing1604 CHESTNUT STAMENDMENT SCOPE * Added a sheet to clearly show PCU location. * Minor update to Domestic water plan, Vent Plan, and 2d Riser Diagrams. Due to the updated kitchen layout per latest
MP-2025-0044722025-10-09Mechanical27-29 N 3RD STFor installation of gas piping to equipment as per approved plans.
PP-2025-0102842025-09-22Plumbing1515-21 FAIRMOUNT AVEScope of work related to this project it entails fixture swap outs that are like for like. Alteration of plumbing piping systems- sanitary and domestic are not applicable to this p
PP-2025-0091752025-07-22Plumbing150 ROUSE BLVDWATER, WASTE & VENT PIPING & Install pantry sink basin, faucet, supplies, and trap under sink.
PP-2025-0076782025-07-22Plumbing3201 CHESTNUT STINTERIOR ALTERATIONS TO CONVERT STARBUCKS TO SAXBYS. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED IFXTURES CONNECTING TO EXISTING METALLIC PIPING. FOOD PREP F
PP-2025-0074372025-06-16Plumbing27-29 N 3RD STPlumbing only. Installed to the 2018 Philadelphia Plumbing Code sec 919 • Furnish and install rough plumbing sanitary, venting, water piping • Sanitary underground piping to be s
PP-2025-0019262025-05-11Plumbing2825-29 DIAMOND STFurnish and install a new sump pump check valve and Piping Furnish and install new insulation on exposed traps Furnish and install new shower heads Hydro jet storm and sewer mains
PP-2025-0019292025-05-11Plumbing1523 FAIRMOUNT AVEFurnish and install a new Bradford white water heaters reconnect to existing piping Furnish and install a new hot water Circulation pumps reconnect to existing piping Furnish and i
PP-2025-0019282025-04-09Plumbing2826 DIAMOND STFurnish and install a new sump pump check valve and Piping Furnish and install new insulation on exposed traps Furnish and install new shower heads FIXTURE REPLACEMENT WITH PIPING
PP-2025-0019302025-04-09Plumbing1440 N BROAD STFurnish and install a new Bradford white water heater Furnish and install a new hot water Circulation pump Furnish and install a new toilet control valve handle in room 16 Furnish
PP-2025-0019312025-04-09Plumbing1850 N CROSKEY STFurnish and install a new bathroom Furnish and install new fixtures
PP-2024-0052132024-12-10Plumbing1112 N HANCOCK STINSTALL 4 WATER CLOSETS, 1 URINAL, 4 LAVATORIES, 2 HOT WATER HEATERS, 4 HAND SINKS, 8 FLOOR DRAINS, 15 FLOOR SINKS, 1 ICE MAKER, 2 GREASE INTERCEPTOR, 4 FLOOR TROUGH DRAINS, 1 MOP
PP-2024-0161162024-12-09Plumbing123 S BROAD STRenovation of the 9th floor Rough in plumbing for a new bathroom and a new kitchenet. All piping must be metallic installed to the 2018 Philadelphia plumbing code section 919
PP-2024-0118082024-11-04Plumbing2760 RED LION RDPlumbing Permit (Interior) for combo CP-2024-003317
PP-2024-0049622024-08-13Plumbing5305-59 CHEW AVEReplace fixtures which includes Utility Sink, Faucet, and Drinking Fountain. 2 FIXTURES.
PP-2024-0074162024-07-02Plumbing1112 N HANCOCK STINSTALL 1 ONE INCH WATER SERVICE, 2 ICE MAKERS, 1 STORAGE SINK, 1 RINSER SINK, 1 PREP SINK, 1 HAND SINK, 1 THREE COMPARTMENT SINK, 1 GREASE INTERCEPTOR, 1 HOT WATER HEATER, 1 MOP S
PP-2024-0086572024-06-26Plumbing9033 LYKENS LNSaw cut excavate the street to replace the lateral install new cast iron piping SEWER LATERAL ONLY
PP-2024-0049682024-04-09Plumbing3315 BELGREEN RDREPAIR/REPLACE 3/4" WDP.
PP-2022-0135302022-12-01Plumbing5675 RISING SUN AVERun a 1" PVC condensation drain in the ceiling from the new unit over to the mop sink. Installed about 80 feet of 1" PVC Adding hangers to support the piping
PP-2021-0064992021-07-08Plumbing130 W GRAVERS LNKitchen sink and bathroom
PP-2021-0050912021-03-29Plumbing2338 S BOUVIER STReplace curb trap fai house drain
PP-2021-0019622021-02-09Plumbing8442 ARDLEIGH STFor minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ S

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.