COMPANY RECORD · PHILADELPHIA, PA

Dougherty Electric Inc — permit history in Philadelphia, PA

Dougherty Electric Inc appears on 91 Philadelphia permit records from 2021 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical91100%

Activity by year

YearPermits issued
20217
20227
202313
202412
202526
202626

Busiest year on record: 2025, with 26 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
V&V Investment Inc132025-12-13
Fastrack Construction, Inc.72026-07-10
Hunter Roberts Holdings LLC62026-04-23
Gilbane Building Company42026-01-28
Pmc Property Group42026-03-03
Clemens Construction Co Inc..22026-04-14
Connstruction Services LLC22024-03-05
American Sitework LLC12024-11-27
Columbus Construction LLC12025-03-25
Daniel J. Keating Company12026-05-07
Fastrack Builders, Inc12023-12-21
Henry J Banning12023-01-27

15 named participants share a resolved project timeline with Dougherty Electric Inc. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
4401 HOLDEN ST2026-07-28
400 MARKET ST2026-07-10
1301-25 CHESTNUT ST2026-06-09
210 S 12TH ST2026-05-18
1300 MARKET ST2026-05-05
1801-21 MARKET ST2026-04-27
4131 UNRUH AVE2026-04-14
200 S BROAD ST2026-03-03
1300 PATTISON AVE2026-01-28
2150 S 3RD ST2025-12-13
2349 S FRONT ST2025-09-18
2351 S FRONT ST2025-09-18
1530 CHESTNUT ST2025-08-01
34-40 S 11TH ST2025-05-27

32 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

91 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
EP-2026-0041202026-07-28Electrical4401 HOLDEN STInstall a 1000-amp electrical service with 14 meter packs, including proper grounding and bonding. Install one (1) 125-amp subpanel for the house panel, and one (1) 125-amp subpan
EP-2026-0041112026-07-27Electrical4401 HOLDEN STInstall a 1000-amp electrical service with 13 meter packs, including proper grounding and bonding. Install one (1) 125-amp subpanel for the house panel, and one (1) 125-amp subpan
EP-2026-0040842026-07-27Electrical4401 HOLDEN STInstall a 600-amp electrical service with 9 meter packs, including proper grounding and bonding. Install one (1) 125-amp subpanel for the house panel, and one (1) 125-amp subpanel
EP-2026-0041182026-07-27Electrical4401 HOLDEN STInstall a 800-amp electrical service with 9 meter packs, including proper grounding and bonding. Install one (1) 250-amp subpanel for the house panel, and one (1) 125-amp subpanel
EP-2026-0058762026-07-10Electrical400 MARKET STProvide new electrical work to support installation of a one-stop elevator including branch circuit wiring, lighting, and associated fire alarm modifications at elevator and roofto
EP-2026-0048712026-06-09Electrical1301-25 CHESTNUT STComplete electrical and fire alarm alterations for new tenant fitout space located on the 5th floor per plans and NEC 2017, NFPA 72 2016. Install lighting, light switches, lightin
EP-2026-0042652026-05-18Electrical210 S 12TH ST
EP-2026-0043392026-05-15Electrical4401 HOLDEN ST
EP-2026-0043432026-05-13Electrical4401 HOLDEN ST
EP-2026-0043412026-05-13Electrical4401 HOLDEN ST
EP-2026-0043422026-05-13Electrical4401 HOLDEN ST
EP-2026-0009552026-05-07Electrical4401 HOLDEN ST
EP-2026-0038072026-05-05Electrical1300 MARKET ST
EP-2026-0033412026-04-27Electrical1801-21 MARKET ST
EP-2026-0019282026-04-23Electrical1300 MARKET ST
EP-2026-0019692026-04-14Electrical4131 UNRUH AVE
EP-2026-0031152026-04-10Electrical1300 MARKET ST
EP-2026-0016732026-03-25Electrical210 S 12TH ST
EP-2026-0020482026-03-11Electrical4131 UNRUH AVE
EP-2026-0005062026-03-03Electrical1801-21 MARKET ST
EP-2026-0002722026-03-03Electrical200 S BROAD ST
EP-2026-0010192026-02-05Electrical4401 HOLDEN ST
EP-2025-0111292026-01-28Electrical1300 PATTISON AVE
EP-2026-0005182026-01-28Electrical1801-21 MARKET ST
EP-2026-0003522026-01-19Electrical200 S BROAD ST
EP-2025-0111252026-01-06Electrical1300 PATTISON AVE
EP-2025-0092462025-12-13Electrical2150 S 3RD ST
EP-2025-0089672025-12-13Electrical2150 S 3RD ST
EP-2025-0092452025-12-13Electrical2150 S 3RD ST
EP-2025-0089812025-12-13Electrical2150 S 3RD ST
EP-2025-0089702025-12-13Electrical2150 S 3RD ST
EP-2025-0089582025-12-13Electrical2150 S 3RD ST
EP-2025-0089592025-12-13Electrical2150 S 3RD ST
EP-2025-0089502025-12-13Electrical2150 S 3RD ST
EP-2025-0089642025-12-13Electrical2150 S 3RD ST
EP-2025-0088392025-12-13Electrical2150 S 3RD ST
EP-2025-0089722025-12-13Electrical2150 S 3RD ST
EP-2025-0089632025-12-13Electrical2150 S 3RD ST
EP-2025-0089692025-12-13Electrical2150 S 3RD ST
EP-2025-0111192025-12-02Electrical1300 PATTISON AVE
EP-2025-0111282025-11-26Electrical1300 PATTISON AVE
EP-2025-0081402025-09-18Electrical2349 S FRONT ST
EP-2025-0081422025-09-18Electrical2351 S FRONT ST
EP-2025-0085602025-09-18Electrical210 S 12TH ST
EP-2025-0067242025-08-01Electrical1530 CHESTNUT ST
EP-2025-0056162025-06-17Electrical210 S 12TH ST
EP-2025-0037212025-05-27Electrical34-40 S 11TH ST
EP-2025-0038612025-04-23Electrical34-40 S 11TH ST
EP-2025-0017952025-04-21Electrical400 MARKET ST
EP-2025-0028322025-04-01Electrical1701 MARKET ST

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →