COMPANY RECORD · PHILADELPHIA, PA
Daniel Gramlich — permit history in Philadelphia, PA
Daniel Gramlich appears on 34 Philadelphia permit records from 2021 through 2026, all of them electrical.
How Daniel Gramlich compares in Philadelphia
In 2025, Daniel Gramlich filed 3 electrical permits in Philadelphia — 326th of 610 companies named on electrical permits that year. Across all records since 2021, it ranks 264th of 1,021 with 34 electrical permits.
Ranked by the number of permits in the company's main category, among every company named on such permits in Philadelphia records — not only those with a page here. Companies with equal counts share a place. Filing volume measures activity, not quality.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Electrical | 34 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 10 |
| 2022 | 7 |
| 2023 | 4 |
| 2024 | 5 |
| 2025 | 3 |
| 2026 | 5 |
Busiest year on record: 2021, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Names on the same project timelines
| Name in source | Linked permits | Last seen |
|---|---|---|
| Holly-Wood III Construction Inc | 7 | 2022-06-08 |
| Colleen Harter | 6 | 2026-09-17 |
| Amt Construction Inc | 5 | 2024-05-16 |
| Builders Group Inc | 2 | 2025-03-05 |
| Constantine Brothers Contracting LLC | 2 | 2026-10-22 |
| R Maxwell Construction Co., Inc | 1 | 2023-05-29 |
| Ronald Zatyko | 1 | 2021-10-13 |
7 named participants share a resolved project timeline with Daniel Gramlich. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 3815 BROOKVIEW RD | 2026-10-22 |
| 301 S BROAD ST | 2026-09-17 |
| 1706 RITTENHOUSE SQ | 2026-07-10 |
| 130 S 18TH ST | 2026-05-28 |
| 511 SPRUCE ST | 2025-06-26 |
| 1242 SOUTHAMPTON RD | 2025-03-05 |
| 3612 W CROWN AVE | 2024-08-20 |
| 1216 STEVENS RD | 2024-06-18 |
| 731 MOORE ST | 2024-05-16 |
| 727 SNYDER AVE | 2024-04-09 |
| 2121 SPRUCE ST | 2024-02-12 |
| 7101 MILNOR ST | 2023-12-14 |
| 3921-61 N 5TH ST | 2023-05-29 |
| 1901-05 WALNUT ST | 2023-05-29 |
32 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Amt Construction Inc | 6 | 2021–2024 |
| David R Smith | 5 | 2021–2024 |
| Colleen Harter | 4 | 2024–2026 |
| Matthew Beeco | 4 | 2021–2022 |
| Holly-Wood III Construction Inc | 4 | 2021–2022 |
| Mc Architectural LLC | 4 | 2021–2022 |
| A&V Mechanical Services Inc | 3 | 2023–2026 |
| Oneida Fire Protection Inc | 3 | 2021–2022 |
Companies that also appear in Philadelphia permit records at addresses where Daniel Gramlich filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
34 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| EP-2026-009201 | 2026-10-22 | Electrical | 3815 BROOKVIEW RD | Electrical Permit for combo RP-2026-006833 | |
| EP-2026-008921 | 2026-09-17 | Electrical | 301 S BROAD ST | Electrical Permit for combo CP-2026-005206 | |
| EP-2026-005140 | 2026-08-17 | Electrical | 301 S BROAD ST | Install dimmer switches and associated wiring for lighting controls. Provide wiring and connections for lighting fixtures serving artwork and wall-mounted sconces. Relocate exis | |
| EP-2026-005211 | 2026-07-10 | Electrical | 1706 RITTENHOUSE SQ | From the existing electrical panel, install a feeder and one (1) new 60-amp subpanel, including all required overcurrent protection. From the new subpanel, install one (1) 40-amp d | |
| EP-2026-004466 | 2026-05-28 | Electrical | 130 S 18TH ST | Install all lighting , receptacles,smoke alarms, relocated panels relocated fire alarm notification appliances. ALL WORK IS TO BE DONE ACCORDI9NG TO APPROVED DRAWINGS.-2017 NEC,201 | |
| EP-2025-005725 | 2025-07-14 | Electrical | 1706 RITTENHOUSE SQ | Electrical Permit for combo CP-2025-002531 | |
| EP-2025-005253 | 2025-06-26 | Electrical | 511 SPRUCE ST | Whole home renovation of single family dwelling. Eliminate knob and tube wiring. Rewire to according to 2017 NEC. Includes new panel, 38 duplex outlets, 16 lighting receptacles, 15 | |
| EP-2024-009658 | 2025-03-05 | Electrical | 1242 SOUTHAMPTON RD | Electrical Permit for combo RP-2024-000471 | |
| EP-2024-008071 | 2024-08-20 | Electrical | 3612 W CROWN AVE | 4 recessed lights, 1 ceiling fan, and 2 outlets in roof over deck | |
| EP-2024-005504 | 2024-06-18 | Electrical | 1216 STEVENS RD | Second story addition on single family dwelling unit. Bedrooms and bathroom to be wired per NEC. Apx 15 receptacle outlets, 16 recessed lights, 8 switches, 3 new circuits | |
| EP-2024-004661 | 2024-05-16 | Electrical | 731 MOORE ST | Full renovation of 2 story single family dwelling unit. New 200A electrical service. All new wiring throughout. Recessed lighting throughout. Apx. 30 outlets, 15 switches, electric | |
| EP-2024-002689 | 2024-04-09 | Electrical | 727 SNYDER AVE | INSTALL 200 AMP ELECTRICAL SERVICE WITH PROPER GROUNDING AND CIRCUIT BREAKER PANEL. INSTALL 100 AMP SUBPANEL FOR EACH APARTMENT ACCORDING TO THE 2017 NEC. | |
| EP-2024-001211 | 2024-02-12 | Electrical | 2121 SPRUCE ST | Renovation of single-family dwelling unit. Installation of approximately 15 lights, 3 bathroom exhaust fans, power circuit required for the addition of an elevator, re-routing of m | |
| EP-2023-010566 | 2023-12-14 | Electrical | 7101 MILNOR ST | Low Voltage: -500 CAT6 cables and fiber optic cables -Low voltage, Voice, Data & CCTV GC: Ryan Companies CABLING AND DEVICES ONLY. OTHER ELECTRICAL CONTRACTOR PROVIDED CONDUIT. | |
| EP-2023-004167 | 2023-05-29 | Electrical | 3921-61 N 5TH ST | Low voltage telephone and data work. Total wire runs 43, patch panel, wall Mount rack, 5 outdoor cameras, 15 indoor cameras, 3 wap’s, 5 wall phones, 15 Ethernet drops as per 2017 n | |
| EP-2023-004292 | 2023-05-29 | Electrical | 1901-05 WALNUT ST | SINGLE FAMILY CONDO RENOVATION PROJECT. NEW 60AMP ELECTRICAL PANEL INSTALLED. UTILIZE SOME EXISTING WIRING. RUN NEW WIRING WHERE NEEDED. INSTALL APX. 30 NEW LIGHTING FIXTURES, 12 S | |
| EP-2023-000151 | 2023-01-09 | Electrical | 9631 TORRESDALE AVE | FIRST FLOOR RENOVATIONS. RUN ALL NEW ELECTRICAL FOR KITCHEN. REWIRE OPEN FLOOR SPACE FOR GENERAL PURPOSE RECEPTACLE OUTLETS. INCLUDES RECESSED LIGHTING THROUGHOUT. INCLUDES NEW REC | |
| EP-2022-011731 | 2022-12-01 | Electrical | 1022 FERNON ST | WHOLE HOUSE REWIRE. 200A SERVICE. NEW WIRING THROUGHOUT. AFCI AND GFCI WHERE REQUIRED. UP TO 40 RECESSED LIGHTS THROUGHOUT. NEW LIGHTS INSTALLED. NEW RECEPTACLE OUTLETS AND SWITCHE | |
| EP-2022-001596 | 2022-06-08 | Electrical | 2830 W OXFORD ST | All new wiring throughout. New 300A Service drop for 4-gang meter enclosure, 3 new panelboards(1 for each unit&1 house), recessed lighting throughout,110v interconnected smoke alar | |
| EP-2022-005637 | 2022-06-06 | Electrical | 9280 KREWSTOWN RD | Remove 4 light fixtures and install 9 new. Relocate 3 outlets for new pick up counter as per 2017 nec | |
| EP-2022-005531 | 2022-06-05 | Electrical | 1324 MCCLELLAN ST | SINGLE FAMILY DWELLING WHOLE HOUSE RE-WIRE. NEW 200A SERVICE RECESSED LIGHTING THROUGHOUT RECEPTACLE OUTLETS THROUGHOUT HARDWIRED SMOKE DETECTORS THROUGHOUT AFCI AND GFCI PROTECTIO | |
| EP-2022-005253 | 2022-06-03 | Electrical | 1824 S JUNIPER ST | SINGLE FAMILY DWELLING WHOLE HOUSE RE-WIRE. NEW 200A SERVICE RECESSED LIGHTING THROUGHOUT RECEPTACLE OUTLETS THROUGHOUT HARDWIRED SMOKE DETECTORS THROUGHOUT AFCI AND GFCI PROTECTI | |
| EP-2022-001593 | 2022-02-22 | Electrical | 1545 N MARSTON ST | Single family dwelling unit to be wired per 2014 NEC. New 200A service. Recessed Lighting throughout, new wiring throughout, whole house renovation. | |
| EP-2022-001047 | 2022-02-08 | Electrical | 13451 STEVENS RD | Interior wiring of an existing single family dwelling connected to the existing service per the 2014 NEC. | |
| EP-2021-013593 | 2021-12-03 | Electrical | 921 MOUNTAIN ST | Whole house renovation project. New 200A service. All new wiring throughout compliant with 2014 NEC. Recessed lighting throughout. Includes finished basement. | |
| EP-2021-010688 | 2021-10-13 | Electrical | 3714 WESTHAMPTON DR | Renovation work in existing single family dwelling unit. Kitchen - new circuits run for kitchen appliances/countertops. Recessed lighting throughout. Living Room - recessed lightin | |
| EP-2021-010532 | 2021-09-22 | Electrical | 1440 N PERTH ST | Installation of a 200 amp service with (2) 100 amp subpanels, branch circuit wiring, light fixtures, receptacles, switches, AC disconnects, cable drops and 120volt interconnected s | |
| EP-2021-008144 | 2021-09-10 | Electrical | 532 MIFFLIN ST | Whole house re-wire, 200A service, recessed lighting throughout, interconnected hard-wired smoke/carbon monoxide detectors throughout, new devices throughout as per 2014 NEC | |
| EP-2021-003036 | 2021-07-12 | Electrical | 9855-89 BUSTLETON AVE | FOR INTERIOR ALTERATIONS TO EXISTING STRUCTURE, INCLUDING NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, TO EXPAND EXISTING PHARMACY WITHIN THE EXISTING STRUCTURE, AS PER APPROVED | |
| EP-2021-005236 | 2021-06-01 | Electrical | 5843-45 RISING SUN AVE | FOR INTERIOR ALTERATIONS TO EXPAND THE PHARMACY WITHIN THE EXISTING CVS, TO INCLUDE NEW INTERIOR PARTITIONS AND INTERIOR FINISHES, AS PER APPROVED PLANS. | |
| EP-2021-000790 | 2021-05-24 | Electrical | 2275 BRIDGE ST | LOW VOLTAGE CABLING - Data and Voice Cat6 plenum cabling as per 2017 nec | |
| EP-2021-002658 | 2021-03-23 | Electrical | 6150-60 N 5TH ST | FOR LEVEL 2 ALTETRATIONS TO EXPAND PHARMACY SPACE IN THE EXISTING RETAIL STORE AS PER PLANS. | |
| EP-2020-011514 | 2021-02-04 | Electrical | 12451 SWEET BRIAR RD | Wiring for hot tub per manufacturer's specifications and 2014 NEC. | |
| EP-2020-003700 | 2021-01-12 | Electrical | 5361-91 CHEW AVE | NEW OUTLETS AND LIGHTS FOR TEMPORARY PHARMACY |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 34 permits above are a static record through 2026. Select a year above to open that year’s records, or search Daniel Gramlich in Philadelphia, PA by address, trade or date range.
Source and limits
Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
