COMPANY RECORD · PHILADELPHIA, PA

Circle Construction Group — permit history in Philadelphia, PA

Circle Construction Group appears on 14 Philadelphia permit records from 2021 through 2026, most often building (78.6% of the record).

Permit categories

CategoryPermitsShare
Building1178.6%
Zoning321.4%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20211
20233
20243
20256
20261

Busiest year on record: 2025, with 6 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Roger Ross Plumbing-Heating Inc92026-01-29
Hard Hat Services LLC42026-03-05
Tomblin Electrical Services LLC32024-12-06
Amplified Technical Solutions, LLC22026-03-03
Atlantic Fire Equipment Co Inc22025-09-16
B M Consulting Services Inc12023-07-24
Oliver Sprinkler Co., Inc.12025-08-25

7 named participants share a resolved project timeline with Circle Construction Group. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
2900 ISLAND AVE2026-01-30
413-33 OREGON AVE2025-08-06
2037 S BROAD ST2025-07-17
5675 N FRONT ST2025-06-06
1624-32 COTTMAN AVE2024-10-28
2281 OREGON AVE2024-09-27
5822-26 E ROOSEVELT BLVD2024-09-25
551 FRANKLIN MILLS CIR2023-08-29
3737 CHESTNUT ST2023-04-19
2345 VARE AVE2023-03-20
4700-08 N BROAD ST2021-07-12

11 distinct addresses on record. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Roger Ross Plumbing-Heating Inc52023–2025
Oliver Sprinkler Co., Inc.22025
Klehr Harrison Harvey Branzburg LLP22021–2025
Amplified Technical Solutions, LLC12025–2026
Jamaal Sterling12025
Best Choice Plumbing Inc..12025
Tandem Associates Inc12024–2026
Keystone Fire Protection Co12024–2026

Companies that also appear in Philadelphia permit records at addresses where Circle Construction Group filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

14 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
ZP-2026-0004772026-01-30Zoning2900 ISLAND AVEFOR THE ERECTION OF FOUR (4) STATICALLY ILLUMINATED ACCESSORY FLAT WALL SIGNS AND ONE STATICALLY ILLUMINATED DOUBLE-FACED ACCESSORY FREESTANDING SIGN. SIZE AND LOCATION AS SHOWN IN
CP-2024-0039422025-12-05Building2900 ISLAND AVEFOR LEVEL II ALTERATIONS/SUBSTANTIAL IMPROVEMENT TO INCLUDE DRY FLOODPROOFING, NEW CANOPIES, EXTERIOR WALL, NEW PARTITIONS, FLOORING, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVE
ZP-2025-0031742025-08-06Zoning413-33 OREGON AVEFOR THE ERECTION OF TWO (2) ACCESSORY STATICALLY ILLUMINATED FLATWALL SIGN. SIZE AND LOCATION AS SHOWN IN THE PLAN.
ZP-2025-0042022025-07-17Zoning2037 S BROAD STFOR THE ERECTION OF TWO (2) STATICALLY ILLUMINATED PROJECTING SIGNS AND TWO (2) STATICALLY ILLUMINATED WALL SIGNS.
CP-2025-0019822025-06-06Building5675 N FRONT STFOR PARTIAL DEMOLITION, EXTERIOR ALTERATIONS INCLUDING THE ERECTION OF CANOPIES, AND LEVEL II INTERIOR ALTERATIONS WITHOUT A CHANGE IN USE & OCCUPANCY CLASSIFICATION TO AN EXISTING
CP-2024-0057572025-01-14Building413-33 OREGON AVEFOR EXTERIOR AND LEVEL II INTERIOR ALTERATIONS WITH NO CHANGE TO GROUP A-2 RESTAURANT OCCUPANCY IN AN EXISTING ONE (1) STORY DETACHED STRUCTURE. BUILDING SPRINKLERED PER NFPA 13. A
CP-2024-0066832025-01-10Building2037 S BROAD STFOR LEVEL III ALTERATIONS WITH NO CHANGE IN OCCUPANCY. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL AND PLUMBING WORK. *NO SIGNS APPROVED UNDER THIS PERMIT; SEPARATE PERM
CP-2024-0039412024-10-28Building1624-32 COTTMAN AVEFOR LEVEL III ALTERATIONS TO AN EXISTING TENANT SPACE. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVMENTS THROUGHOUT
CP-2024-0039402024-09-27Building2281 OREGON AVEFOR INTERIOR AND EXTERIOR REPAIRS INCLUDING RECONSTRUCTION OF A PORTION OF THE EXTERIOR WALL AT A DRIVE-THRU SERVICE WINDOW WITH NO CHANGE TO EXISTING GROUP A-2 TAKE-OUT RESTAURANT
CP-2024-0042812024-09-25Building5822-26 E ROOSEVELT BLVDFOR A LEVEL I INTERIOR ALTERATIONS TO AN EXISTING TENANT SPACE. ALTERATION TO INCLUDE FINISHES UPGRADE, FURNISHING AND ACCESSIBILITY IMPROVEMENTS FOR THE EXISTING RESTROOMS. LIMIT
CP-2023-0037722023-08-29Building551 FRANKLIN MILLS CIRFOR LEVEL III ALTERATIONS TO AN EXISTING TAKEOUT RESTAURANT ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILITY IMPROVEMENTS THRO
CP-2023-0002032023-04-19Building3737 CHESTNUT STFOR THE LEVEL II ALTERATION TO CREATE A PREPARED FOOD SHOP WITHIN THE EXISTING TENANT SPACE AS PER APPROVED PLANS. BUILDING IS FULLY SPRINKLERED. SEPATATE PERMITS REQUIRED FOR MEP
CP-2023-0005202023-03-20Building2345 VARE AVEFOR LEVEL II ALTERATIONS TO INCLUDE EXTERIOR WORK, NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WOR
CP-2021-0031272021-07-12Building4700-08 N BROAD STLEVEL II INTERIOR ALTERATIONS (NO CHANGE OF OCCUPANCY) TO AN EXISTING TAKE-OUT RESTAURANT. ALTERATION TO INCLUDE THE DEMOLITION AND RECONSTRUCTION OF PARTITION WALLS. EXTERIOR COSM

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Search these records

The 14 permits above are a static record through 2026. Select a year above to open that year’s records, or search Circle Construction Group in Philadelphia, PA by address, trade or date range.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.