COMPANY RECORD · PHILADELPHIA, PA

Charles H Macdonald Electric I — permit history in Philadelphia, PA

Charles H Macdonald Electric I appears on 94 Philadelphia permit records from 2021 through 2026, all of them electrical.

Permit categories

CategoryPermitsShare
Electrical94100%

Activity by year

YearPermits issued
202110
202220
202317
202411
202517
202619

Busiest year on record: 2022, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.

PROJECTS AHEAD SEARCH

Search every Philadelphia permit, not only this company's

This page is a snapshot of Charles H Macdonald Electric I. The search behind it holds more than 242,223 Philadelphia permits naming a contractor, since 2021: 82,008 plumbing permits, 51,127 electrical permits, 25,710 mechanical permits, 25,367 residential building permits, 24,512 zoning permits.

  • Search the full history by company, address, permit type or date range.
  • Set an alert and get an email when a new permit matches — the next permit Charles H Macdonald Electric I files, or any new electrical permit in Philadelphia. A new permit is an early signal of work to bid on, supply or finance.
  • Export to CSV for your CRM or spreadsheet.

Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans

Names on the same project timelines

Name in sourceLinked permitsLast seen
David Horlacher102026-10-15
Structure Tone LLC102026-07-16
Clemens Construction Co Inc..62026-02-20
The Sullivan Company42026-10-15
Intech Construction LLC32022-05-24
Flatiron Building Company22026-07-31
Builders Inc.22024-04-22
Buch Construction Inc12026-07-17
Elc Holding Company12024-12-04
D Lauro & Rodgers Inc12026-07-23
Cyma Builders & Construction Managers Inc12022-05-27
Athena Contracting Inc12025-07-14

24 named participants share a resolved project timeline with Charles H Macdonald Electric I. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
3002-24 MARIO LANZA BLVD2026-10-27
8000-02 LYONS AVE2026-10-26
301 S BROAD ST2026-10-15
125 S 31ST ST2026-10-15
130 S 18TH ST2026-09-30
5400 CITY AVE2026-09-01
3711 MARKET ST2026-08-28
33 N BROAD ST2026-08-17
1717 ARCH ST2026-08-14
3600-90 WALNUT ST2026-07-31
1420-34 PINE ST2026-07-23
135 S 17TH ST2026-07-17
1835 MARKET ST2026-07-16
3401 GRAYS FERRY AVE2026-06-15

64 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Independence Fire Sprinkler Company92021–2026
Oliver Sprinkler Co., Inc.82021–2026
Herman Goldner Co Inc62021–2026
Hunter Mechanical Inc62021–2026
Lor-Mar Mechanical Services LLC62021–2025
A & S Sprinkler Co Inc52021–2026
The Sullivan Company52023–2026
Stephanie Rumer52021–2026

Companies that also appear in Philadelphia permit records at addresses where Charles H Macdonald Electric I filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

94 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
EP-2026-0097542026-10-27Electrical3002-24 MARIO LANZA BLVDInstallation of new AFCI plug-in breakers for code compliance per Electrical Permit Drawing E-4.1 and 2017 NEC. Scope of work includes terminations of the new AFCI breakers ONLY.
EP-2026-0097662026-10-26Electrical8000-02 LYONS AVEInstallation of new AFCI plug-in breakers for code compliance per Electrical Permit Drawing E-4.1. Scope of work includes terminations of the new AFCI breakers ONLY. Total Subcontr
EP-2026-0091312026-10-15Electrical301 S BROAD STInstall lighting fixtures, light switches, wiring devices, and TV receptacles. All work to be perform according to the 2020 NEC and per approved plans.
EP-2026-0097322026-10-15Electrical125 S 31ST STInstallation of electrical wiring devices and new circuit breakers for existing panelboards per 2020 NEC and Electrical Permit drawings dated 8/10/26.
EP-2026-0085892026-09-30Electrical130 S 18TH STPer the Historical Commission: No exterior work permitted as part of this permit. Demolition of existing light fixtures as shown on Electrical Permit Drawings. Relocation of exist
EP-2026-0078112026-09-01Electrical5400 CITY AVEProvide interior electrical wiring for the kitchen, dining area, and corridor of a university facility, including lighting fixtures, lighting controls, switches, and receptacle out
EP-2026-0077782026-08-28Electrical3711 MARKET STLevel II interior alteration to partial 7th floor. Demolition of existing space, new branch circuiting from existing panelboards, new lighting and controls as per 2017 NEC. Instal
EP-2026-0063232026-08-17Electrical33 N BROAD STInstall fire alarm system as per 2016 NFPA 72. Basement — FA-02 • Installation: o (5) ceiling-mounted strobe lights o (15) ceiling-mounted horn/strobes o (10) wall-mounted horn/st
EP-2026-0061112026-08-14Electrical1717 ARCH STInstall new 100 amp panel. Install lighting, lighting switches and controls, receptacles, telecommunications wiring, and power to equipment as per 2017 NEC. Install fire alarm de
EP-2026-0053532026-07-31Electrical3600-90 WALNUT STElectrical alterations on 1st, 2nd, and 4th floors. Fire alarm device installed in the 4th-floor bathroom; all work per approved plans
EP-2026-0055832026-07-23Electrical1420-34 PINE STFurnish and install new light fixtures as noted on the electrical drawings. Furnish and install new power devices as noted on electrical drawings. ***NO FIRE ALARM ON THIS PERMIT**
EP-2026-0046272026-07-17Electrical135 S 17TH STPerform electrical fit-out associated with renovation and ADA site improvements for the existing Capital One Café tenant space. Work includes providing complete interior electrical
EP-2026-0064052026-07-16Electrical1835 MARKET STElectrical Permit for combo CP-2026-003554 AMENDMENT: Modify existing fire alarm system. Provide new devices, relocate and demo existing devices as per plans and 2016 NFPA 72.
EP-2026-0037332026-06-15Electrical3401 GRAYS FERRY AVEInstallation of a 100amp feed 480 volt from adjacent building ECR to transit garage, to a 45kva transformer 480/208-120 volt mounted in garage. This transformer will feed a 200 amp
EP-2026-0024332026-04-30Electrical2039 CHERRY STINSTALL NEW PANELS, UTILIZING THE EXISTING BACK BOXES AT THE PANEL LOCATIONS A, B, C, D, AND F. A NEW PANEL WITH A NEW BACK BOX AT PANEL LOCATION E. FIELD EVALUATION AND INSPECTION
EP-2026-0031882026-04-30Electrical6226 ELMWOOD AVECMD will install cameras throughout the school.
EP-2026-0019582026-03-20Electrical1600-18 ARCH STAlteration of First Floor Lobby and and 20th floor roof-top patio, to include furnishing and installing: a new power panelboard and transformer per drawings E320, E321, and E600; w
EP-2026-0017242026-03-13Electrical301 S BROAD STInstall new electrical wiring to serve the installation of lighting, switches, and a new receptacle in the laundry closet. Relocate one (1) existing duplex receptacle to accommod
EP-2026-0006782026-02-20Electrical1700-20 BENJAMIN FRANKLIN PKWYInstallation of light fixtures and receptacles in the lobby and bathrooms 1st floor. All work to be done per plans. 1 Horn and strobe relocated in the lobby, per plans
EP-2025-0104562025-12-08Electrical201 N 17TH STReplacement of 24 sconces and 20 chandeliers at existing j-box locations in meeting rooms, like for like, no wiring.
EP-2025-0096742025-10-28Electrical3400 MARKET STINSTALL NEW 200 AMP SUBPANEL. INSTALL CONDUIT AND WIRING FROM SUBPANEL TO POWER THE INSTALLATION OF THREE 4 HEAD POLE LIGHTS. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC.
EP-2025-0063392025-09-22Electrical1900-34 JOHN F KENNEDY BLVDInstall new transformer sections in Olson Triplex transformer 1500kva cu copper Disconnect temporary transformer from primary. Provide connection to existing distribution via buss
EP-2025-0052272025-08-29Electrical3501 CHESTNUT STInstall new light fixtures and new power devices as shown on electrical drawings and as per 2017 NEC. Install new fire alarm devices as shown on fire alarm drawings and as per 201
EP-2025-0075752025-08-22Electrical301 S BROAD STMacDonald Electric will furnish and install new light fixtures as shown on drawing E3002.1 MacDonald Electric will furnish and install new power devices as shown on drawing E3002.1
EP-2025-0078202025-08-19Electrical5400 CITY AVEFurnish and install new power devices as shown on the electrical drawings Furnish and install new lighting fixtures and lighting controls as shown on the electrical drawings. Reloc
EP-2025-0069822025-08-04Electrical3624 MARKET STREMOVE OLD GENERATOR AND INSTALL 100 KW 480/277 VOLT 3 PHASE GENERATOR IN THE SAME LOCATION. THE EXISTING TRANSFER SWITCH WILL REMAIN. ALL WORK TO BE DONE ACCORDING TO THE 2017
EP-2025-0069122025-08-01Electrical3151 MARKET STFire Alarm system rough in and installation to be tied into existing building fire alarm system as per 2016 NFPA 72.
EP-2025-0044822025-07-14Electrical440 N BROAD STNew receptacles and data drops within renovated area. Power and data is served from existing sources located in adjacent storage room. New lighting and lighting controls are provid
EP-2025-0056662025-06-27Electrical225 N 38TH STINSTALL 120 AMP AND A 60 AMP ACCUSINE PCB UNIT AND ATTACH EACH TO A SWITCHBOARD. .INSTALL TWO SET OF 3 CURRENT TRANSFORMERS AND WIRE EACH SET BACK TO THE ACCUSINE PCB UNITS. A
EP-2025-0055512025-06-26Electrical5600 CITY AVEMacDonald Electric will furnish and install new power devices as shown on the drawings. MacDonald Electric will furnish and install new light fixtures as shown on the drawings. Mac
EP-2025-0042622025-05-16Electrical301 S BROAD STInstall Electrical power for fireplace & TV Operation. Install lights inside closet(s), Install receptacle (1) Inside closet as per 2017 NEC.
EP-2025-0036792025-05-05Electrical1419-27 ARCH STMODIFY EXISTING FIRE ALARM SYSTEM. PROVIDE NEW DEVICES, RELOCATE AND DEMO EXISTING DEVICES ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS.
EP-2025-0035642025-04-28Electrical3025-53 MARKET STLevel II alteration of partial 1st floor and partial lower mezzanine including power panelboards, light fixtures and controls, wiring devices as per 2017 NEC. Modify fire alarm sy
EP-2025-0001922025-04-16Electrical3501 CHESTNUT STInstall lighting, lighting controls, receptacles, new electrical panels as shown on single-line diagram, and power to equipment as per 2017 NEC. Install fire alarm as per 2016 NFP
EP-2024-0122902025-02-28Electrical3601-51 WALNUT STInstall fire pump feeders IN EXISTING CONDUIT . COORDINATE ANY POSSIBLE POWER OUTAGES W/ PECO AND FIELD ENGINEER. o install 1 new 350mcm power cable o 2 make 9 tee bodies in box o
EP-2025-0008752025-02-18Electrical130 S 18TH STWe will furnish and install new lighting off of the existing lighting circuit as required in the bathroom. We will furnish and install new GFCI off of the existing power circuit as
EP-2024-0117942024-12-16Electrical1419-27 ARCH STINSTALL NEW WIRING, LIGHTING, SWITCHES AND RECEPTACLE OUTLETS ON THE FIRST AND SECOND FLOORS. RELOCATE SEVERAL RECEPTACLE OUTLETS, LIGHTING, SWITCHES AND EMERGENCY EXIT LIGHTING O
EP-2024-0110332024-12-04Electrical630 W MOUNT AIRY AVEINSTALL WIRING, DISCONNECT SWITCH, LIGHTING, RECEPTACLE OUTLETS, GROUNDING AND BONDING FOR POOL AND PATIO AREA ACCORDING TO THE 2017 NEC.
EP-2024-0090302024-12-02Electrical5400-14 OVERBROOK AVEInstall new voice fire alarm system as noted on the fire alarm drawing throughout the facility. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72.
EP-2024-0104402024-11-06Electrical1625-37 MARKET STInstall : b. Removal / install of ATS, generator, battery charger, block heater. c. Install (3) circuits 120v circuits d. Anchoring of new generator. e. Start up and commissioning
EP-2024-0063852024-08-13Electrical2716 SOUTH STInterior fit out of a new core and shell research building. Scope of work is limited to branch circuiting from load side of panelboards, lighting and lighting controls, receptacles
EP-2024-0046122024-06-20Electrical1050 CONSTITUTION AVERELOCATE EXISTING & INSTALL NEW LIGHT FIXTURES NORMAL & EMERGENCY CONNECTED TO THE EXISTING CIRCUITING. INSTALL NEW SWITCHES & SENSORS. INSTALL NEW RECEPTACLES, FURNITURE FEEDS & P
EP-2024-0056312024-06-17Electrical2929 ARCH STInterior alterations of the 8th floor including power panelboards, light fixtures and controls, wiring devices, and fire alarm modifications to be tied into the existing system. AL
EP-2024-0046522024-06-06Electrical5400 CITY AVEMacDonald Electric will furnish and install all new light fixtures and lighting controls per the electrical drawings. MacDonald Electric will furnish and install all new branch cir
EP-2024-0041262024-05-01Electrical5600 CITY AVEMacDonald Electric will furnish and install new electrical devices and branch circuits per the electrical drawings E202.1 and E-203.1. MacDonald Electric will furnish and install (
EP-2024-0036862024-04-22Electrical5400-14 OVERBROOK AVEAMENDMENT: Include Renovations To Additional Classroom and Office Space On The First Floor As Per Approved Plans. Install lighting, receptacles, and occupancy sensors, and power
EP-2024-0011802024-02-16Electrical3501 CHESTNUT STAMENDMENT: In accordance with the International Existing Building Code, existing copper clad aluminum Type NM cable (no longer permitted by the NEC in this building/structure) wil
EP-2023-0116572023-12-28Electrical1050 CONSTITUTION AVESelective demolition of existing wiring devices and lighting. Installation of new wiring devices and lighting to existing panelboards as per 2017 NEC. Demolition of existing fire a
EP-2023-0104772023-11-30Electrical3400 W GIRARD AVEDemolition of existing raceways and conductors to existing equipment. Replacement of raceways and conductors with new. Installation of new VFDs, Disconnect Switches, and Panelboard
EP-2023-0109892023-11-27Electrical3620 G STInstall new circuits to new equipment utilizing existing distribution equipment.-2017 NEC.

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.