COMPANY RECORD · PHILADELPHIA, PA

Charles G. Hunter III — permit history in Philadelphia, PA

Charles G. Hunter III appears on 204 Philadelphia permit records from 2021 through 2026, all of them fire suppression.

Permit categories

CategoryPermitsShare
Fire Suppression204100%

Activity by year

YearPermits issued
20216
20228
202360
202458
202532
202640

Busiest year on record: 2023, with 60 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Dale Corporation1312026-07-22
Turner Construction Co82025-03-05
Daniel J. Keating Company72026-06-24
Wolfe Scott Associates, Inc52026-06-22
Magnum, Inc.22026-05-13
Tricon Construction, LLC22025-11-24
Intech Construction LLC22025-01-31
Bittenbender Construction LP12023-10-03
Caritas Management LLC12025-08-04
Domus, Inc.12025-01-06
Northwood Constr Co Inc12025-01-06
Ingerman Construction Management, LLC12023-06-15

21 named participants share a resolved project timeline with Charles G. Hunter III. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
1421 WALNUT ST2026-10-16
2200 OREGON AVE2026-10-16
635-53 E ERIE AVE2026-09-29
2443 N 11TH ST2026-09-10
4401 HOLDEN ST2026-06-24
220-60 S 33RD ST2026-06-22
2701-99 BELMONT AVE2026-05-13
2201-25 OREGON AVE2026-04-07
1924-36 WASHINGTON AVE2025-11-24
2000-24 ARCH ST2025-10-14
7300 FRANKFORD AVE2025-08-04
2301 SHARSWOOD ST2025-05-05
4620R-40 E ROOSEVELT BLVD2025-03-31
2501-29 LOMBARD ST2025-03-31

49 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Durian Electric LLC162022–2026
Dale Corporation162022–2026
Dilworth Paxson Kalish & Kauffman152021–2025
Dwd Mechanical Contractor Inc142022–2024
Bbj Mechanical Inc132022–2023
Daniel J. Keating Company52021–2026
Keegan&Cunnius Plumbing And Mechanical42024–2026
Churchville Mechanical Inc32024–2026

Companies that also appear in Philadelphia permit records at addresses where Charles G. Hunter III filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

204 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
FP-2026-0021432026-10-16Fire Suppression1421 WALNUT STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2026-0021462026-10-16Fire Suppression2200 OREGON AVEEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2026-0020212026-09-29Fire Suppression635-53 E ERIE AVERough-In Permit for FP-2026-001996 Furnish and install sprinkler system in new factory building, per NFPA 13
FP-2026-0013622026-09-10Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 2" MAIN FIRE SERVICE LINE WITH A 4" AMES 2000SS BACKFLOW PREVENTION ASSEMBLY PER APPRO
FP-2026-0008052026-07-22Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008032026-07-22Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008222026-07-22Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008062026-07-22Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008022026-07-22Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0010432026-06-24Fire Suppression4401 HOLDEN STINSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE WITH A 4" AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY AS PER
FP-2026-0010502026-06-24Fire Suppression4401 HOLDEN STINSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIR
FP-2026-0010542026-06-24Fire Suppression4401 HOLDEN STINSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE WITH A 4" AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY AS PER
FP-2026-0010472026-06-24Fire Suppression4401 HOLDEN STINSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13R THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIR
FP-2026-0009182026-06-22Fire Suppression220-60 S 33RD STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2026-0008122026-06-18Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008112026-06-18Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008072026-06-18Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008102026-06-18Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008082026-06-18Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITN NFPA 13D, WITH A TWO-INCH COMBINED FIRE SERVICE LINE, AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A
FP-2026-0008412026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008372026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008442026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008382026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008422026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008432026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008392026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008402026-06-02Fire Suppression2443 N 11TH STFOR THE INSTALLATION OF A NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PL
FP-2026-0008252026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008302026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008242026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008262026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008292026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2025-0016282026-05-13Fire Suppression2701-99 BELMONT AVEINSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT AN EXISTING STRUCTURE. INSTALLATION TO INCLUDE 4" FIRE SERVICE LINE AND 4." RPZ WILKINS 350 AST BACKFLOW PREV
FP-2026-0008232026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008272026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008312026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008282026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0008322026-05-13Fire Suppression2443 N 11TH STINSTALL NEW FIRE SUPPRESSION SYSTEM AND 2” COMBINED SERVICE IN ACCORDANCE WITH NFPA 13D THROUGHOUT THE ENTIRE BUILDING. ALL WORK SHALL COMPLY WITH THE APPROVED PLANS. ALL WORK SHAL
FP-2026-0004542026-04-07Fire Suppression2201-25 OREGON AVEEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0025232026-04-01Fire Suppression220-60 S 33RD STFOR ALTERATIONS TO AN EXISTING NFPA 13 AUTOMATIC WET SPRINKLER SYSTEM TO INSTALL NEW SPRINKLER HEADS AND ASSOCIATED PIPING THROUGHOUT RENOVATED SPACES. ALL WORK TO BE DONE PER APPR
FP-2025-0021802025-11-24Fire Suppression1924-36 WASHINGTON AVEFOR INSTALLATION OF FOUR-INCH FIRE SERVICE LINE, FOUR-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13.
FP-2025-0022992025-11-21Fire Suppression2701-99 BELMONT AVEFire Suppression System Permit for combo SP-2025-001257
FP-2025-0021022025-10-14Fire Suppression2000-24 ARCH STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0021002025-10-14Fire Suppression2000-24 ARCH STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0017992025-08-29Fire Suppression2000-24 ARCH STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0015872025-08-05Fire Suppression2000-24 ARCH STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0015842025-08-05Fire Suppression2000-24 ARCH STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0015862025-08-05Fire Suppression2000-24 ARCH STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0015852025-08-05Fire Suppression2000-24 ARCH STEZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and si
FP-2025-0012222025-08-04Fire Suppression7300 FRANKFORD AVEFOR THE INSTALLATION AND RELOCATION OF SPRINKLER HEADS IN AN EXISTING SYSTEM IN ACCORDANCE WITH NFPA 13 WITH EXISTING 3” FIRE SERVICE AND 3" BACKFLOW PREVENTION ASSEMBLY. ALL WORK

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Other fire suppression contractors in Philadelphia

CompanyPermits on record
Independence Fire Sprinkler Company318
Joseph F Spaeder259
East Coast Business Fire Inc192
Sal Calio177
Precision Sprinkler Services, Inc146
Philadelphia Fire Protection Pros134
Preferred Fire Protection Inc122
Atlantic Fire Equipment Co Inc108

Companies whose main permit category in Philadelphia is also fire suppression, closest to Charles G. Hunter III in filing volume. Listed for comparison, not as a recommendation.

Search these records

The 204 permits above are a static record through 2026. Select a year above to open that year’s records, or search Charles G. Hunter III in Philadelphia, PA by address, trade or date range.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.