COMPANY RECORD · PHILADELPHIA, PA

Alexander Ferrer — permit history in Philadelphia, PA

Alexander Ferrer appears on 200 Philadelphia permit records from 2021 through 2026, most often electrical (43% of the record).

Permit categories

CategoryPermitsShare
Electrical8643%
Plumbing8341.5%
Residential Building189%
Mechanical94.5%
Building21%
Zoning21%

6 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202130
202224
202331
202455
202536
202624

Busiest year on record: 2024, with 55 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Greenzang Inc262026-01-07
Jerome Henry82025-12-29
Andre Omar Freely72026-04-24
Andy Mulson62021-08-18
D & G Total Renovations62024-12-19
Shakira Wilson52024-04-08
Gary Deprado32024-04-01
Libio Matos USA Remodeling Construction32025-01-14
Julians Home Improvement Service Inc32022-07-27
Har-Har Properties LLC32026-04-07
V C Renovations LLC32025-10-03
Silus Brown32024-03-12

42 named participants share a resolved project timeline with Alexander Ferrer. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
1321 N FRONT ST2026-07-07
1042 W INDIANA AVE2026-06-27
2419 N NAPA ST2026-06-08
1509 W NEDRO AVE2026-05-27
3750 MORRELL AVE2026-05-12
1323 N FRONT ST2026-05-12
2908 W GIRARD AVE2026-04-24
2119 N WOODSTOCK ST2026-04-24
3513 HAMILTON ST2026-04-07
2507 N 19TH ST2026-02-22
1505 WIDENER PL2026-01-29
1523 W NORRIS ST2026-01-14
5548-54 CHESTNUT ST2026-01-07
449 S 61ST ST2025-12-29

115 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

200 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
EP-2026-0025972026-07-07Electrical1321 N FRONT STElectrical work includes interior wiring and installation of electrical devices for tenant fit-out as per approved plans plans ***NO FIRE ALARM ON THIS PERMIT***
EP-2026-0058952026-06-27Electrical1042 W INDIANA AVEInstall new 200 amp panel. Complete re-wire of a duplex to include switches, receptacles, lights and 120 smokes detector. All work to be performed according to the 2017 NEC and
EP-2026-0049822026-06-08Electrical2419 N NAPA ST200 AMP panel. 22 new circuits, 55 receptacles, 20 lighting outlets, AFCI GFCI places as needed. 8 AFCI, 4 GFCI outlets. 7 new interconnected smoke alarms and 2 CO detectors
PP-2026-0073732026-05-29Plumbing2419 N NAPA STInstalling 1 kitchen sink, 2 lavatories, 2 water closets, 1 shower/tub, 1 laundry outlet & 1 hot water heater.
MP-2026-0031132026-05-28Mechanical2419 N NAPA STEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from the
EP-2026-0047732026-05-27Electrical1509 W NEDRO AVEComplete rewire as per code, to include receptacles, switches, lights and smoke detector as per code install new 200 amp service. Wiring will be fished through drywall
PP-2026-0071212026-05-27Plumbing1509 W NEDRO AVEReplace fixtures for 2 bathroom group, kitchen sink and hot water heater. *WITHOUT PIPING*
RP-2026-0053402026-05-14Residential Building1509 W NEDRO AVE
RP-2026-0026492026-05-14Residential Building1042 W INDIANA AVE
PP-2026-0064402026-05-12Plumbing3750 MORRELL AVE
PP-2026-0039942026-05-12Plumbing1323 N FRONT ST
RP-2026-0045552026-04-28Residential Building2419 N NAPA ST
PP-2026-0049322026-04-24Plumbing2908 W GIRARD AVE
PP-2026-0054712026-04-24Plumbing2119 N WOODSTOCK ST
EP-2026-0035492026-04-24Electrical2119 N WOODSTOCK ST
EP-2026-0032122026-04-24Electrical2908 W GIRARD AVE
MP-2026-0004422026-04-07Mechanical3513 HAMILTON ST
PP-2026-0018932026-02-22Plumbing2507 N 19TH ST
EP-2026-0012412026-02-19Electrical2507 N 19TH ST
ZP-2026-0016572026-02-18Zoning1042 W INDIANA AVE
PP-2026-0011002026-01-29Plumbing1505 WIDENER PL
RP-2026-0003992026-01-14Residential Building1523 W NORRIS ST
EP-2025-0117882026-01-07Electrical5548-54 CHESTNUT ST
PP-2025-0160152026-01-06Plumbing5548-54 CHESTNUT ST
PP-2025-0165212025-12-29Plumbing449 S 61ST ST
EP-2024-0059792025-12-23Electrical2000-20 E HAGERT ST
EP-2023-0101862025-11-19Electrical2258 E TIOGA ST
RP-2025-0103672025-10-25Residential Building3513 HAMILTON ST
PP-2025-0127502025-10-03Plumbing2643 S BEULAH ST
EP-2025-0088542025-09-11Electrical1337 MASCHER ST
EP-2025-0088552025-09-11Electrical6407 CHELWYNDE AVE
PP-2025-0117802025-09-10Plumbing1337 MASCHER ST
RP-2025-0073872025-08-20Residential Building937 FEDERAL ST
EP-2025-0079452025-08-15Electrical3513 HAMILTON ST
EP-2025-0079162025-08-14Electrical1320 N HOBART ST
PP-2025-0104832025-08-14Plumbing3513 HAMILTON ST
RP-2025-0055102025-07-23Residential Building4975 PENNWAY ST
MP-2025-0034752025-06-26Mechanical5965 CHESTER AVE
PP-2025-0083152025-06-25Plumbing5965 CHESTER AVE
EP-2025-0061462025-06-25Electrical5965 CHESTER AVE
EP-2025-0061422025-06-24Electrical4322-40 N BROAD ST
PP-2025-0083012025-06-24Plumbing4322-40 N BROAD ST
RP-2025-0019922025-06-10Residential Building5965 CHESTER AVE
RP-2025-0036642025-06-02Residential Building2507 N 19TH ST
EP-2024-0108962025-05-15Electrical1422-30 N 8TH ST
EP-2025-0041422025-05-05Electrical762 S 4TH ST
EP-2025-0023052025-04-17Electrical415 QUINCE ST
EP-2025-0014042025-04-09Electrical763 S 4TH ST
PP-2024-0155422025-03-24Plumbing1422-30 N 8TH ST
PP-2025-0032942025-03-11Plumbing415 QUINCE ST

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public Philadelphia permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →