COMPANY RECORD · PHILADELPHIA, PA

Agh Mechanical Inc — permit history in Philadelphia, PA

Agh Mechanical Inc appears on 37 Philadelphia permit records from 2021 through 2025, most often plumbing (81.1% of the record).

Permit categories

CategoryPermitsShare
Plumbing3081.1%
Mechanical718.9%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
202125
20235
20241
20256

Busiest year on record: 2021, with 25 permits. One project can account for several filings, so read this as filing activity rather than workload.

Names on the same project timelines

Name in sourceLinked permitsLast seen
Green Door Building LLC252021-12-01
Candis Pressley22024-02-01
Guardhouse Construction LLC22025-08-20
Shift Builders LLC22023-11-08
Moreco Construction22025-11-06
Columbus Construction LLC12025-08-22
Pullman Sst Inc12025-03-25

7 named participants share a resolved project timeline with Agh Mechanical Inc. A shared timeline is a research lead, not proof of a partnership or a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
913 FILLMORE ST2025-11-06
761 S CLEVELAND ST2025-08-22
2209-11 N BROAD ST2025-08-20
2319-27 FITZWATER ST2025-03-25
301 E GODFREY AVE2024-02-01
3360-64 FRANKFORD AVE2023-11-08
662 E LIPPINCOTT ST2021-12-01
3023 B ST2021-11-30
3067 POTTER ST2021-11-30
3134 WEYMOUTH ST2021-11-11
629 E CLEMENTINE ST2021-11-11
2417 N MYRTLEWOOD ST2021-11-11
3113 HARTVILLE ST2021-11-11
2935 N 25TH ST2021-11-11

31 distinct addresses on record; the 14 most recent are shown. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Also named on permits at the same addresses

CompanyShared addressesYears
Tyree Strickland Electric, LLC182021–2024
Newman Lewis82021
John Rinick12025
Frankie D Plumbing And Heating12025
Mk Fire Protection & Supply, LLC12025
Barry Hassan12025
Reliable Fire & Mechanical, Inc.12023–2026
Echo House General Contracting LLC12023–2026

Companies that also appear in Philadelphia permit records at addresses where Agh Mechanical Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.

Permits on record

37 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
PP-2025-0138202025-11-06Plumbing913 FILLMORE STWalls are open Replacing old plumbing line with new plumbing lines for the upstairs bathroom.
MP-2025-0045602025-09-10Mechanical913 FILLMORE STEZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from the
MP-2021-0084792025-08-22Mechanical761 S CLEVELAND STMechanical / Fuel Gas Permit for combo RP-2021-014277
PP-2025-0103982025-08-20Plumbing2209-11 N BROAD STThe installation of 1 water closet, 1 Lavatory and 1 water heater including sanitary piping and domestic water piping INSTALLATION OF 3 NEW FIXTURES IN COMPLIANCE WITH EZ STANDARD
MP-2025-0035592025-07-28Mechanical2209-11 N BROAD STFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS P
MP-2025-0014692025-03-25Mechanical2319-27 FITZWATER STFOR THE INSTALLATION OF APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF
MP-2023-0029002024-02-01Mechanical301 E GODFREY AVEFOR THE INSTALLATION OF A FULE GAS PIPING SYSTEM IN AN EXISTING BUILDING AS PER APPLICATION/PLANS AND IN ACCORDANCE WITH THE 2018 IFGC. SEPARATE PERMITS FOR MECHANICAL WORK. ** ASB
MP-2023-0029012023-11-08Mechanical3360-64 FRANKFORD AVEFOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS P
PP-2023-0080012023-07-11Plumbing3360-64 FRANKFORD AVEUnderground and aboveground sanitary and vent piping. Domestic water pipe and fittings, gas pipe and fittings, plumbing fixtures. 1 grease interceptor, 1 garbage disposal,
PP-2023-0077332023-07-10Plumbing301 E GODFREY AVEunderground/aboveground sanitary drains and vent, domestic water, and fixture installation
PP-2023-0088932023-07-07Plumbing301 E GODFREY AVEROUGH IN
MP-2023-0025312023-07-07Mechanical301 E GODFREY AVEFOR A NEW MECHANICAL SYSTEM INSTALLATION TO ACCOMODATE AN EXISTING STRUCTURE. WORK TO INCLUDE THE INSTALLATION OF THREE (3) MINI SPLITS SYSTEMS, ALONG ASSOCIATED DUCTWORK. APPLIAN
PP-2021-0226342021-12-01Plumbing662 E LIPPINCOTT STRough in and finishing for the following fixtures: 1st Floor: 1 toilet, 1 shower, 1 lavatory, 1 kitchen sink and washer box 2nd Floor: 2 toilets, 2 showers and 2 lavatories
PP-2021-0226282021-11-30Plumbing3023 B STRough in and finish for the following fixtures 1st fl- toilet, lavatory, shower, washer box, kitchen sink 2nd fl- 2 toilets, 2 lavatories, 2 showers
PP-2021-0226322021-11-30Plumbing3067 POTTER STRough in and finishes for the following fixtures: 1st floor: 1 toilet, 1 shower, 1 lavatory, 1 kitchen sink and 1 laundry box 2nd floor: 2 toilets, 2 showers and 2 lavatories
PP-2021-0198022021-11-11Plumbing3134 WEYMOUTH STRough in and finish for the following fixtures: 1st floor: 1 lavatory, 1 toilet, 1 shower, 1 kitchen sink and washer box 2nd floor: 2 lavatories, 2 toilets and 2 showers.
PP-2021-0196752021-11-11Plumbing629 E CLEMENTINE STRough in and finish for the following fixtures: 1st floor: 1 bathtub, 1 toilet, 1 lavatory, 1 kitchen sink and 1 washer box 2nd floor: 2 bathtubs, 2 toilets and 2 lavatories
PP-2021-0214152021-11-11Plumbing2417 N MYRTLEWOOD STRough in and finish for the following fixtures 1st fl- toilet, lavatory, shower, washer box, kitchen sink 2nd fl- 2 toilets, 2 lavatories, 2 showers
PP-2021-0196962021-11-11Plumbing3113 HARTVILLE STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 shower, 1 lavatory, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 showers and 2 lavatories
PP-2021-0196932021-11-11Plumbing2935 N 25TH STRough in and finish for the following fixtures: 1st floor: 1 bathtub, 1 toilet, 1 lavatory and washer box 2nd floor: 1 kitchen sink, 2 bathtubs, 2 toilets, 2 lavatories
PP-2021-0195542021-11-11Plumbing2008 E BIRCH STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 shower, 1 lavatory, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 showers and 2 lavatories
PP-2021-0195562021-11-11Plumbing3124 EMERALD STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 bathtub, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 lavatories, 1 bathtub and 1 shower
PP-2021-0196152021-11-11Plumbing2464 N OPAL STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 shower, 1 lavatory, 1 kitchen sink and washer box 2nd floor: 2 toilet, 2 shower and 2 lavatories
PP-2021-0194412021-11-11Plumbing756 E MADISON STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 shower, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 lavatories and 2 showers
PP-2021-0197932021-11-11Plumbing3228 E STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 bathtub, 1 lavatory, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 bathtubs and 2 lavatories
PP-2021-0214162021-11-11Plumbing3118 N 8TH STRough in and finish of the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 shower, kitchen sink and 1 washer box 2nd floor: 2 toilets, 2 lavatories 2 showers and 2 washer bo
PP-2021-0196762021-11-11Plumbing716 E CLEARFIELD STRough in and finish for the following fixtures: 1st floor: 2 toilets, 2 lavatories, 2 showers and, 1 kitchen sink 2ns floor: 1 toilet, 1 lavatory, 1 bathtub and washer box
PP-2021-0196592021-11-11Plumbing720 E HILTON STRough in and finish of the following fixtures: 1st floor: 1 toilet, 1 shower, 1 lavatory, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 showers and 2 lavatories
PP-2021-0194422021-11-11Plumbing3133 JASPER STRough in and finish for the following fixtures 1st fl- toilet, lavatory, shower, washer box, kitchen sink 2nd fl- 2 toilets, 2 lavatories, 2 showers
PP-2021-0196952021-11-11Plumbing3131 CUSTER STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 shower, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 lavatories and 2 showers
PP-2021-0195372021-11-11Plumbing1215 W HAROLD STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 shower, washer box and 1 kitchen sink 2nd floor: 1 toilet, 1 lavatory and 1 shower
PP-2021-0196942021-11-11Plumbing2740 N RINGGOLD STRough in and finish for the following items: 1st floor: 1 toilet, 1 shower, 1 lavatory, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 showers and 2 lavatories
PP-2021-0195382021-11-11Plumbing713 E MADISON STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 kitchen sink, washer box, 1 shower 2nd floor: 2 toilets, 2 lavatories, 2 showers
PP-2021-0197802021-11-11Plumbing2441 W OAKDALE STRough in and finish for the following fixtures: 1st floor: 1 lavatory, 1 bathtub, 1 toilet, 1 kitchen sink and washer box 2nd floor: 2 lavatories, 2 toilets and 2 bathtubs
PP-2021-0214202021-11-11Plumbing2447 N 29TH STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 shower, 1 kitchen sink and 1 washer box 2nd floor: 2 toilets, 2 lavatories, 2 showers and 2 washe
PP-2021-0195552021-11-11Plumbing816 E HILTON STRough in and finish for the following fixtures: 1st floor: 1 toilet, 1 lavatory, 1 shower, 1 kitchen sink and washer box 2nd floor: 2 toilets, 2 lavatories and 2 showers
PP-2021-0187732021-10-22Plumbing624 E LIPPINCOTT STRough in and finish for the following fixtures 1st fl- toilet, lavatory, shower, washer box, kitchen sink 2nd fl- 2 toilets, 2 lavatories, 2 showers

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Other plumbing contractors in Philadelphia

CompanyPermits on record
Stephen Treacy39
Iran Rosado38
Lgb Mechanical Inc38
Centrum LLC37
Plumbing Works37
Superior Drain Cleaning And Jetting Services LLC.37
Jamal E Patterson36
Brett T Sabol35

Companies whose main permit category in Philadelphia is also plumbing, closest to Agh Mechanical Inc in filing volume. Listed for comparison, not as a recommendation.

Search these records

The 37 permits above are a static record through 2025. Select a year above to open that year’s records, or search Agh Mechanical Inc in Philadelphia, PA by address, trade or date range.

Source and limits

Public Philadelphia permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →

Is this your company? Show this public permit record on your website with a free badge.