COMPANY RECORD · NEW YORK, NY

Yongxin Int Contractor I — permit history in New York, NY

Yongxin Int Contractor I appears on 59 New York permit records from 2019 through 2026, most often general construction (57% of the record).

Permit categories

CategoryPermitsShare
General construction4957%
Mechanical / HVAC3743%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20192
20202
202114
202214
202310
202415
202514
202615

Busiest year on record: 2024, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
S & L Plumbing Inc32026-01-22
Catman Plumbing Inc22024-05-06
Xh&Rc Plbg And Htg Inc22025-11-25
Capitol Fire Sprinkler Co12025-06-20
Case Plumbing LLC12023-11-29
Manengeering Bureau Inc12026-02-17

6 companies are named alongside Yongxin Int Contractor I on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
261 BEACH 116 STREET2026-08-06
5613 FORT HAMILTON PARKWAY2026-04-24
83 CHRYSTIE STREET2026-04-23
111 MULBERRY STREET2026-03-13
166 JEROME AVENUE2026-02-11
82-25 QUEENS BOULEVARD2026-01-27
2117 86 STREET2026-01-12
1527 WEST 6 STREET2026-01-09
17 SABRINA LANE2026-01-07
11 EAST BROADWAY2025-11-18
51-05 BELL BOULEVARD2025-11-17
816 58 STREET2025-07-10
7 BOERUM PLACE2025-07-08
5 DOYERS STREET2025-07-01

51 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,500 to $304,750, median $107,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

59 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
Q01438299-I1-GC-CX2026-08-06General construction261 BEACH 116 STREETINTERIOR RENOVATION FOR EXISTING RESTAURANT AT 1ST. FLOOR. MECHANICAL AND PLUMBING WORK AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$113,460
Q01438299-I1-GC-CX2026-08-06Mechanical / HVAC261 BEACH 116 STREETINTERIOR RENOVATION FOR EXISTING RESTAURANT AT 1ST. FLOOR. MECHANICAL AND PLUMBING WORK AS INDICATED ON DRAWINGS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$113,460
B01379574-I1-GC-CX2026-04-24Mechanical / HVAC5613 FORT HAMILTON PARKWAYRENOVATION OF EXISTING OFFICE SPACE. REMOVE EXISTING PARTITIONS AND PLUMBING FIXTURES. INSTALL NEW PARTITIONS, WALL/FLOOR FINISHES AND CEILING TITLES. INSTALL NEW TOILET EXHAUST FA$129,325
B01379574-I1-GC-CX2026-04-24General construction5613 FORT HAMILTON PARKWAYRENOVATION OF EXISTING OFFICE SPACE. REMOVE EXISTING PARTITIONS AND PLUMBING FIXTURES. INSTALL NEW PARTITIONS, WALL/FLOOR FINISHES AND CEILING TITLES. INSTALL NEW TOILET EXHAUST FA$129,325
M01261735-S3-MS2026-04-23Mechanical / HVAC83 CHRYSTIE STREETINSTALLATION OF NEW GAS FURNACES WITH EXISTING OR NEW DUCT WORK ON FIRST FLOOR EATING AND DRINKING ESTABLISHMENT. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$50,000
M00709054-S2-MS2026-03-13Mechanical / HVAC111 MULBERRY STREETInstall a new commercial kitchen hood on first floor kitchen, connect the hood to the existing exhaust duct filed under building job#121189374, and install a new kitchen exhaust fa$65,000
S01352505-I1-GC-CX2026-02-11Mechanical / HVAC166 JEROME AVENUERenovation of an existing 2-family house. Installation of wall partitions, toilet room fixtures & kitchenette appliances. Installation of new water heater & boilers in the cellar.$139,175
S01352505-I1-GC-CX2026-02-11General construction166 JEROME AVENUERenovation of an existing 2-family house. Installation of wall partitions, toilet room fixtures & kitchenette appliances. Installation of new water heater & boilers in the cellar.$139,175
Q01342874-I1-GC-CX2026-01-27General construction82-25 QUEENS BOULEVARDINTERIOR ALTERATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES & LIGHTING FIXTURES. INSTALL MINI SPLIT UNITS. REPLAC$131,230
Q01342874-I1-GC-CX2026-01-27Mechanical / HVAC82-25 QUEENS BOULEVARDINTERIOR ALTERATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES & LIGHTING FIXTURES. INSTALL MINI SPLIT UNITS. REPLAC$131,230
B01341701-I1-GC-CX2026-01-12Mechanical / HVAC2117 86 STREETRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR. NO CHANGE IN USE, EGRESS & OCCUPANCY.$132,450
B01341701-I1-GC-CX2026-01-12General construction2117 86 STREETRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR. NO CHANGE IN USE, EGRESS & OCCUPANCY.$132,450
B01340146-I1-GC-CX2026-01-09Mechanical / HVAC1527 WEST 6 STREETRenovation of an existing 3-family house. Installation of wall partitions, toilet room fixtures & kitchenette appliances. Installation of new water heater & boilers in the basement$254,250
B01340146-I1-GC-CX2026-01-09General construction1527 WEST 6 STREETRenovation of an existing 3-family house. Installation of wall partitions, toilet room fixtures & kitchenette appliances. Installation of new water heater & boilers in the basement$254,250
S01341832-I1-GC2026-01-07General construction17 SABRINA LANEMINOR INTERIOR RENOVATION ON EXISTING 1-FAMILY HOUSE ON THE FIRST AMD SECOND FLOOR. NO CHANGE IN USE, OCCUPANY OR EGRESS UNDER THIS APPLICATION. MINOR PARTITIONS, WALL/FLOOR FINISH$87,900
M01315588-I1-GC2025-11-18General construction11 EAST BROADWAYRENOVATION OF THE EXISTING OFFICE. INSTALLATION OF ALUMINUM FRAMING AND TEMPERED GLASS WALL. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$13,240
Q01311841-I1-GC2025-11-17General construction51-05 BELL BOULEVARDINTERIOR RENOVATION OF EXISTING 1-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$37,500
M01261735-I1-GC2025-09-08General construction83 CHRYSTIE STREETINTERIOR RENOVATION WITH PARTITION WORKS, REPLACE EXISTING STOREFRONT AND GLASS ENTRANCE DOORS FOR FIRST FLOOR EXISTING EATING AND DRINKING ESTABLISHMENT. NO CHANGE OF USE, EGRESS $189,830
B01240065-I1-GC-CX2025-07-10General construction816 58 STREETINTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.$304,750
B01240065-I1-GC-CX2025-07-10Mechanical / HVAC816 58 STREETINTERIOR FIT UP OF EXISTING RESTAURANT SPACE ON PARTIAL CELLAR AND FIRST FLOOR. NO CHANGE TO EXISTING USE, EGRESS AND OCCUPANCY.$304,750
B01238135-I1-GC-CX2025-07-08Mechanical / HVAC7 BOERUM PLACEFILING HEREWITH INTERIOR FIT OUT OF COMMERCIAL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$159,200
B01238135-I1-GC-CX2025-07-08General construction7 BOERUM PLACEFILING HEREWITH INTERIOR FIT OUT OF COMMERCIAL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$159,200
M01243449-I1-GC-CX2025-07-01Mechanical / HVAC5 DOYERS STREETINTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT TO THE CELLAR FLOOR ONLY. MINOR PARTITIONS, INSTALL NEW TOILET ROOMS, RELOCATE BAR COUNTER AND FIXTURES. NO CHNAG$74,650
M01243449-I1-GC-CX2025-07-01General construction5 DOYERS STREETINTERIOR RENOVATION OF EXISTING EATING AND DRINKING ESTABLISHMENT TO THE CELLAR FLOOR ONLY. MINOR PARTITIONS, INSTALL NEW TOILET ROOMS, RELOCATE BAR COUNTER AND FIXTURES. NO CHNAG$74,650
M01235402-I1-GC2025-06-20General construction654 9 AVENUEInterior minor renovation of existing commercial space. No change in use, egress or occupancy.$38,000
Q01149758-S1-MS2025-03-25Mechanical / HVAC133-40 79 STREETTHIS APPLICATION IS FOR MECHANICAL WORK ONLY. THE GENERAL CONSTRUCTION WORK IS FILED UNDER DOB NOW JOB# Q01149758-I1. INSTALLATION OF (2) HVAC SPLIT SYSTEMS. INSTALLATION OF (2) KI$184,500
B01126181-I1-GC-CX2025-02-21General construction2175 RALPH AVENUEINTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. R$148,900
B01126181-I1-GC-CX2025-02-21Mechanical / HVAC2175 RALPH AVENUEINTERIOR RENOVATION OF TAKE-OUT ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, KITCHEN EXHAUST SYSTEM, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. R$148,900
Q01149758-I1-GC2025-01-08General construction133-40 79 STREETALTERATION TO EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. NO CHANGE IN USE, EGRESS AND OCCUPANCY. INSTALL NEW PARTITIONS, FLOOR WALL FINISHES AND CEILING TILES. INSTALL LIGH$203,600
B01072659-I1-GC2024-11-29General construction11 BAY 20 STREETPROPOSED FENCE WORK ON ROOF LEVEL ONLY, CONVERT PART OF THE ROOF TO ACCESSORY PLAY AREA FOR CHILD DAY CARE - OCCUPANCY (E). PROPOSED NEW LIGHTING ON ROOF. NO CHANGE IN BUILDING ENV$5,000
B00893426-S4-MS2024-08-22Mechanical / HVAC468 WAVERLY AVENUEINSTALLATION OF NEW SPLIT HEAT PUMP SYSTEMS WITH ASSOCIATED DUCTWORK & PIPING AS INDICATED ON THE DRAWINGS FILED HEREIN.$20,000
M01074992-I1-GC-CX2024-08-22General construction275 BLEECKER STREETRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AND CEILING TITLES. INSTALL NEW HVAC UNIT. INSTALL NEW PREP SINKS. NO C$54,750
M01074992-I1-GC-CX2024-08-22Mechanical / HVAC275 BLEECKER STREETRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AND CEILING TITLES. INSTALL NEW HVAC UNIT. INSTALL NEW PREP SINKS. NO C$54,750
Q01094127-I1-GC-CX2024-08-16Mechanical / HVAC156-16 NORTHERN BOULEVARDINTERIOR RENOVATION OF EXISTING RESTAURANT ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITION, FLOOR & WALL FINISHES. INSTALL NEW COOKING APPLIANCES UNDER EXISTING KITCHEN HOOD. REPLAC$50,750
Q01094127-I1-GC-CX2024-08-16General construction156-16 NORTHERN BOULEVARDINTERIOR RENOVATION OF EXISTING RESTAURANT ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITION, FLOOR & WALL FINISHES. INSTALL NEW COOKING APPLIANCES UNDER EXISTING KITCHEN HOOD. REPLAC$50,750
B01064102-I1-GC-CX2024-07-08Mechanical / HVAC328 ATLANTIC AVENUERENOVATION OF EXISTING COMMERCIAL SPACE TO A NAIL SALON. INSTALLATION OF NEW PARTITIONS, COUNTER, FLOOR/WALL FINISHES AND CEILING TITLES. INSTALL NEW EXHAUST FAN. EXISTING PARTITIO$112,850
B01064102-I1-GC-CX2024-07-08General construction328 ATLANTIC AVENUERENOVATION OF EXISTING COMMERCIAL SPACE TO A NAIL SALON. INSTALLATION OF NEW PARTITIONS, COUNTER, FLOOR/WALL FINISHES AND CEILING TITLES. INSTALL NEW EXHAUST FAN. EXISTING PARTITIO$112,850
M01042546-I1-GC-CX2024-06-06Mechanical / HVAC240 GRAND STREETRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITIONS, FLOOR/WALL, CEILING FINISHES. INSTALL NEW HVAC UNIT, NEW PREP SINKS, AND PLUMBING FIXTURES$100,980
M01042546-I1-GC-CX2024-06-06General construction240 GRAND STREETRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR ONLY. INSTALL NEW PARTITIONS, FLOOR/WALL, CEILING FINISHES. INSTALL NEW HVAC UNIT, NEW PREP SINKS, AND PLUMBING FIXTURES$100,980
M01026057-I1-GC-CX2024-05-31General construction210 EAST BROADWAYRENOVATION OF EXISTING APT # H1308 AS PER PLANS, MINNOR PARTITIONS, FLOOR AND WALL FINISHES, BALCANY ENCLOSURE AND CLOSET WORKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,800
M01026057-I1-GC-CX2024-05-31Mechanical / HVAC210 EAST BROADWAYRENOVATION OF EXISTING APT # H1308 AS PER PLANS, MINNOR PARTITIONS, FLOOR AND WALL FINISHES, BALCANY ENCLOSURE AND CLOSET WORKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,800
M00984323-I1-GC-CX2024-01-25Mechanical / HVAC2783 BROADWAYRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. INSTALL NEW HVAC $124,500
M00984323-I1-GC-CX2024-01-25General construction2783 BROADWAYRENOVATION OF EXISTING COMMERCIAL SPACE ON THE FIRST FLOOR. INSTALLATION OF NEW KITCHEN EQUIPMENT, PLUMBING FIXTURES, NEW PARTITIONS, FLOOR/WALL/CEILING FINISHES. INSTALL NEW HVAC $124,500
M00979315-I1-GC2024-01-22General construction170 JOHN STREETREMOVAL OF EXISTING AND INSTALLATION OF NEW NON LOAD BEARING PARTITIONS AND FINISHES AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$35,000
M00964764-I1-GC-CX2023-11-27Mechanical / HVAC191 CENTRE STREETADDITIONAL DINING AREA TO EXISTING RESTAURANT. INSTALL NEW PARTITIONS, FLOOR/WALL AND CEILING FINISHES. NO CHANGE IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.$60,320
M00964764-I1-GC-CX2023-11-27General construction191 CENTRE STREETADDITIONAL DINING AREA TO EXISTING RESTAURANT. INSTALL NEW PARTITIONS, FLOOR/WALL AND CEILING FINISHES. NO CHANGE IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.$60,320
B00909704-I1-GC2023-10-03General construction11 BAY 20 STREETPROPOSED INTERIOR RENOVATION AT PARTIAL 2ND, 3RD FLOOR AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$66,888
B00893426-I1-GC2023-08-24General construction468 WAVERLY AVENUEINTERIOR RENOVATION OF EXISTING TWO-FAMILY HOUSE AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE TO THE USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.$226,800
B00906628-I1-GC2023-08-01General construction1948 86 STREETMinor interior renovation of existing restaurant on the first floor. No change in use, egress or occupancy.$13,410
M00897524-I1-GC2023-07-05General construction11 EAST BROADWAYMINOR CONSTRUCTION OF EXISTING OFFICE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$68,700

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →