COMPANY RECORD · NEW YORK, NY
Whalen Construction, Inc — permit history in New York, NY
Whalen Construction, Inc appears on 124 New York permit records from 2019 through 2026, most often mechanical / hvac (54.3% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 016525 | 129 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | WHALEN CONSTRUCTION, INC |
|---|---|
| Business address on file | 124 6TH AVENUE PELHAM, NY 10803 |
| Business phone on file | (917) 846-2862 |
| Licence number | 16525 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | EXPIRED |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Whalen Construction, Inc by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 70 | 54.3% |
| General construction | 59 | 45.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 8 |
| 2021 | 16 |
| 2022 | 39 |
| 2023 | 17 |
| 2024 | 22 |
| 2025 | 18 |
| 2026 | 8 |
Busiest year on record: 2022, with 39 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every New York permit, not only this company's
This page is a snapshot of Whalen Construction, Inc. The search behind it holds more than 352,308 New York permits naming a contractor, since 2019: 151,351 building permits, 117,270 plumbing permits, 72,431 mechanical (HVAC) permits, 43,000 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Whalen Construction, Inc files, or any new mechanical (HVAC) permit in New York. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Hydronic Concepts Ny P&H | 5 | 2026-01-22 |
| Hydronic Concepts Ny Plbg | 2 | 2025-12-19 |
| Five Borough Nyc LLC | 1 | 2024-04-09 |
| Reliable Plbg & Htg Corp | 1 | 2024-04-09 |
| Sound Refrigeration & Air | 1 | 2025-07-09 |
5 companies are named alongside Whalen Construction, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 200 LAFAYETTE STREET | 2026-06-16 |
| 360 LEXINGTON AVENUE | 2026-06-12 |
| 540 MADISON AVENUE | 2026-02-18 |
| 236 WEST 18 STREET | 2026-02-06 |
| 95 HORATIO STREET | 2026-02-05 |
| 1440 BROADWAY | 2026-01-30 |
| 320 PARK AVENUE | 2026-01-21 |
| 1350 BROADWAY | 2025-11-13 |
| 71 WEST 47 STREET | 2025-07-14 |
| 50 BROADWAY | 2025-07-11 |
| 441 9 AVENUE | 2025-04-28 |
| 30-40 48 AVENUE | 2025-03-31 |
| 4 EAST 98 STREET | 2025-03-11 |
| 459 5 AVENUE | 2024-10-29 |
39 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $500 to $829,996, median $95,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Hydronic Concepts Ny P&H | 11 | 2019–2026 |
| Par Plumbing Co., Inc | 7 | 2019–2026 |
| Ashlar Mechanical Corp | 6 | 2020–2024 |
| Hydronic Concepts Ny Plbg | 4 | 2020–2026 |
| Par Fire Protection LLC | 3 | 2019–2025 |
| Structure Tone, LLC | 3 | 2021–2026 |
| Abco-Peerless Sprklr Corp | 3 | 2020–2026 |
| Demar Plumbing Corp | 3 | 2022–2026 |
Companies that also appear in New York permit records at addresses where Whalen Construction, Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
124 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01410205-I1-MS | 2026-06-16 | Mechanical / HVAC | 200 LAFAYETTE STREET | Remove existing and Install new AC units and associated components, as per plans filed herewith. No change to use. egress or occupancy. | $22,000 |
| M01411252-I1-MS | 2026-06-12 | Mechanical / HVAC | 360 LEXINGTON AVENUE | INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS FILED HEREIN | $25,000 |
| M01338598-I1-GC | 2026-02-18 | General construction | 540 MADISON AVENUE | Architectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy. | $10,000 |
| M01346995-I1-GC | 2026-02-06 | General construction | 236 WEST 18 STREET | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $70,000 |
| M01238795-I1-GC | 2026-02-05 | General construction | 95 HORATIO STREET | RENOVATION/ RECONFIGURATION OF TWO (2) EXISTING TRIPLEX APARTMENTS. SCOPE TO INCLUDE GENERAL CONSTRUCTION, STRUCTURAL, MECHANICAL AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS | $639,000 |
| M01339142-I1-GC | 2026-01-30 | General construction | 1440 BROADWAY | Interior modification. Modifying the existing entrance door to install a push-button-actuated assembly for accessibility to the building. | $37,640 |
| M01329045-I1-GC | 2026-01-21 | General construction | 320 PARK AVENUE | PROPOSE A VERY MINOR PARTITION CHANGE AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY | $15,000 |
| M01238795-S2-MS | 2026-01-20 | Mechanical / HVAC | 95 HORATIO STREET | MECHANICAL WORK ASSOCIATED WITH APARTMENT RENOVATION. | $110,625 |
| M01327906-I1-GC | 2025-12-29 | General construction | 200 LAFAYETTE STREET | Construction modifications taking place within the roof bulkhead as indicated on the drawings. | $10,000 |
| M01327906-S1-MS | 2025-12-29 | Mechanical / HVAC | 200 LAFAYETTE STREET | Mechanical modifications taking place within the existing roof bulkhead as indicated on the drawings. | $17,000 |
| M01302531-I1-GC | 2025-11-13 | General construction | 1350 BROADWAY | GENERAL CONSTRUCTION TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $130,000 |
| M01302601-I1-MS | 2025-11-12 | Mechanical / HVAC | 1350 BROADWAY | MECHANICAL WORK TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $12,000 |
| M01295741-I1-GC | 2025-10-31 | General construction | 360 LEXINGTON AVENUE | Interior alteration of office space on 5th floor & 6th floor for banking and financial services. | $324,980 |
| M01295741-S1-MS | 2025-10-27 | Mechanical / HVAC | 360 LEXINGTON AVENUE | Modification of the ductwork and HVAC system due to change of architectural layout (5th and 6th floor). Addition of air conditioning unit serving Board room (5th floor). | $51,200 |
| M01211412-I1-GC | 2025-10-15 | General construction | 540 MADISON AVENUE | Architectural modifications taking place on 13C/14M floor as per plans filed herewith. No change in use, egress or occupancy. | $60,000 |
| M01211414-I1-MS | 2025-10-15 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on 13C/14M floor as per plans filed herewith. No change in use, egress or occupancy. | $160,000 |
| M01291093-I1-MS | 2025-10-02 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on 34th floor Marketing/33rd floor Construction as per plans filed herewith. No change in use, egress or occupancy. | $25,000 |
| M01291075-I1-GC | 2025-10-01 | General construction | 540 MADISON AVENUE | Architectural modifications taking place on 34th floor Marketing/33rd floor Construction as per plans filed herewith. No change in use, egress or occupancy. | $55,020 |
| M01188926-I1-GC | 2025-07-14 | General construction | 71 WEST 47 STREET | REPLACE ONE (1) AC SYSTEM WITH ONE (1) NEW HEAT-PUMP HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $250,000 |
| M01188926-I1-GC | 2025-07-14 | Mechanical / HVAC | 71 WEST 47 STREET | REPLACE ONE (1) AC SYSTEM WITH ONE (1) NEW HEAT-PUMP HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $250,000 |
| M01237641-I1-GC | 2025-07-11 | General construction | 50 BROADWAY | Construction work on the 34th floor (UFT fitout) as indicated on drawings. | $417,690 |
| M01237668-I1-MS | 2025-07-11 | Mechanical / HVAC | 50 BROADWAY | Mechanical work on the 34th floor (UFT fitout) as indicated on drawings | $47,775 |
| M01164577-I1-MS | 2025-04-28 | Mechanical / HVAC | 441 9 AVENUE | Removal and installation of ductwork, diffusers, fans and related mechanical piping. No Change to Use, Egress or Occupancy. | $103,500 |
| Q01187713-I1-MS | 2025-03-31 | Mechanical / HVAC | 30-40 48 AVENUE | Mechanical work related to ac replacement. No change to use, egress, or occupancy. | $125,000 |
| M01164564-I1-GC | 2025-03-24 | General construction | 441 9 AVENUE | GENERAL CONSTRUCTION FOR INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $142,584 |
| M01186492-I1-MS | 2025-03-11 | Mechanical / HVAC | 4 EAST 98 STREET | INSTALLATION OF SPLIT HVAC SYSTEM WITH A TOTAL CAPACITY OF 15 TONS ON FLOORS 006 AND ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $52,500 |
| M01116938-I1-MS | 2024-11-07 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on 35th floor Construction/36th floor Marketing as per plans filed herewith. No change in use, egress or occupancy. | $140,000 |
| M01116929-I1-GC | 2024-11-07 | General construction | 540 MADISON AVENUE | Architectural modifications taking place on 35th floor Construction/36th floor Marketing as per plans filed herewith. No change in use, egress or occupancy. | $95,000 |
| B01099928-I1-GC | 2024-10-29 | General construction | 459 5 AVENUE | REMOVING FURNITURE PARTITIONS AND REPLACING THEM WITH FULL HEIGHT PARTITIONS AND GLASS WALL | $125,580 |
| B01099928-S1-MS | 2024-10-29 | Mechanical / HVAC | 459 5 AVENUE | Modification of ductwork and HVAC system due new office layout as shown on the drawings filed herewith. | $14,300 |
| M01096216-I1-MS | 2024-08-30 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on the 27th floor Construction/28th floor Marketing as per plans filed herewith. No change in use, egress or occupancy. | $105,000 |
| M01096199-I1-GC | 2024-08-30 | General construction | 540 MADISON AVENUE | Construction modifications taking place on 27th floor Construction/28th floor Marketing as per plans filed herewith. No change in use, egress or occupancy. | $73,000 |
| M01058920-I1-MS | 2024-07-15 | Mechanical / HVAC | 345 PARK AVENUE | FILING FOR REPLACEMENT OF EXISTING HVAC UNIT AS PER PLANS SUBMITTED HEREWITH. | $70,000 |
| M01056504-I1-GC | 2024-06-18 | General construction | 320 PARK AVENUE | General construction modifications taking place on the 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupan | $492,607 |
| M01056506-I1-MS | 2024-06-17 | Mechanical / HVAC | 320 PARK AVENUE | Mechanical modifications taking place on 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupancy | $58,261 |
| M00930000-I1-MS | 2024-06-17 | Mechanical / HVAC | 100 WALL STREET | Modifications to the existing HVAC system: Removal of AC units, branch ductwork, dampers, controls, VAVs, return and supply grilles on the 23rd Flrs (CO)/ 24th Flrs (Mktg) as per p | $64,800 |
| M01064859-I1-MS | 2024-06-13 | Mechanical / HVAC | 4 EAST 98 STREET | REPLACEMENT OF SPLIT SYSTEM ON FLOOR 006 AND ROOF WITH A TOTAL CAPACITY OF 23000 BTUs. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $6,750 |
| M00929382-I1-GC | 2024-06-05 | General construction | 100 WALL STREET | Minor interior demolition: Removal of interior partitions, doors suspended ceilings, flooring and finishes on the 23rd Flrs (CO)/ 24th Flrs (Mktg) as per plans (Suite 2400 - Rosenb | $178,170 |
| M01034901-I1-MS | 2024-05-06 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on the 25th floor as per plans filed herewith. No change in use, egress or occupancy. | $186,300 |
| M01014045-S1-MS | 2024-04-08 | Mechanical / HVAC | 2 PARK AVENUE | HVAC MODIFICATIONS FOR 14TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. | $40,000 |
| M01014045-I1-GC | 2024-04-05 | General construction | 2 PARK AVENUE | INTERIOR RENOVATION OF 14TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH, | $800,000 |
| M01015808-I1-GC | 2024-04-01 | General construction | 540 MADISON AVENUE | General construction modifications taking place on the 25th floor as per plans filed herewith. No change in use, egress or occupancy. | $130,100 |
| M00934622-I1-GC | 2024-03-15 | General construction | 298 MULBERRY STREET | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH FOR CHANGE OF USE AND POPULATION INCREASE. | $829,996 |
| M00996112-I1-MS | 2024-02-27 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy. | $125,500 |
| M00981217-I1-MS | 2024-01-19 | Mechanical / HVAC | 420 5 AVENUE | Demolish and replace existing cooling towers and provide new ping to new cooling towers as shown on plans. No change to use, egress or occupancy. | $350,000 |
| M00980852-I1-GC | 2024-01-11 | General construction | 298 MULBERRY STREET | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $38,501 |
| M00973579-I1-MS | 2024-01-10 | Mechanical / HVAC | 298 MULBERRY STREET | MECHANICAL MODIFICATIONS TAKING PLACE ON CEL, 1ST, AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $216,020 |
| M00943531-I1-GC | 2024-01-09 | General construction | 540 MADISON AVENUE | General construction modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy. | $87,800 |
| M00950987-I1-GC | 2023-12-22 | General construction | 32 OLD SLIP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $103,265 |
| M00953558-I1-GC | 2023-12-19 | General construction | 350 FIFTH AVENUE | GENERAL CONSTRUCTION TAKING PLACE ON CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $175,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
