COMPANY RECORD · NEW YORK, NY

Whalen Construction, Inc — permit history in New York, NY

Whalen Construction, Inc appears on 124 New York permit records from 2019 through 2026, most often mechanical / hvac (54.3% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC7054.3%
General construction5945.7%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20191
20208
202116
202239
202317
202422
202518
20268

Busiest year on record: 2022, with 39 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Hydronic Concepts Ny P&H52026-01-22
Hydronic Concepts Ny Plbg22025-12-19
Five Borough Nyc LLC12024-04-09
Reliable Plbg & Htg Corp12024-04-09
Sound Refrigeration & Air12025-07-09

5 companies are named alongside Whalen Construction, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
200 LAFAYETTE STREET2026-06-16
360 LEXINGTON AVENUE2026-06-12
540 MADISON AVENUE2026-02-18
236 WEST 18 STREET2026-02-06
95 HORATIO STREET2026-02-05
1440 BROADWAY2026-01-30
320 PARK AVENUE2026-01-21
1350 BROADWAY2025-11-13
71 WEST 47 STREET2025-07-14
50 BROADWAY2025-07-11
441 9 AVENUE2025-04-28
30-40 48 AVENUE2025-03-31
4 EAST 98 STREET2025-03-11
459 5 AVENUE2024-10-29

39 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $500 to $829,996, median $95,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

124 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01410205-I1-MS2026-06-16Mechanical / HVAC200 LAFAYETTE STREETRemove existing and Install new AC units and associated components, as per plans filed herewith. No change to use. egress or occupancy.$22,000
M01411252-I1-MS2026-06-12Mechanical / HVAC360 LEXINGTON AVENUEINSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS FILED HEREIN$25,000
M01338598-I1-GC2026-02-18General construction540 MADISON AVENUEArchitectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy.$10,000
M01346995-I1-GC2026-02-06General construction236 WEST 18 STREETGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$70,000
M01238795-I1-GC2026-02-05General construction95 HORATIO STREETRENOVATION/ RECONFIGURATION OF TWO (2) EXISTING TRIPLEX APARTMENTS. SCOPE TO INCLUDE GENERAL CONSTRUCTION, STRUCTURAL, MECHANICAL AND PLUMBING WORK TYPES. NO CHANGE TO USE, EGRESS $639,000
M01339142-I1-GC2026-01-30General construction1440 BROADWAYInterior modification. Modifying the existing entrance door to install a push-button-actuated assembly for accessibility to the building.$37,640
M01329045-I1-GC2026-01-21General construction320 PARK AVENUEPROPOSE A VERY MINOR PARTITION CHANGE AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY$15,000
M01238795-S2-MS2026-01-20Mechanical / HVAC95 HORATIO STREETMECHANICAL WORK ASSOCIATED WITH APARTMENT RENOVATION.$110,625
M01327906-I1-GC2025-12-29General construction200 LAFAYETTE STREETConstruction modifications taking place within the roof bulkhead as indicated on the drawings.$10,000
M01327906-S1-MS2025-12-29Mechanical / HVAC200 LAFAYETTE STREETMechanical modifications taking place within the existing roof bulkhead as indicated on the drawings.$17,000
M01302531-I1-GC2025-11-13General construction1350 BROADWAYGENERAL CONSTRUCTION TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$130,000
M01302601-I1-MS2025-11-12Mechanical / HVAC1350 BROADWAYMECHANICAL WORK TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$12,000
M01295741-I1-GC2025-10-31General construction360 LEXINGTON AVENUEInterior alteration of office space on 5th floor & 6th floor for banking and financial services.$324,980
M01295741-S1-MS2025-10-27Mechanical / HVAC360 LEXINGTON AVENUEModification of the ductwork and HVAC system due to change of architectural layout (5th and 6th floor). Addition of air conditioning unit serving Board room (5th floor).$51,200
M01211414-I1-MS2025-10-15Mechanical / HVAC540 MADISON AVENUEMechanical modifications taking place on 13C/14M floor as per plans filed herewith. No change in use, egress or occupancy.$160,000
M01211412-I1-GC2025-10-15General construction540 MADISON AVENUEArchitectural modifications taking place on 13C/14M floor as per plans filed herewith. No change in use, egress or occupancy.$60,000
M01291093-I1-MS2025-10-02Mechanical / HVAC540 MADISON AVENUEMechanical modifications taking place on 34th floor Marketing/33rd floor Construction as per plans filed herewith. No change in use, egress or occupancy.$25,000
M01291075-I1-GC2025-10-01General construction540 MADISON AVENUEArchitectural modifications taking place on 34th floor Marketing/33rd floor Construction as per plans filed herewith. No change in use, egress or occupancy.$55,020
M01188926-I1-GC2025-07-14Mechanical / HVAC71 WEST 47 STREETREPLACE ONE (1) AC SYSTEM WITH ONE (1) NEW HEAT-PUMP HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
M01188926-I1-GC2025-07-14General construction71 WEST 47 STREETREPLACE ONE (1) AC SYSTEM WITH ONE (1) NEW HEAT-PUMP HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$250,000
M01237668-I1-MS2025-07-11Mechanical / HVAC50 BROADWAYMechanical work on the 34th floor (UFT fitout) as indicated on drawings$47,775
M01237641-I1-GC2025-07-11General construction50 BROADWAYConstruction work on the 34th floor (UFT fitout) as indicated on drawings.$417,690
M01164577-I1-MS2025-04-28Mechanical / HVAC441 9 AVENUERemoval and installation of ductwork, diffusers, fans and related mechanical piping. No Change to Use, Egress or Occupancy.$103,500
Q01187713-I1-MS2025-03-31Mechanical / HVAC30-40 48 AVENUEMechanical work related to ac replacement. No change to use, egress, or occupancy.$125,000
M01164564-I1-GC2025-03-24General construction441 9 AVENUEGENERAL CONSTRUCTION FOR INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY.$142,584
M01186492-I1-MS2025-03-11Mechanical / HVAC4 EAST 98 STREETINSTALLATION OF SPLIT HVAC SYSTEM WITH A TOTAL CAPACITY OF 15 TONS ON FLOORS 006 AND ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$52,500
M01116929-I1-GC2024-11-07General construction540 MADISON AVENUEArchitectural modifications taking place on 35th floor Construction/36th floor Marketing as per plans filed herewith. No change in use, egress or occupancy.$95,000
M01116938-I1-MS2024-11-07Mechanical / HVAC540 MADISON AVENUEMechanical modifications taking place on 35th floor Construction/36th floor Marketing as per plans filed herewith. No change in use, egress or occupancy.$140,000
B01099928-S1-MS2024-10-29Mechanical / HVAC459 5 AVENUEModification of ductwork and HVAC system due new office layout as shown on the drawings filed herewith.$14,300
B01099928-I1-GC2024-10-29General construction459 5 AVENUEREMOVING FURNITURE PARTITIONS AND REPLACING THEM WITH FULL HEIGHT PARTITIONS AND GLASS WALL$125,580
M01096199-I1-GC2024-08-30General construction540 MADISON AVENUEConstruction modifications taking place on 27th floor Construction/28th floor Marketing as per plans filed herewith. No change in use, egress or occupancy.$73,000
M01096216-I1-MS2024-08-30Mechanical / HVAC540 MADISON AVENUEMechanical modifications taking place on the 27th floor Construction/28th floor Marketing as per plans filed herewith. No change in use, egress or occupancy.$105,000
M01058920-I1-MS2024-07-15Mechanical / HVAC345 PARK AVENUEFILING FOR REPLACEMENT OF EXISTING HVAC UNIT AS PER PLANS SUBMITTED HEREWITH.$70,000
M01056504-I1-GC2024-06-18General construction320 PARK AVENUEGeneral construction modifications taking place on the 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupan$492,607
M01056506-I1-MS2024-06-17Mechanical / HVAC320 PARK AVENUEMechanical modifications taking place on 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change in use, egress or occupancy$58,261
M00930000-I1-MS2024-06-17Mechanical / HVAC100 WALL STREETModifications to the existing HVAC system: Removal of AC units, branch ductwork, dampers, controls, VAVs, return and supply grilles on the 23rd Flrs (CO)/ 24th Flrs (Mktg) as per p$64,800
M01064859-I1-MS2024-06-13Mechanical / HVAC4 EAST 98 STREETREPLACEMENT OF SPLIT SYSTEM ON FLOOR 006 AND ROOF WITH A TOTAL CAPACITY OF 23000 BTUs. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.$6,750
M00929382-I1-GC2024-06-05General construction100 WALL STREETMinor interior demolition: Removal of interior partitions, doors suspended ceilings, flooring and finishes on the 23rd Flrs (CO)/ 24th Flrs (Mktg) as per plans (Suite 2400 - Rosenb$178,170
M01034901-I1-MS2024-05-06Mechanical / HVAC540 MADISON AVENUEMechanical modifications taking place on the 25th floor as per plans filed herewith. No change in use, egress or occupancy.$186,300
M01014045-S1-MS2024-04-08Mechanical / HVAC2 PARK AVENUEHVAC MODIFICATIONS FOR 14TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH.$40,000
M01014045-I1-GC2024-04-05General construction2 PARK AVENUEINTERIOR RENOVATION OF 14TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH,$800,000
M01015808-I1-GC2024-04-01General construction540 MADISON AVENUEGeneral construction modifications taking place on the 25th floor as per plans filed herewith. No change in use, egress or occupancy.$130,100
M00934622-I1-GC2024-03-15General construction298 MULBERRY STREETGENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH FOR CHANGE OF USE AND POPULATION INCREASE.$829,996
M00996112-I1-MS2024-02-27Mechanical / HVAC540 MADISON AVENUEMechanical modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.$125,500
M00981217-I1-MS2024-01-19Mechanical / HVAC420 5 AVENUEDemolish and replace existing cooling towers and provide new ping to new cooling towers as shown on plans. No change to use, egress or occupancy.$350,000
M00980852-I1-GC2024-01-11General construction298 MULBERRY STREETGENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$38,501
M00973579-I1-MS2024-01-10Mechanical / HVAC298 MULBERRY STREETMECHANICAL MODIFICATIONS TAKING PLACE ON CEL, 1ST, AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$216,020
M00943531-I1-GC2024-01-09General construction540 MADISON AVENUEGeneral construction modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy.$87,800
M00950987-I1-GC2023-12-22General construction32 OLD SLIPGENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$103,265
M00953558-I1-GC2023-12-19General construction350 FIFTH AVENUEGENERAL CONSTRUCTION TAKING PLACE ON CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$175,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →