COMPANY RECORD · NEW YORK, NY
Wade Ray & Assoc Const In — permit history in New York, NY
Wade Ray & Assoc Const In appears on 36 New York permit records from 2020 through 2025, most often general construction (53.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 21 | 53.8% |
| Mechanical / HVAC | 18 | 46.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 7 |
| 2021 | 7 |
| 2022 | 8 |
| 2023 | 7 |
| 2024 | 3 |
| 2025 | 7 |
Busiest year on record: 2022, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| M&T Plbg And Htg Co., Inc | 2 | 2023-09-12 |
| Par Fire Protection LLC | 2 | 2025-10-28 |
| Par Plumbing Co., Inc | 2 | 2025-10-27 |
| Sirina Fire Prot Corp | 2 | 2023-09-11 |
| Performance Mechancial | 1 | 2023-09-19 |
| Superior HVAC Inc | 1 | 2025-10-27 |
6 companies are named alongside Wade Ray & Assoc Const In on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 360 EAST 72 STREET | 2025-11-24 |
| 4201 WHITE PLAINS ROAD | 2025-11-13 |
| 299 PARK AVENUE | 2025-11-05 |
| 37-18 BROADWAY | 2025-10-31 |
| 1460 FOREST AVENUE | 2025-03-27 |
| 1495 YORK AVENUE | 2025-02-05 |
| 2530 FLATBUSH AVENUE | 2024-10-15 |
| 633 THIRD AVENUE | 2024-10-09 |
| 596 FORT WASHINGTON AVENUE | 2024-01-25 |
| 119 2 AVENUE | 2023-08-24 |
| 941 LEXINGTON AVENUE | 2023-06-14 |
| 161 DYCKMAN STREET | 2023-03-31 |
| 2824 BROADWAY | 2023-03-10 |
| 6424 18 AVENUE | 2023-01-30 |
32 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $6,100 to $825,000, median $108,598. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
36 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01190122-I1-GC | 2025-11-24 | General construction | 360 EAST 72 STREET | STOREFRONT REPLACEMENT AT EXISTING GROUND FLOOR CHASE BANK INCLUDING WATERPROOFING WORK, WALL AND CEILING FINISH REPLACEMENT THROUGHOUT SPECIFIC AREAS SHOWN ON PLAN.. NO CHANGE IN | $157,350 |
| X01100390-I1-GC | 2025-11-13 | General construction | 4201 WHITE PLAINS ROAD | Capital One Bank ATM bank renovation-work to include exterior improvements as per plans filed herewith. No change in use, egress or occupancy | $85,000 |
| X01100390-S2-GC | 2025-11-13 | General construction | 4201 WHITE PLAINS ROAD | Capital One -Provide ADA access to proposed exterior ATMS landing and ramps, pavement repairs and restriping, concrete work, building lights as per the plans filed herewith. No cha | $100,000 |
| M01279345-I1-MS | 2025-11-05 | Mechanical / HVAC | 299 PARK AVENUE | Mechanical modifications to take place on the 1st floor as per drawings filed herewith. No change in use, egress, or occupancy. | $475,000 |
| Q01261740-I1-GC | 2025-10-31 | General construction | 37-18 BROADWAY | Fit out project for new banking center with traditional banking and financial services. Scope including new partitions, ceiling assembly and finishes as shown on drawings filed her | $311,260 |
| S01168165-I1-GC | 2025-03-27 | General construction | 1460 FOREST AVENUE | Construction of an ADA compliant entrance | $90,000 |
| M01153650-I1-MS | 2025-02-05 | Mechanical / HVAC | 1495 YORK AVENUE | HVAC REPLACEMENT FOR CHASE BANK AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $192,000 |
| B01112222-I1-GC | 2024-10-15 | General construction | 2530 FLATBUSH AVENUE | General Renovation of existing bank. No change to use, egress or occupancy. | $300,510 |
| M01004173-I1-GC | 2024-10-09 | General construction | 633 THIRD AVENUE | Minor renovation to existing bank branch, including accessibility upgrade in the form of an accessibility lift and associated alterations. No change in use, egress or occupancy. | $99,300 |
| M00966247-I1-GC | 2024-01-25 | General construction | 596 FORT WASHINGTON AVENUE | Minor renovation of existing bank branch including new partitions and teller stations. No change in use, egress or occupancy. | $78,275 |
| M00909628-I1-GC | 2023-08-24 | General construction | 119 2 AVENUE | Herewith filing a tenant fit out for Bank of America. No change to use egress or occupancy | $625,456 |
| M00862182-I1-MS | 2023-06-14 | Mechanical / HVAC | 941 LEXINGTON AVENUE | HVAC REPLACEMENT IN KIND IN THE ATM ROOM AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $152,001 |
| M00807531-I1-GC | 2023-04-04 | General construction | 633 THIRD AVENUE | Minor renovation to existing bank branch, including accessibility upgrade in the form of an accessible teller station. No change in use, egress or occupancy. | $14,565 |
| M08007527-I1-GC | 2023-03-31 | General construction | 161 DYCKMAN STREET | JPMorgan Chase Bank tenant improvement project to include modification of an existing tellar station for ADA compliance. No change to use, egress or occupancy under this applicati | $10,000 |
| M08011430-I1-GC | 2023-03-10 | General construction | 2824 BROADWAY | JPMorgan Chase Bank tenant improvement project to include modification of an existing tellar station for ADA compliance. No change to use, egress or occupancy under this applicati | $10,000 |
| B00752882-I1-GC-CX | 2023-01-30 | General construction | 6424 18 AVENUE | INTERIOR RENOVATION OF FIRST FLOOR IN EXISTING BANK SPACE, INCLUDING NEW PARTITIONS AND FINISHES. RENOVATION TO EXISTING MECHANICAL UNITS. NO CHANGE OF USE EGRESS OR OCCUPANCY. | $825,000 |
| B00752882-I1-GC-CX | 2023-01-30 | Mechanical / HVAC | 6424 18 AVENUE | INTERIOR RENOVATION OF FIRST FLOOR IN EXISTING BANK SPACE, INCLUDING NEW PARTITIONS AND FINISHES. RENOVATION TO EXISTING MECHANICAL UNITS. NO CHANGE OF USE EGRESS OR OCCUPANCY. | $825,000 |
| B00771505-I1-GC | 2022-10-24 | General construction | 8418 BAY PARKWAY | JPMorgan Chase Bank tenant improvement project to include modification of an existing tellar station for ADA compliance. No change to use, egress or occupancy under this applicati | $10,000 |
| M00670534-I1-MS | 2022-10-17 | Mechanical / HVAC | 60 EAST 42 STREET | Mechanical modifications taking place on the 1st Floor as per plans filed herewith. No change in Use, Egress or Occupancy. | $208,464 |
| B00622223-I1-MS | 2022-07-11 | Mechanical / HVAC | 127 7 AVENUE | REMOVE EXISTING AC UNIT & PART OF DUCTWORK. RIG NEW UNIT ONTO EXISTING DUNNAGE AND CONNECT TO EXISTING POWER. REPLACE PART OF EXISTIN DUCTWORK WITH NEW DUCTWORK. NEW SAFETY RAILS | $317,784 |
| B00622223-I1-MS | 2022-07-11 | General construction | 127 7 AVENUE | REMOVE EXISTING AC UNIT & PART OF DUCTWORK. RIG NEW UNIT ONTO EXISTING DUNNAGE AND CONNECT TO EXISTING POWER. REPLACE PART OF EXISTIN DUCTWORK WITH NEW DUCTWORK. NEW SAFETY RAILS | $317,784 |
| X00721408-I1-GC | 2022-05-25 | General construction | 557 MELROSE AVENUE | BANK RENOVATION WORK TO INCLUDE INTERIOR DEMOLITION AND FIT OUT ON NON-LOAD BEARING PARTITIONS, CEILINGS, DOORS, WORK TO INCLUDE STOREFRONT DOOR RENOVATION AND RELATED CONSTRUCTION | $159,755 |
| X00721756-I1-MS | 2022-05-25 | Mechanical / HVAC | 557 MELROSE AVENUE | BANK RENOVATION WORK TO INCUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $6,100 |
| Q00624627-I1-GC | 2022-04-02 | General construction | 97-45 QUEENS BOULEVARD | Interior renovation to existing bank branch including new full height and partial height partitions and associated finishes, and modifications to the teller line. No change in use, | $705,087 |
| M00623715-I1-GC | 2022-02-08 | General construction | 51 WEST 51 STREET | Minor renovation limited to the alteration of two (2) existing entrance vestibules to accommodate ADA compliance. No change in use, egress or occupancy. | $100,518 |
| Q00620403-I1-GC-CX | 2021-12-10 | General construction | 1912 MOTT AVENUE | HVAC REPLACEMENT | $195,641 |
| Q00620403-I1-GC-CX | 2021-12-10 | Mechanical / HVAC | 1912 MOTT AVENUE | HVAC REPLACEMENT | $195,641 |
| Q00577969-I1-MS | 2021-10-14 | Mechanical / HVAC | 110-36 MERRICK BOULEVARD | REMOVE AND REPLACE EXISTING HVAC EQUIPMENT, WIRING AND PIPING AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS | $108,598 |
| M00521716-I1-GC | 2021-08-25 | General construction | 360 EAST 72 STREET | MINOR RENOVATION OF EXISTING BANK BRANCH AT FIRST FLOOR, INCLUDING TELLER LINE MILLWORK ALTERATIONS AND ACCESSIBILITY WORK AT ENTRANCE DOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $54,000 |
| M00347147-I1-MS | 2021-04-15 | Mechanical / HVAC | 3291 BROADWAY | Mechanical Work for new offices and installation of new-condenser on roof. | $161,000 |
| M00282965-I1-MS | 2021-04-14 | Mechanical / HVAC | 2911A BROADWAY | installation of duct work along with related mechanical units. | $35,000 |
| S00455203-I1-GC | 2021-03-23 | General construction | 2505 RICHMOND AVENUE | Bank of America interior and exterior lighting upgrades. No change in use, egress, or occupancy. | $19,500 |
| M00415415-I1-MS | 2020-11-19 | Mechanical / HVAC | 462 BROADWAY | MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $129,961 |
| S00400356-I1-MS | 2020-11-17 | Mechanical / HVAC | 475 FOREST AVENUE | MECHANICAL IMPROVEMENT TO EXISTING SANTANDER BANK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $90,000 |
| Q00377621-I1-MS | 2020-08-31 | Mechanical / HVAC | 118-30 QUEENS BOULEVARD | AC UNIT REPLACEMENT AT CHASE BANK. MINOR PIPING MODIFICATIONS TO EXISTING OPENING TO BE LESS THAN 10 SQFT. CURRENT HVAC EQUIPMENT TO BE ABANDONED/LEFT IN PLACE. | $82,930 |
| S00373771-I1-MS | 2020-08-26 | Mechanical / HVAC | 3150 AMBOY ROAD | New mechanical work for Satnander Bank tenant improvement. | $90,000 |
| S00361150-I1-MS | 2020-07-22 | Mechanical / HVAC | 4310 AMBOY ROAD | Mechanical work for existing Santander Bank. No change to use, egress, or occupancy. | $90,000 |
| M00300583-I1-MS | 2020-02-25 | Mechanical / HVAC | 169 SEVENTH AVENUE | Mechanical modifications (Wells Fargo) as per plans. No change in use egress or occupancy. | $210,000 |
| M00202435-I1-MS | 2020-01-13 | Mechanical / HVAC | 475 WEST 23 STREET | One 3 ton HVAC unit to be installed in ATM. | $65,620 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
