COMPANY RECORD · NEW YORK, NY
Think Construction LLC — permit history in New York, NY
Think Construction LLC appears on 55 New York permit records from 2020 through 2026, most often general construction (60% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 33 | 60% |
| Mechanical / HVAC | 22 | 40% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 4 |
| 2021 | 5 |
| 2022 | 9 |
| 2023 | 10 |
| 2024 | 12 |
| 2025 | 7 |
| 2026 | 8 |
Busiest year on record: 2024, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Donato Plumbing, Inc | 9 | 2025-09-05 |
| Arcon Plbg Solutions | 5 | 2026-08-28 |
| Dynamic Blue Water Mech | 2 | 2025-07-08 |
| Kg Sprinkler Corp | 2 | 2024-04-22 |
| Zapas Construction Corp | 2 | 2025-12-05 |
| Aamway Service Co Inc | 1 | 2025-05-23 |
| Cobalt Mechanical Inc | 1 | 2022-04-28 |
| Master Plbg And Htg Inc | 1 | 2025-05-14 |
8 companies are named alongside Think Construction LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 300 WEST END AVENUE | 2026-08-24 |
| 7 HARRISON STREET | 2026-06-09 |
| 1165 PARK AVENUE | 2026-06-01 |
| 7 EAST 81 STREET | 2026-04-24 |
| 237 LAFAYETTE STREET | 2026-04-02 |
| 24 WEST 55 STREET | 2026-01-20 |
| 9 EAST 81 STREET | 2025-12-04 |
| 796 CARROLL STREET | 2025-08-20 |
| 107 SOUTH OXFORD STREET | 2025-07-07 |
| 15 CENTRAL PARK WEST | 2025-06-25 |
| 24 WEST 10 STREET | 2025-04-28 |
| 532 8 STREET | 2024-10-22 |
| 79 EAST 79 STREET | 2024-07-23 |
| 53 WEST 53 STREET | 2024-06-04 |
33 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $3,000 to $1,950,000, median $149,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
55 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01152523-S2-MS | 2026-08-24 | Mechanical / HVAC | 300 WEST END AVENUE | PROPOSED INTERIOR MECHANICAL MODIFICATION AT UNIT 04B, INCLUDING MODIFICATION TO BATHROOMS AND THE KITCHEN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY IS PROPOSED IN THIS APPLICATION. | $150,000 |
| M01152523-I1-GC | 2026-07-31 | General construction | 300 WEST END AVENUE | PROPOSED INTERIOR MODIFICATION AT UNIT 04B, INCLUDING MODIFICATION TO BATHROOMS AND THE KITCHEN. MODIFICATION WILL INCLUDE MODIFICATIONS TO PARTITIONS AND FINISHES THROUGHOUT. NO C | $544,800 |
| M01337243-I1-GC | 2026-06-09 | General construction | 7 HARRISON STREET | General construction for combination of units 7N and PH, including demolition of non-load bearing partitions, new partitions, doors, millwork, floor and wall finishes, as shown on | $870,000 |
| M01358879-I1-GC | 2026-06-01 | General construction | 1165 PARK AVENUE | INTERIOR RENOVATION OF AN EXISTING APARTMENT ON THE 10TH FLOOR. MINOR PARTITION CHANGES AND NEW FLOORS AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $427,200 |
| M00334084-I1-MS | 2026-04-24 | Mechanical / HVAC | 7 EAST 81 STREET | Installation of mechanical units in an Existing 4 Family multiple dwelling to a single family dwelling on the CELLAR, BASEMENT, 1st thru 4th floors, and ROOF. New Certificate of Oc | $550,005 |
| M01355974-I1-GC | 2026-04-02 | General construction | 237 LAFAYETTE STREET | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $100,000 |
| M01286832-I1-GC | 2026-01-20 | General construction | 24 WEST 55 STREET | Combine Apts. 10B&10C (per TPPN 3/97), removing and replacing wall,, ceiling and floor finishes, removing and adding non load bearing partitions, replacing kitchen cabinets and app | $225,000 |
| M01286832-S2-MS | 2026-01-20 | Mechanical / HVAC | 24 WEST 55 STREET | Herewith file mechanical plans to combine Apts. 10B & 10C, filed in conjunction with general construction. No change to use, egress or occupancy. | $90,000 |
| M01041163-S2-MS | 2025-12-04 | Mechanical / HVAC | 9 EAST 81 STREET | PROVIDE NEW MECHANICAL SYSTEM, NEW SPLIT SYSTEM HEATING/COOLING, NEW ENERY RECOVERY VENTILATORS, NEW KITCHEN AND BATH EXHAUST. | $60,000 |
| B01152181-S2-MS | 2025-08-20 | Mechanical / HVAC | 796 CARROLL STREET | Mechanical work as per plans. | $30,000 |
| B01152285-I1-GC | 2025-07-07 | General construction | 107 SOUTH OXFORD STREET | FILING HEREWITH FOR INTERIOR RENOVATION WORK TO INCLUDE DEMO OF EXISTING AND CONSTRUCTION OF NEW PARTITIONS AND FINISHES ON 002 FLOOR - FILED IN CONJUNCTION WITH DOB NOW PL (B01152 | $330,000 |
| B01152181-I1-GC | 2025-06-27 | General construction | 796 CARROLL STREET | renovations of existing a two family house. No change in use, egress, or occupancy. | $625,040 |
| M01213606-I1-GC | 2025-06-25 | General construction | 15 CENTRAL PARK WEST | MINOR INTERIOR RENOVATION TO EXISTING APARTMENT 32C ON THE 32TH OF AN EXISTING RESIDENTIAL BUILDING. ARCHITECTURAL WORK. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $602,000 |
| M01145276-I1-GC | 2025-04-28 | General construction | 24 WEST 10 STREET | FILING HEREWITH INTERIOR AND EXTERIOR RENOVATIONS OF BUILDING AS PER PLANS. NEW ROOF TERRACE AND PENTHOUSE. | $876,190 |
| M01041163-S1-GC-CX | 2025-01-22 | General construction | 9 EAST 81 STREET | STRUCTURAL AND FOUNDATION WORK IN CONJUNCTION WITH ALTERATION OF EXISTING 1-FAMILY DWELLING | $3,000 |
| M01041163-I1-GC | 2024-12-31 | General construction | 9 EAST 81 STREET | INTERIOR RENOVATION AT CELLAR, 1ST TO 5TH FLOORS & ROOF. HORIZONTAL ENLARGEMENT OF SECOND FLOOR. INSTALLATION OF NON-LOAD BEARING INTERIOR PARTITIONS & CEILINGS, REPLACEMENT OF STA | $1,950,000 |
| B00880713-S4-GC-CX | 2024-10-22 | General construction | 532 8 STREET | REMOVAL AND REPLACEMENT/REINFORCEMENT OF EXIST. WOOD FLOOR FRAMING WITH NEW STEEL/WOOD FRAMING. PARTIAL REMOVAL AND STEEL REINFORCEMENT OF EXIST REAR WALL FOR NEW WINDOWS, NEW READ | $44,000 |
| M01004484-I1-GC | 2024-07-23 | General construction | 79 EAST 79 STREET | General construction work as shown on the plans. | $268,369 |
| M01004484-S1-MS | 2024-07-23 | Mechanical / HVAC | 79 EAST 79 STREET | Mechanical work as shown on plans. | $7,081 |
| M00916570-I1-GC | 2024-06-04 | General construction | 53 WEST 53 STREET | Interior renovation of an existing apartment, minor partition work and finishes. No change in use, egress or occupancy. | $679,591 |
| B00927084-S2-MS | 2024-05-07 | Mechanical / HVAC | 1 CLINTON STREET | Mechanical work filed in conjunction with Interior Renovation of Apartment 38B as per plans. No change in Use, Egress or Occupancy. | $25,000 |
| M00972800-I1-GC | 2024-04-04 | General construction | 9 EAST 81 STREET | AT CELLAR, 1ST-5TH FLOORS: INTERIOR DEMOLITION,REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS &FINISH FLOORS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $200,000 |
| B00927084-I1-GC | 2024-03-01 | General construction | 1 CLINTON STREET | Interior Renovation of Apartment 38B as per plans. No change in Use, Egress or Occupancy. | $63,000 |
| M00932705-I1-MS | 2024-01-26 | Mechanical / HVAC | 142 5 AVENUE | MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $90,000 |
| M00967631-S2-MS | 2024-01-05 | Mechanical / HVAC | 1060 5 AVENUE | MECHANICAL WORK IN APARTMENT 8C ON THE 8TH FLOOR. NEW SPLIT DX SYSTEM AND EXHAUST SYSTEMS. VENTILATION PROVIDED BY ENERGY RECOVERY VENTILATOR. IN CONJUNCTION WITH GENERAL CONSTRUCT | $31,500 |
| M00967631-I1-GC | 2024-01-05 | General construction | 1060 5 AVENUE | RENOVATION OF 8TH FLOOR APARTMENT 8C. PARTITION CHANGES, RELOCATION OF PLUMBING FIXTURES AND APPLIANCES (PLUMBING APPLICATION DOC-S1). NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRE | $180,000 |
| M00932094-I1-GC | 2024-01-02 | General construction | 142 5 AVENUE | Herewith filing application for non-structural demo, removal and disposal of interior partitions, fixtures and finishes. Interior renovation, installation of new partitions, doors | $219,964 |
| B00880713-S4-ST | 2023-09-21 | General construction | 532 8 STREET | REMOVAL AND REPLACEMENT/REINFORCEMENT OF EXIST. WOOD FLOOR FRAMING WITH NEW STEEL/WOOD FRAMING. PARTIAL REMOVAL AND STEEL REINFORCEMENT OF EXIST REAR WALL FOR NEW WINDOWS, NEW READ | $44,000 |
| B00880713-S1-MS | 2023-09-21 | Mechanical / HVAC | 532 8 STREET | PROVIDE SPLIT-SYSTEM, HEAT PUMP VRF SYSTEM.REMOVE EXISTING STEAM BOILER AND HW HEATERS FLUES. PROVIDE NEW BOILER AND HW HEATER FLUES RUNTO ROOF VIA CHIMNEY AT NEW LOCATION. PROVIDE | $31,000 |
| B00880713-I1-GC | 2023-09-21 | General construction | 532 8 STREET | RENOVATION OF KITCHEN, DINING ROOM AND BATHROOM ON 001 FLOOR, MODIFICATION OF THE WINDOW AND DOOR OPENINGS ON THE REAR ELEVATION, DEMOLITION AND CONSTRUCTION OF NEW DECK IN THE BAC | $205,000 |
| M00845807-I1-GC | 2023-08-14 | General construction | 150 EAST 69 STREET | INTERIOR RENOVATION OF EXISTING APARTMENT OF THE 11TH FLOOR (UNIT 11D) INCLUDING NONLOADBEARING PARTITION WORK, AND MINOR PLUMBING WORK FILED UNDER SEPARATE LAA PERMIT. NO CHANGE O | $106,700 |
| M00848086-I1-MS | 2023-08-09 | Mechanical / HVAC | 555 PARK AVENUE | Modifications to existing HVAC system for unit 3W. No change in use, egress or occupancy. | $118,750 |
| M00848067-I1-GC | 2023-08-09 | General construction | 555 PARK AVENUE | Interior renovation of partitions, ceilings and doors for unit 3W. No change in use, egress or occupancy. | $450,100 |
| M00843550-I1-GC | 2023-05-22 | General construction | 170 SECOND AVENUE | Combination and Renovation of Apartments 16C & 16D as per TPPN 3/1997. There will be no change to use, occupancy or egress. | $194,400 |
| M00856013-I1-MS | 2023-05-22 | Mechanical / HVAC | 170 SECOND AVENUE | Duct work proposed for apartments 16C & 16D as per TPPN 3/97. There will be no change to use, occupancy or egress. | $5,000 |
| M00826904-S1-MS | 2023-05-11 | Mechanical / HVAC | 115 CENTRAL PARK WEST | Subsequent Mechanical scope of work for Apartment 11B. | $75,000 |
| M00826904-I1-GC | 2023-05-04 | General construction | 115 CENTRAL PARK WEST | Renovate residential apartment 11B as per plans filed herewith. No change to use, egress, or occupancy under this application. | $310,500 |
| B00618720-I1-MS | 2022-09-12 | Mechanical / HVAC | 363 WASHINGTON AVENUE | Installation of mechanical system with related piping, as per plans submitted. | $130,000 |
| B00618694-I1-GC | 2022-09-06 | General construction | 363 WASHINGTON AVENUE | Herewith filing for the conversion of an existing multiple dwelling to a single family. Work will consist of general construction, as per plans submitted. | $603,850 |
| M00589361-I1-GC | 2022-06-21 | General construction | 45 GRAMERCY PARK NORTH | New opening for vent | $5,000 |
| M00661901-I1-GC | 2022-06-15 | General construction | 1 7 AVENUE | Renovate Apt. #503, work is general construction. No change to use, egress or occupancy. | $149,500 |
| M00582152-I1-GC | 2022-05-04 | General construction | 50 WEST 88 STREET | CONVERSION OF A MULTIPLE DWELLING TO A SINGLE FAMILY HOME. RENOVATE FRONT FACADE, STAIR AND INTERIOR. NEW WINDOW OPENINGS AT REAR FACADE. A NEW CERTIFICATE OF OCCUPANCY WILL BE OBT | $744,500 |
| M00629244-I1-MS | 2022-04-22 | Mechanical / HVAC | 50 WEST 88 STREET | MECHANICAL WORK PROPOSED AS PER PLANS FOR A SINGLE FAMILY HOME. | $85,000 |
| B00587787-I1-GC | 2022-04-19 | General construction | 19 STRONG PLACE | Partial interior renovation of a two family dwelling unit with no enlargement or change to use, egress of occupancy. | $655,000 |
| M00617796-I1-GC | 2022-04-13 | General construction | 40 EAST 80 STREET | General construction in Apt. 21B. No change to use, egress or occupancy. | $237,000 |
| M00634947-I1-GC | 2022-01-28 | General construction | 1016 FIFTH AVENUE | HEREWITH SUBMIT APPLICATION FOR THE RENOVATION OF APT 12D, INCLUDING REMOVING AND INSTALLING NON-BEARING PARTITIONS AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $205,000 |
| M00583378-S2-MS | 2021-10-21 | Mechanical / HVAC | 45 GRAMERCY PARK NORTH | Mechanical work in conjunction with the renovation of apartment @1A/2A at the First and second floor. No change in use, egress or occupancy. | $25,000 |
| M00583378-I1-GC | 2021-10-08 | General construction | 45 GRAMERCY PARK NORTH | Renovation of an existing duplex apartment 1A/2A. work include non-structural demolition and general construction as per plans filed herewith. No change to use egress or occupancy | $250,000 |
| M00466692-S1-MS | 2021-06-15 | Mechanical / HVAC | 30 FIFTH AVENUE | SUBSEQUENT APPLICATION FOR MECHANICAL WORK OF COMBINED APT.#15CD LOCATED AT 15TH FL (ACTUAL 14TH FLOOR). GENERAL CONSTRUCTION FILED UNDER ALT. # 140994994 & PLUMBING WORK FILED UND | $40,000 |
| M00456437-I1-GC | 2021-04-16 | General construction | 440 RIVERSIDE DRIVE | Minor interior renovation including removal & installation of non-load bearing partitions, finishes & fixtures. Install paving & guardrail for pathway to existing roof deck. No c | $1,169,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
