COMPANY RECORD · NEW YORK, NY
Symmetrical Construc Corp — permit history in New York, NY
Symmetrical Construc Corp appears on 206 New York permit records from 2020 through 2026, most often general construction (75.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 186 | 75.9% |
| Mechanical / HVAC | 59 | 24.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 3 |
| 2021 | 37 |
| 2022 | 34 |
| 2023 | 34 |
| 2024 | 40 |
| 2025 | 61 |
| 2026 | 36 |
Busiest year on record: 2025, with 61 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Signore & Sons Plbg Corp | 9 | 2026-03-06 |
| Ht Plumbing & Heating Cor | 4 | 2025-11-24 |
| Doval Plbg & Htg Corp | 3 | 2025-10-08 |
| Infiniti Esc Plumbing Cor | 3 | 2025-03-07 |
| S.O.S. Plbg & Htg Ltd | 3 | 2023-05-05 |
| Prime Piping & Heating In | 3 | 2024-07-30 |
| M & M Piping And Heating | 2 | 2025-01-15 |
| Katan P & H Inc | 2 | 2025-04-18 |
| L & N Plumbing, Inc | 2 | 2024-04-09 |
| G.M.A. Mechanical Corp | 2 | 2025-04-28 |
| Ips Plumbing Corp | 2 | 2025-12-09 |
| Qbk Plumbing & Htng Inc | 2 | 2026-02-04 |
42 companies are named alongside Symmetrical Construc Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1704 YATES AVENUE | 2026-08-20 |
| 1524 AVENUE M | 2026-08-12 |
| 29 JACKSON AVENUE | 2026-08-04 |
| 1852 TENBROECK AVENUE | 2026-08-03 |
| 65 SHERMAN AVENUE | 2026-07-22 |
| 461 WALES AVENUE | 2026-06-23 |
| 455 WALES AVENUE | 2026-06-18 |
| 1021 EAST 163 STREET | 2026-06-17 |
| 133-20 SPRINGFIELD BOULEVARD | 2026-06-11 |
| 98-01 37 AVENUE | 2026-06-05 |
| 59 GRAND STREET | 2026-06-05 |
| 685 1 AVENUE | 2026-05-21 |
| 725 CO-OP CITY BOULEVARD | 2026-05-14 |
| 7819 ROOSEVELT AVENUE | 2026-05-14 |
189 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $715,000, median $28,050. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
206 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| X01339023-I1-GC | 2026-08-20 | General construction | 1704 YATES AVENUE | file application to legalize to rebuild part of existing garage with small addition and address wwp violation #39159328L | $15,655 |
| B01443934-I1-GC | 2026-08-12 | General construction | 1524 AVENUE M | The scope of work consists of replacing existing floor, wall and ceiling finishes; new millwork including counters and shelves; and replacing the existing storefront with a new one | $15,000 |
| S01389997-I1-GC | 2026-08-04 | General construction | 29 JACKSON AVENUE | THE SCOPE OF WORK CONSISTS OF INTERIOR RENOVATION OF AN EXISTING BASEMENT IN A TWO-FAMILY HOUSE. INCLUDING NEW KITCHEN, BEDROOM AND TOILET, | $32,560 |
| X00948049-S2-GC | 2026-08-03 | General construction | 1852 TENBROECK AVENUE | legalize fixed roof awning structure over existing deck to address ECB violation #39185900M. | $8,000 |
| M01432136-I1-GC | 2026-07-22 | General construction | 65 SHERMAN AVENUE | Proposed interior renovation of existing restaurant on first floor; to remove partition to create an opening between commercial spaces and add new seating area. | $22,000 |
| X01139118-I1-GC | 2026-06-23 | General construction | 461 WALES AVENUE | REMOVE ILLEGAL CONSTRUCTION IN CELLAR TO COMPLY WITH THE ORDER OF THE COMMISSIONER TO RESTORE TO LEGAL CONDITION. SEE BIS JOB # 210018130. SIGNED OFF ON 9/9/2011. NO CHANGE IN USE, | $15,000 |
| X01139077-I1-GC | 2026-06-18 | General construction | 455 WALES AVENUE | REMOVE ILLEGAL CONSTRUCTION IN CELLAR TO COMPLY WITH THE ORDER OF THE COMMISSIONER TO RESTORE TO LEGAL CONDITION. SEE BIS JOB # 201 111 938, SIGNED OFF ON 6/8/2017. NO CHANGE IN US | $15,000 |
| X01413204-I1-GC-CX | 2026-06-17 | General construction | 1021 EAST 163 STREET | The scope of work consists of installing new commercial hood and equipment, new toilet with new finishes. Build new mezzanine for dining and stair from ground to mezzanine. | $12,750 |
| X01413204-I1-GC-CX | 2026-06-17 | Mechanical / HVAC | 1021 EAST 163 STREET | The scope of work consists of installing new commercial hood and equipment, new toilet with new finishes. Build new mezzanine for dining and stair from ground to mezzanine. | $12,750 |
| Q01408639-I1-GC-CX | 2026-06-11 | General construction | 133-20 SPRINGFIELD BOULEVARD | Interior renovation of existing commercial space, including new interior finishes, installation of new equipment, and new plumbing fixtures. Work includes related plumbing and gene | $25,000 |
| Q01408639-I1-GC-CX | 2026-06-11 | Mechanical / HVAC | 133-20 SPRINGFIELD BOULEVARD | Interior renovation of existing commercial space, including new interior finishes, installation of new equipment, and new plumbing fixtures. Work includes related plumbing and gene | $25,000 |
| Q01405555-I1-GC | 2026-06-05 | General construction | 98-01 37 AVENUE | The scope of work consists of installing a new temporary / removable outdoor glass structure for goods displays. | $2,000 |
| M01322465-S5-GC | 2026-06-05 | General construction | 59 GRAND STREET | Exterior general construction work | $5,001 |
| M01164061-I1-MS | 2026-05-21 | Mechanical / HVAC | 685 1 AVENUE | This project consists of remodeling a vacant space to build new food establishment deli including new commercial kitchen, exhaust hood, new lighting and new air fan coil units. | $122,060 |
| M01164061-I1-MS | 2026-05-21 | General construction | 685 1 AVENUE | This project consists of remodeling a vacant space to build new food establishment deli including new commercial kitchen, exhaust hood, new lighting and new air fan coil units. | $122,060 |
| X01398426-I1-GC | 2026-05-14 | General construction | 725 CO-OP CITY BOULEVARD | The scope of work consists of installing a new plastic glass removable outdoor structure for customers' seating. | $5,000 |
| Q01390410-I1-GC | 2026-05-14 | General construction | 7819 ROOSEVELT AVENUE | The scope of work consists of removing all finishes and installing new storefront and interior finishes, ceiling, lighting, counter, shelves, and sinks. | $15,200 |
| B01371620-I1-GC | 2026-05-08 | General construction | 272 ETNA STREET | REMOVAL OF INTERIOR NON-BEARING WALLS ON CELLAR LEVEL AND EXTERIOR REAR YARD WOODEN ROOF STRUCTURE. | $25,000 |
| X00951926-I1-GC | 2026-05-07 | General construction | 1261 EVERGREEN AVENUE | Provide Group day care center in cellar. | $60,000 |
| M00945004-I1-MS | 2026-04-22 | General construction | 1858 LEXINGTON AVENUE | INTERIOR ALTERATION OF AN EXISTING OLD LAW TENEMENT. APARTMENTS TO BE RENOVATED AT EACH FLOOR. ONE STORE TO BE RENOVATED AT THE FIRST FLOOR AND CELLAR STORAGE. NO CHANGE IN USE OR | $715,000 |
| M00945004-I1-ST | 2026-04-22 | Mechanical / HVAC | 1858 LEXINGTON AVENUE | INTERIOR ALTERATION OF AN EXISTING OLD LAW TENEMENT. APARTMENTS TO BE RENOVATED AT EACH FLOOR. ONE STORE TO BE RENOVATED AT THE FIRST FLOOR AND CELLAR STORAGE. NO CHANGE IN USE OR | $715,000 |
| M00945004-I1-MS | 2026-04-22 | Mechanical / HVAC | 1858 LEXINGTON AVENUE | INTERIOR ALTERATION OF AN EXISTING OLD LAW TENEMENT. APARTMENTS TO BE RENOVATED AT EACH FLOOR. ONE STORE TO BE RENOVATED AT THE FIRST FLOOR AND CELLAR STORAGE. NO CHANGE IN USE OR | $715,000 |
| M00945004-I1-ST | 2026-04-22 | General construction | 1858 LEXINGTON AVENUE | INTERIOR ALTERATION OF AN EXISTING OLD LAW TENEMENT. APARTMENTS TO BE RENOVATED AT EACH FLOOR. ONE STORE TO BE RENOVATED AT THE FIRST FLOOR AND CELLAR STORAGE. NO CHANGE IN USE OR | $715,000 |
| X01354991-I1-GC | 2026-04-17 | Mechanical / HVAC | 2702A EAST TREMONT AVENUE | RENOVATE EXISTING RESTAURANT, BUILD HALF PARITION WITH COUNTER, MOVE EXISTING NON-LOAD BEARING, REMOVE HVAC UNIT, ADD STAINLESS STEEL PANELS IN KITCHEN. PLASTER AND PAINTING, REMOV | $75,000 |
| X01354991-I1-MS | 2026-04-17 | Mechanical / HVAC | 2702A EAST TREMONT AVENUE | RENOVATE EXISTING RESTAURANT, BUILD HALF PARITION WITH COUNTER, MOVE EXISTING NON-LOAD BEARING, REMOVE HVAC UNIT, ADD STAINLESS STEEL PANELS IN KITCHEN. PLASTER AND PAINTING, REMOV | $75,000 |
| X01354991-I1-GC | 2026-04-17 | General construction | 2702A EAST TREMONT AVENUE | RENOVATE EXISTING RESTAURANT, BUILD HALF PARITION WITH COUNTER, MOVE EXISTING NON-LOAD BEARING, REMOVE HVAC UNIT, ADD STAINLESS STEEL PANELS IN KITCHEN. PLASTER AND PAINTING, REMOV | $75,000 |
| X01354991-I1-MS | 2026-04-17 | General construction | 2702A EAST TREMONT AVENUE | RENOVATE EXISTING RESTAURANT, BUILD HALF PARITION WITH COUNTER, MOVE EXISTING NON-LOAD BEARING, REMOVE HVAC UNIT, ADD STAINLESS STEEL PANELS IN KITCHEN. PLASTER AND PAINTING, REMOV | $75,000 |
| X01224960-S2-GC | 2026-04-13 | General construction | 242 GAR BALCOM AVENUE | herby filing application to sign off work done & completed under X01249960-I1. | $1,000 |
| Q01359791-I1-GC-CX | 2026-03-11 | Mechanical / HVAC | 94 -15 SUTPHIN BOULEVARD | The scope of work consists of installing new commercial kitchen with equipment, sinks, exhaust fan and fire suppression system and new finishes. | $56,000 |
| Q01359791-I1-GC-CX | 2026-03-11 | General construction | 94 -15 SUTPHIN BOULEVARD | The scope of work consists of installing new commercial kitchen with equipment, sinks, exhaust fan and fire suppression system and new finishes. | $56,000 |
| X01231289-I1-GC | 2026-03-05 | General construction | 1260 TELLER AVENUE | CONVERT A 2 FAMILY TO A 6 FAMILY DWELLING UNITS INTERIOR REMODELING ON ALL FLOORS. | $170,046 |
| B01359592-I1-GC-CX | 2026-03-03 | Mechanical / HVAC | 6342 VETERANS AVENUE | The scope of work consists of installing new commercial kitchen, equipment exhaust duct and fan with fire suppression system, also replace glass door and storefront with wall, ceil | $12,600 |
| B01359592-I1-GC-CX | 2026-03-03 | General construction | 6342 VETERANS AVENUE | The scope of work consists of installing new commercial kitchen, equipment exhaust duct and fan with fire suppression system, also replace glass door and storefront with wall, ceil | $12,600 |
| M01322465-I1-GC | 2026-02-23 | General construction | 59 GRAND STREET | Construction work as shown on plans | $325,010 |
| X01308811-I1-GC | 2026-02-19 | General construction | 1482 WESTCHESTER AVENUE | Minor interior renovation of existing store. No change in use, occupancy of egress. | $25,000 |
| M01339598-I1-GC | 2026-01-05 | General construction | 1666 BROADWAY | Smoke shop: new finishes and shelves. no changes to the building egress, use of occupancy. | $15,000 |
| Q01147537-I1-GC | 2025-12-24 | General construction | 91-04 97 AVENUE | INSTALLATION OF SOFFIT ON 2ND & 3RD FLOOR KITCHENETTES TO REMOVE VACATE ORDER. | $5,000 |
| Q01317236-I1-GC | 2025-12-24 | General construction | 150-46 76 ROAD | INTERIOR ALTERATION FOR EXISTING 2 STORY RESIDENTIAL HOUSE. NO CHANGE IN EGRESS, USE, AND OCCUPANCY UNDER THIS APPLICATION | $100,000 |
| X01323849-I1-GC | 2025-12-10 | Mechanical / HVAC | 1165 SOUTHERN BOULEVARD | NEW TENANT FIT-OUT FOR RETAIL SPACE ON 1ST FLOOR. (BEAUTY STORE, UG VI) WORK INCLUDES INSTALLATION OF NON-BEARING PARTITIONS, CEILING & LIGHTING, MISC. CARAPETRY, AND NEW HVAC/VENT | $45,000 |
| X01323849-I1-MS | 2025-12-10 | General construction | 1165 SOUTHERN BOULEVARD | NEW TENANT FIT-OUT FOR RETAIL SPACE ON 1ST FLOOR. (BEAUTY STORE, UG VI) WORK INCLUDES INSTALLATION OF NON-BEARING PARTITIONS, CEILING & LIGHTING, MISC. CARAPETRY, AND NEW HVAC/VENT | $45,000 |
| X01323849-I1-GC | 2025-12-10 | General construction | 1165 SOUTHERN BOULEVARD | NEW TENANT FIT-OUT FOR RETAIL SPACE ON 1ST FLOOR. (BEAUTY STORE, UG VI) WORK INCLUDES INSTALLATION OF NON-BEARING PARTITIONS, CEILING & LIGHTING, MISC. CARAPETRY, AND NEW HVAC/VENT | $45,000 |
| X01323849-I1-MS | 2025-12-10 | Mechanical / HVAC | 1165 SOUTHERN BOULEVARD | NEW TENANT FIT-OUT FOR RETAIL SPACE ON 1ST FLOOR. (BEAUTY STORE, UG VI) WORK INCLUDES INSTALLATION OF NON-BEARING PARTITIONS, CEILING & LIGHTING, MISC. CARAPETRY, AND NEW HVAC/VENT | $45,000 |
| X01256745-I1-GC | 2025-11-07 | General construction | 150 WEST FORDHAM ROAD | The scope of work consists of replacing interior finishes (floor and wall) with new, new counter and shelves. no changes to building egress, occupancy or use. | $67,725 |
| Q01231564-I1-GC-CX | 2025-11-05 | Mechanical / HVAC | 100-22 37 AVENUE | Interior renovation of the deli store and installation of cooking equipment for the kitchen rangehood, and motor blower as per plan. No change to use, egress, or occupancy under th | $25,000 |
| Q01231564-I1-GC-CX | 2025-11-05 | General construction | 100-22 37 AVENUE | Interior renovation of the deli store and installation of cooking equipment for the kitchen rangehood, and motor blower as per plan. No change to use, egress, or occupancy under th | $25,000 |
| M01242692-I1-GC | 2025-10-30 | General construction | 2 FORT WASHINGTON AVENUE | APPLICATION FILED FOR THE FIT OUT OF EXISTING MERCANTILE SPACE TO FOOD & BEVERAGE WITH <75 OCC. NO CHANGE TO USE, OCCUPNCY OR EGRESS. ALL WORK AS PER PLANS SUBMITTED HEREWITH. | $50,050 |
| B01301557-I1-GC-CX | 2025-10-27 | General construction | 427 NEW LOTS AVENUE | The scope of work consists of interior renovation and a vacant commercial space for a new deli with commercial kitchen, hood and fire suppression. no changes to egress, occupancy o | $26,100 |
| B01301557-I1-GC-CX | 2025-10-27 | Mechanical / HVAC | 427 NEW LOTS AVENUE | The scope of work consists of interior renovation and a vacant commercial space for a new deli with commercial kitchen, hood and fire suppression. no changes to egress, occupancy o | $26,100 |
| B01291168-I1-GC | 2025-10-22 | General construction | 200 GRAHAM AVENUE | The scope of work consists of building new counter and shelving, new finishes, relocation of existing equipment, install new and new exhaust hood | $3,200 |
| X01259315-I1-GC | 2025-10-22 | General construction | 801 SOUNDVIEW AVENUE | INTERIOR RENOVATION FOR EXISTING PIZZERIA, NEW DOOR IN STORE FRONT,REPLACE COOKING EQUIPMENT AND INSTALL NEW PLUMBING FIXTURES.NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. | $99,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
