COMPANY RECORD · NEW YORK, NY
Sweeney & Conroy Inc — permit history in New York, NY
Sweeney & Conroy Inc appears on 27 New York permit records from 2020 through 2025, most often general construction (74.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 20 | 74.1% |
| Mechanical / HVAC | 7 | 25.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 1 |
| 2021 | 2 |
| 2022 | 8 |
| 2023 | 5 |
| 2024 | 4 |
| 2025 | 7 |
Busiest year on record: 2022, with 8 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Donato Plumbing, Inc | 3 | 2024-10-10 |
| Arcon Plbg Solutions | 2 | 2026-04-07 |
| Master Plbg And Htg Inc | 2 | 2026-05-06 |
3 companies are named alongside Sweeney & Conroy Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 432 HUDSON STREET | 2025-12-03 |
| 4 EAST 66 STREET | 2025-09-11 |
| 12 EAST 69 STREET | 2025-06-06 |
| 61 CHARLES STREET | 2024-12-20 |
| 138 EAST 74 STREET | 2024-04-18 |
| 1133 5 AVENUE | 2023-11-08 |
| 226 EAST 49 STREET | 2023-06-21 |
| 117 EAST 72 STREET | 2023-06-01 |
| 4 SUTTON SQUARE | 2022-12-08 |
| 166 NORTH 12 STREET | 2022-11-16 |
| 68 MORTON STREET | 2022-05-18 |
| 1133 FIFTH AVENUE | 2022-05-17 |
| 86 RIVERSIDE DRIVE | 2021-12-03 |
| 66 MORTON STREET | 2021-09-02 |
15 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $6,000 to $7,796,100, median $148,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
27 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01324476-I1-GC | 2025-12-03 | General construction | 432 HUDSON STREET | Herewith filing for a Temporary Mock up for Landmarks hearing, as per plans. No change to use, egress or occupancy. | $6,000 |
| M01228307-I1-MS | 2025-09-11 | Mechanical / HVAC | 4 EAST 66 STREET | HEREWITH FILING FOR MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS | $230,943 |
| M01228269-I1-GC | 2025-09-10 | General construction | 4 EAST 66 STREET | HEREWITH FILING FOR INTERIOR DEMO & FITOUT AND EXTERIOR WORK AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. | $1,417,500 |
| M01127822-S2-GC-CX | 2025-06-06 | General construction | 12 EAST 69 STREET | STRUCTURAL AND FOUNDATION SCOPE ASSOCIATED WITH TOWNHOUSE RENOVATION AS PER PLANS FILED HEREWITH. | $2,369,371 |
| M01127822-S7-GC-CX | 2025-03-24 | General construction | 12 EAST 69 STREET | STRUCTURAL DEMOLITION AS PER PLANS FILED HEREWITH. | $148,500 |
| M01127822-I1-GC | 2025-03-18 | General construction | 12 EAST 69 STREET | Renovate existing building including new egress stair and new elevator. No change in use and no change to bulk of the building. | $7,796,100 |
| M01127822-S3-MS | 2025-03-18 | Mechanical / HVAC | 12 EAST 69 STREET | MECHANICAL WORK ASSOCIATED WITH TOWNHOUSE RENOVATION AS PER PLANS FILED HEREWITH. | $2,000,000 |
| M01071902-I1-MS | 2024-12-20 | Mechanical / HVAC | 61 CHARLES STREET | Mechanical work in conjunction with Alt CO | $450,000 |
| M01041803-I1-GC | 2024-12-06 | General construction | 61 CHARLES STREET | Convert 3 family 4 story building to 1 family 4 story with PH. New rear extension. | $859,000 |
| M01056525-I1-GC | 2024-09-12 | General construction | 12 EAST 69 STREET | INTERIOR DEMOLITION AS PER PLANS FILED. NO CHANGE TO USE EGRESS NOR OCCUPANCY. | $998,000 |
| M01001335-I1-GC | 2024-04-18 | General construction | 138 EAST 74 STREET | Herewith filing partial demolition work/sequence, as per plans submitted. Work is filed in conjunction with ALT 1 #: 121330327 and M08008884. | $70,000 |
| M00939868-I1-GC | 2023-11-08 | General construction | 1133 5 AVENUE | PARTIAL REMOVAL OF STRUCTURAL SLABS AND FRAMING AT 15TH, 16TH, AND ROOF LEVELS. PARTIAL REMOVAL OF NON-LOAD BEARING MASONRY WALL AT 16TH FLOOR ALL AS SHOWN ON DRAWINGS. FILED IN CO | $20,000 |
| M00854170-I1-GC | 2023-06-21 | General construction | 226 EAST 49 STREET | Interior Renovation of existing five story Single-Family Residence as per plans. Installation of Non-Structural Partitions, doors and Finishes. No Change to Use, Egress or Occupanc | $800,530 |
| M00819281-I1-GC | 2023-06-01 | General construction | 117 EAST 72 STREET | This application is filed for Interior and exterior renovation including enlargement. New CO will be obtained during sign-off. No change in use, egress, or occupancy. | $5,433,597 |
| M00819281-S2-MS | 2023-05-25 | Mechanical / HVAC | 117 EAST 72 STREET | Interior renovation of the existing apartment associated with the Mechanical work scope. The proposed scope includes the installation of a new split system. No change in use, egres | $992,725 |
| M00862672-I1-GC | 2023-04-26 | General construction | 138 EAST 74 STREET | PROPOSED TEMPORARY MOCKUP STRUCTURE AS REQUIRED BY LANDMARKS PRESERVATION COMMISSION | $7,000 |
| M08008884-I1-GC | 2022-12-09 | General construction | 138 EAST 74 STREET | Herewith filing interior non-structural demolition and General Construction work, as per plans submitted. There is no change to use, egress or occupancy. | $65,000 |
| M08023232-I1-GC | 2022-12-08 | General construction | 4 SUTTON SQUARE | INTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUANCY. | $800,014 |
| M08024871-I1-MS | 2022-12-08 | Mechanical / HVAC | 4 SUTTON SQUARE | MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $100,016 |
| B08038084-I1-GC | 2022-11-16 | General construction | 166 NORTH 12 STREET | INSTALLATION OF TEMPORARY SCAFFOLD-SHORING SYSTEM AS SHOWN ON DRAWINGS. | $13,000 |
| B00781037-I1-GC | 2022-10-04 | General construction | 166 NORTH 12 STREET | Application being filed for the interior renovation of the 1st and 2nd floors as per plans filed herewith. Work to include removal of non-load bearing interior partitions, doors, m | $100,080 |
| M00794829-I1-GC | 2022-09-01 | General construction | 1133 5 AVENUE | INSTALLATION OF TEMPORARY ALTERNATE PLATFORM AND TEMPORARY SYSTEM SCAFFOLD STAIR AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH CONSTRUCTION APPLICATION M00520677 AND STRUC | $7,500 |
| M00685364-I1-GC | 2022-05-18 | General construction | 68 MORTON STREET | Herewith filing chimney extension to comply with height requirements related to neighboring construction work at 66 Morton Street. General Construction plans included with chimney | $10,000 |
| M00520726-I1-MS | 2022-05-17 | Mechanical / HVAC | 1133 FIFTH AVENUE | NSTALLATION OF FOUR AC UNITS | $120,000 |
| M00634408-I1-GC | 2021-12-03 | General construction | 86 RIVERSIDE DRIVE | Remove non load bearing partitions, flooring, ceilings, finishes, fixtures, staircase, handrails, fire mantel, doors frame as per plans filed herewith. No change in egress, use or | $147,000 |
| M00570340-I1-GC | 2021-09-02 | General construction | 66 MORTON STREET | INSTALLATION OF TEMPORARY STAIRS AS PER PLANS FILED HEREWITH. FILED IN CONJUNCTION WITH CONSTRUCTION APPLICATION 123416794. | $7,500 |
| M00256378-I1-MS | 2020-01-16 | Mechanical / HVAC | 11 JANE STREET | mechanical work for buildout of duplex apartment on 5th & 6th floors. | $364,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2025, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
