COMPANY RECORD · NEW YORK, NY

Super Cool HVAC, LLC — permit history in New York, NY

Super Cool HVAC, LLC appears on 39 New York permit records from 2020 through 2026, most often mechanical / hvac (86.4% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC3886.4%
General construction613.6%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20201
20215
20227
202313
20248
20254
20266

Busiest year on record: 2023, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
In House Group Inc22026-03-18
Rahim Home Improvementllc12026-01-27

2 companies are named alongside Super Cool HVAC, LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
330 WEST END AVENUE2026-04-28
21-46 44 DRIVE2026-03-18
660 EAST 19 STREET2026-01-27
51 EAST 7 STREET2026-01-20
68 EAST 127 STREET2025-10-09
388 HALSEY STREET2025-09-25
465 WEST BROADWAY2025-09-08
89-53 215 STREET2025-02-20
119 CALYER STREET2024-07-15
282 CONVENT AVENUE2024-06-26
312 5 AVENUE2024-05-16
325 EMPIRE BOULEVARD2024-05-06
31 WEST 94 STREET2024-04-25
792 EAST 19 STREET2024-04-11

36 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $13,795 to $320,000, median $54,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

39 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01309329-I1-MS2026-04-28Mechanical / HVAC330 WEST END AVENUEInstallation of a new heat pump system for space cooling$30,000
M01309329-I1-MS2026-04-28General construction330 WEST END AVENUEInstallation of a new heat pump system for space cooling$30,000
M01304102-I1-MS2026-03-19Mechanical / HVAC330 WEST END AVENUENEW VRF AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS IN COURTYARD OF BUILDING. NO CHANGE IN USE OR OCCUPANCY.$24,290
Q01299949-S2-MS2026-03-18Mechanical / HVAC21-46 44 DRIVEINSTALLATION OF NEW ROOFTOP PACKAGE UNIT ALONG WITH DUCTWORK AND ASSOCIATED PIPING AS PER THE DRAWINGS FILED HEREIN.$85,000
B01228549-S1-MS2026-01-27Mechanical / HVAC660 EAST 19 STREETPROPOSED NEW MECHANICAL SYSTEM INSTALLATION THROUGHOUT THE BUILDING, INCLUDING ASSOCIATED EQUIPMENT, DUCTWORK, PIPING, ETC AS PER PLANS$48,000
M01323165-I1-MS2026-01-20Mechanical / HVAC51 EAST 7 STREETELECTRIFICATION OF A RESIDENTIAL BUILDING. SCOPE OF WORK ON BASEMENT, LEVEL 1, LEVEL 2, LEVEL 3, LEVEL 4, AND ROOF. INSTALLATION OF NEW VRF EQUIPMENT AT EACH APARTMENT UNIT AND ELE$90,000
M01271608-I1-MS2025-10-09Mechanical / HVAC68 EAST 127 STREETINTERIOR WORK ONLY- NO EXTERIOR WORK PROPOSED. RENOVATION OF AN EXISTING MULTI-FAMILY BUILDING. SCOPE OF WORK ON CELLAR, BASEMENT, FIRST FLOOR, SECOND FLOOR, THIRD FLOOR. NEW VRF I$71,000
B01273825-I1-MS2025-09-25Mechanical / HVAC388 HALSEY STREETELECTRIFICATION OF A RESIDENTIAL BUILDING. SCOPE OF WORK ON LEVEL 1, LEVEL 2, LEVEL 3, LEVEL 4, AND ROOF. INSTALLATION OF NEW VRF EQUIPMENT AT EACH APARTMENT UNIT AND ELECTRIC HEA$140,000
M01207910-I1-MS2025-09-08Mechanical / HVAC465 WEST BROADWAYModification of ductwork from existing A/C system due to relocated non-structural interior partitions and ceilings. No mechanical systems to be added, removed, or replaced.$50,000
Q01159756-I1-GC2025-02-20General construction89-53 215 STREETFILING TO RESOLVE WOODEN STRUCTURE AT REAR OF PROPERTY IN-ORDER TO RESOLVE ECB VIOLATION #: 35560216M & 39129579Z.$35,000
B01030923-S1-MS2024-07-15Mechanical / HVAC119 CALYER STREETINSTALLATION OF SPLIT SYSTEM AS PER PLANS IN CONJUNCTION WITH JOB APPLICATION B01030923-I1$30,000
M00909357-I1-MS2024-06-26Mechanical / HVAC282 CONVENT AVENUEInstallation of new heat pump system with condensers on roof as per plans attached herewith. No change in use, egress and occupancy.$44,000
B00984102-I1-MS2024-05-16Mechanical / HVAC312 5 AVENUENEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS IN REAR YARD OF BUILDING. NO CHANGE IN USE OR OCCUPANCY.$130,000
B01034925-I1-MS2024-05-06Mechanical / HVAC325 EMPIRE BOULEVARDPROPOSED MECHANICAL WORK ON EXIST CELLAR, 1ST - 3RD FLOOR OF AN EXISTING 3 STORY MIXED USE BUILDING (WORK ON RESIDENTIAL ONLY). NO CHANGE IN USE, EGRESS AND OCCUPANCY.$36,000
M00998766-I1-MS2024-04-25Mechanical / HVAC31 WEST 94 STREETInstallation of New split system Heat pump air conditioning system to supply heating and cooling to all apartments$80,000
B00970952-I1-MS2024-04-11Mechanical / HVAC792 EAST 19 STREETNEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTINGBUILDING. NEW OUTDOOR CONDENSERS IN REAR-SIDE YARD OFBUILDING. NO CHANGE IN USE OR OCCUPANCY.$50,000
X01009028-I1-MS2024-04-10Mechanical / HVAC2435 GRAND CONCOURSENEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON ROOF OF BUILDING. NO CHANGE IN USE OR OCCUPANCY.$163,000
M00982572-I1-MS2024-03-13Mechanical / HVAC406 EAST 73 STREETNEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON 2ND FLOOR ROOF. NO CHANGE IN USE OR OCCUPANCY.$190,000
B08008974-I1-MS2023-11-20Mechanical / HVAC151 GRAND STREETNew HVAC equipment and Installation for an existing multifamily building. No change of use, egress or occupancy under this application.$320,000
M00925091-I1-MS2023-10-10Mechanical / HVAC319 WEST 16 STREETREMOVAL OF EXISTING BOILER AND NEW HVAC EQUIPMENT INSTALLATION FOR AN EXISTING MULTI-FAMILY RESIDENTIAL BUILDING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.$55,495
B00905921-I1-MS2023-08-11Mechanical / HVAC163 CRYSTAL STREETConstruction of (2) new mini split systems with associated distribution.$40,000
B00846711-I1-MS2023-08-02Mechanical / HVAC103 PILLING STREETNew HVAC equipment and installation for an existing multi-family residential building. No change of use, egress or occupancy under this application.$61,002
M00889539-I1-MS2023-07-11Mechanical / HVAC533 WEST 148 STREETTO FURNISH & INSTALL MULTIPLE HEAT PUMP INVERTER MINI-SPLIT SYSTEMS PER TENANT TO MEET BLDG. HEATING DEMAND AS NOTED ON SHEET M-001.00 FOR THE EXIST. UNITS. NO CHANGE IN USE, OCCUP$65,070
X00834811-I1-MS2023-05-30General construction1966 ELLIS AVENUEInstallation of New VRF System, including (10) New VRF Indoor units, (3) new VRF Outdoor Condenser Units, and associated supply/return/condensate piping and insulation.$158,107
X00834811-I1-MS2023-05-30Mechanical / HVAC1966 ELLIS AVENUEInstallation of New VRF System, including (10) New VRF Indoor units, (3) new VRF Outdoor Condenser Units, and associated supply/return/condensate piping and insulation.$158,107
Q00701348-I1-GC-CX2023-05-18Mechanical / HVAC69-17 68 STREETInstallation of New VRF Split System, including (6) Indoor Units and (2) Outdoor Condensers; Installation of associated supply/return/drain piping, pipe insulation; Patching, seali$33,478
Q00701348-I1-GC-CX2023-05-18General construction69-17 68 STREETInstallation of New VRF Split System, including (6) Indoor Units and (2) Outdoor Condensers; Installation of associated supply/return/drain piping, pipe insulation; Patching, seali$33,478
X00834811-I1-GC2023-05-11Mechanical / HVAC1966 ELLIS AVENUEInstallation of New VRF System, including (10) New VRF Indoor units, (3) new VRF Outdoor Condenser Units, and associated supply/return/condensate piping and insulation.$158,107
X00834811-I1-GC2023-05-11General construction1966 ELLIS AVENUEInstallation of New VRF System, including (10) New VRF Indoor units, (3) new VRF Outdoor Condenser Units, and associated supply/return/condensate piping and insulation.$158,107
X00808409-I1-MS2023-04-28Mechanical / HVAC2935 THROOP AVENUENEW HVAC EQUIPMENT AND INSTALLATION FOR AN EXISTING 2 FAMILY HOUSE. See comment#24$52,000
B08009077-I1-MS2023-01-20Mechanical / HVAC134 NOBLE STREETNew HVAC equipment and installation for a renovated 3 family home. No change of use, egress or occupancy under this application.$70,000
M08010524-I1-MS2022-12-01Mechanical / HVAC297 EAST 3 STREETInstallation of New VRF System, including (13) New VRF Indoor units, (4) new VRF Outdoor Condenser Units, and associated supply/return/condensate piping and insulation. Install ne$189,472
M08010524-I1-MS2022-12-01General construction297 EAST 3 STREETInstallation of New VRF System, including (13) New VRF Indoor units, (4) new VRF Outdoor Condenser Units, and associated supply/return/condensate piping and insulation. Install ne$189,472
M08018557-I1-MS2022-11-11Mechanical / HVAC313 WEST 78 STREETPropose installation of split systems in cellar, 001, 002, 003, 004, 005 and roof all as per plans filed herewith. No change in use occupancy or egress under this application.7-10-$46,500
B08005596-I1-MS2022-10-20Mechanical / HVAC38 MESEROLE STREETTO FURNISH & INSTALL TWO (2) 5-TON VRF HEAT PUMP INVERTER SYSTEMS W/TWO (2) MULTI-POSITION AHUS TO REPLACE EX. HVAC EQUIPMENT IN APT. 5A & 5B TO MEET THE HVAC DEMAND AS NOTED ON SH$34,995
B00642270-I1-MS2022-08-28Mechanical / HVAC11 BERKELEY PLACETO FURNISH & INSTALL MULTIPLE INVERTER MINI-SPLIT HEAT PUMP SYSTEMS PER TENANT TO MEET BLDG. HEATING DEMAND AS NOTED ON SHEET M-001.00 FOR THE EXIST. (4) APT. UNITS. NO CHANGE IN U$53,000
B00657813-I1-MS2022-03-24Mechanical / HVAC1224 PACIFIC STREETTO FURNISH & INSTALL 45.5-TONS OF MULTI-SPLIT HEAT PUMP SYSTEMS W/(51) DUCTLESS WALL MOUNTED AHUS WITHIN EXISTING. (15) UNIT APT. BLDG. TO PROVIDE FULL BUILDING HEATING & COOLING L$208,800
X00657816-I1-MS2022-03-23Mechanical / HVAC654 MANIDA STREETTO FURNISH & INSTALL THREE (3) 3-TON MULTI-SPLIT HEAT PUMP ASHP SYSTEMS W/(11) DUCTLESS AHUS WITHIN EXISTING TWO-FAMILY RESIDENTIAL UNITS & LANDLORD SPACE TO PROVIDE FULL BUILDING $44,001
M00566740-I1-MS2021-08-10Mechanical / HVAC161 WEST 129 STREETFURNISH & INSTALL (3) MULTI-SPLIT HEAT PUMP INVERTER SYSTEMS, 4-TON UNIT IN THE REAR YARD, 2 & 3-TON SYSTEM MOUNTED ON THE ROOF PARAPET. THERE ARE (12) DUCTLESS AHUS IN THE EXISTIN$50,000
M00470582-I1-MS2021-07-27Mechanical / HVAC120 EAST 86 STREETTO FURNISH ONE (1) 15-TON SELF-CONTAINED A/C UNIT REPLACING EXIST. HVAC UNIT TO CONNECT TO EXIST. OFFICE SA & OA DUCTWORK TO MEET EXIST. OFFICE COOLING LOAD. NO CHANGE IN USE, OCCU$55,000
M00547940-I1-MS2021-07-27Mechanical / HVAC531 EAST 5 STREETNEW VRF SYSTEM AND DIRECT REPLACEMENT OF EXISTING HVAC ROOFTOP UNIT LOCATED ON THE LOWER ROOF OF THE BUILDING ON EXISTING DUNNAGE STEEL AND RECONNECT UTILITIES. NO CHANGE IN USE, O$74,000
B00447936-I1-MS2021-02-22Mechanical / HVAC165 PUTNAM AVENUEFURNISH & INSTALL BUILDING SINGLE FAMILY TWO (2) HEAT PUMP INVERTER HEATING & COOLING UNITS IN REAR YARD WITH EIGHT (8) T-STAT WALL MOUNTED DUCTLESS AIR HANDLERS THRU-OUT. NO CHANG$42,329
M00422060-I1-MS2021-02-01Mechanical / HVAC330 WEST END AVENUEFURNISH & INSTALL ONE (1) 3 TON MULTI-SPLIT HEAT PUMP SYSTEMS WITH THREE (3) INDOOR DUCTLESS AHUS WITHIN EXIST. APARTMENT 9A. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$13,795
X00422057-I1-MS2020-11-30Mechanical / HVAC2940 LURTING AVENUEFURNISH & INSTALL TWO (2) 3.75 TON MULTI-SPLIT HEAT PUMP SYSTEMS WITH NINE (9) DUCTLESS AHUS WITHIN EXIST. SEMI-ATTACHED HOME TO PROVIDE FULL BUILDING HEATING DEMAND AT 17 DEGREES $21,500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →