COMPANY RECORD · NEW YORK, NY

Statcon Development LLC — permit history in New York, NY

Statcon Development LLC appears on 102 New York permit records from 2022 through 2026, most often general construction (78.6% of the record).

Permit categories

CategoryPermitsShare
General construction9278.6%
Mechanical / HVAC2521.4%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20229
202345
202439
202512
202612

Busiest year on record: 2023, with 45 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Flow-Right Plbg & Htg Cor202026-06-11
Quality Plumbing, Inc172026-06-08
Flow-Right Fire Supp Corp82024-09-06
Capital Contr P&H Corp42025-02-07
Jb Buzco Plumbing LLC32022-12-16
Mvs Heating & Air Condit12024-02-09
Plumbing Plbg & Plbg Corp12023-12-22

7 companies are named alongside Statcon Development LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
546 BRITTON AVENUE2026-04-29
544 BRITTON AVENUE2026-04-29
128 CROMWELL AVENUE2026-04-23
132 CROMWELL AVENUE2026-03-20
279 ALTER AVENUE2025-12-15
106 HAMDEN AVENUE2025-11-21
19 VULCAN STREET2025-01-28
23 VULCAN STREET2025-01-16
429A ALTER AVENUE2025-01-09
429B ALTER AVENUE2025-01-08
15 VULCAN STREET2025-01-08
24 GAR GOFF AVENUE2024-07-18
328 ROBINSON AVENUE2024-07-05
332 ROBINSON AVENUE2024-07-03

39 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $501,774, median $0. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

102 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
S01319069-I1-GC2026-04-29General construction546 BRITTON AVENUEConstruct a three-story, two-family dwelling with built-in one car garage.$0
S01319070-I1-ST2026-04-29General construction544 BRITTON AVENUEConstruct a three-story, two-family dwelling with built-in one car garage.$0
S01319070-I1-FO2026-04-29General construction544 BRITTON AVENUEConstruct a three-story, two-family dwelling with built-in one car garage.$0
S01319070-I1-GC2026-04-29General construction544 BRITTON AVENUEConstruct a three-story, two-family dwelling with built-in one car garage.$0
S01319069-I1-ST2026-04-28General construction546 BRITTON AVENUEConstruct a three-story, two-family dwelling with built-in one car garage.$0
S01319069-I1-FO2026-04-28General construction546 BRITTON AVENUEConstruct a three-story, two-family dwelling with built-in one car garage.$0
S01260007-I1-FO2026-04-23General construction128 CROMWELL AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S01260007-I1-GC2026-04-23General construction128 CROMWELL AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S01260007-I1-ST2026-04-23General construction128 CROMWELL AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S01260022-I1-GC2026-03-20General construction132 CROMWELL AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S01260022-I1-ST2026-03-19General construction132 CROMWELL AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S01260022-I1-FO2026-03-19General construction132 CROMWELL AVENUEConstruct a two family residence with accessory off-street parking for two cars.$0
S01245610-I1-FO2025-12-15General construction279 ALTER AVENUEThree-story two-family dwelling with accessory parking for one car.$0
S01245610-I1-ST2025-12-15General construction279 ALTER AVENUEThree-story two-family dwelling with accessory parking for one car.$0
S01245610-I1-GC2025-12-15General construction279 ALTER AVENUEThree-story two-family dwelling with accessory parking for one car.$0
S01136214-S2-MS2025-11-21Mechanical / HVAC106 HAMDEN AVENUEHVAC FILING FOR RESIDENTIAL HOUSE$0
S01136214-I1-ST2025-04-22General construction106 HAMDEN AVENUENEW TWO FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR ONE CAR$0
S01136214-I1-FO2025-04-22General construction106 HAMDEN AVENUENEW TWO FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR ONE CAR$0
S01136214-I1-GC2025-04-22General construction106 HAMDEN AVENUENEW TWO FAMILY DWELLING WITH ACCESSORY ON-GRADE PARKING FOR ONE CAR$0
S00915679-S2-MS2025-01-28Mechanical / HVAC19 VULCAN STREET1)INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATING AND COOLING OF EACH RESIDENCE. 2)INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.$0
S00915681-S2-MS2025-01-16Mechanical / HVAC23 VULCAN STREET1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00950462-S3-MS2025-01-09Mechanical / HVAC429A ALTER AVENUE1)INSTALLATION OF GAS FURNACES WITH SPLIT SYSTEM DX COILS FOR HEATING AND COOLING. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION.$0
S00950518-S3-MS2025-01-08Mechanical / HVAC429B ALTER AVENUE1)INSTALLATION OF GAS FURNACES WITH SPLIT SYSTEM DX COILS FOR HEATING AND COOLING. INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION.$0
S00915682-S2-MS2025-01-08Mechanical / HVAC15 VULCAN STREET1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00864150-I1-GC2024-07-18General construction24 GAR GOFF AVENUEAPPLICATION FILED TO CONSTRUCT A ONE (1) STORY FRAME-SLAB ON GRADE FULLY DETACHED ONE (1) CAR GARAGE - GARAGE FILED IN CONJUNCTION WITH NEW TWO (2) FAMILY HOME FILED UNDER APPLICAT$0
S00896987-S3-MS2024-07-05Mechanical / HVAC328 ROBINSON AVENUE1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE. 2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00896986-S3-MS2024-07-03Mechanical / HVAC332 ROBINSON AVENUE1) INSTALLATION OF GAS FURNACE WITH SPLIT SYSTEM DX COIL FOR HEATINGAND COOLING OF EACH RESIDENCE. 2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACHRESIDENCE.$0
S00864150-I1-ST2024-05-22General construction24 GAR GOFF AVENUEAPPLICATION FILED TO CONSTRUCT A ONE (1) STORY FRAME-SLAB ON GRADE FULLY DETACHED ONE (1) CAR GARAGE - GARAGE FILED IN CONJUNCTION WITH NEW TWO (2) FAMILY HOME FILED UNDER APPLICAT$0
S00864150-I1-EA2024-05-21General construction24 GAR GOFF AVENUEAPPLICATION FILED TO CONSTRUCT A ONE (1) STORY FRAME-SLAB ON GRADE FULLY DETACHED ONE (1) CAR GARAGE - GARAGE FILED IN CONJUNCTION WITH NEW TWO (2) FAMILY HOME FILED UNDER APPLICAT$0
S00864150-I1-FO2024-05-21General construction24 GAR GOFF AVENUEAPPLICATION FILED TO CONSTRUCT A ONE (1) STORY FRAME-SLAB ON GRADE FULLY DETACHED ONE (1) CAR GARAGE - GARAGE FILED IN CONJUNCTION WITH NEW TWO (2) FAMILY HOME FILED UNDER APPLICAT$0
S00897022-S3-MS2024-04-26Mechanical / HVAC431A ALTER AVENUEInstallation of New HVAC System$0
S00897023-S3-MS2024-04-26Mechanical / HVAC431B ALTER AVENUEInstallation of New HVAC System$0
S00915679-I1-ST2024-04-22General construction19 VULCAN STREETCONSTRUCT A TWO-FAMILY DWELLING WITH BUILD-IN THREE CAR GARAGE.$0
S00915679-I1-GC2024-04-22General construction19 VULCAN STREETCONSTRUCT A TWO-FAMILY DWELLING WITH BUILD-IN THREE CAR GARAGE.$0
S00915679-I1-FO2024-04-22General construction19 VULCAN STREETCONSTRUCT A TWO-FAMILY DWELLING WITH BUILD-IN THREE CAR GARAGE.$0
S00915682-I1-FO2024-04-02General construction15 VULCAN STREETConstruct a two family residence with accessory off-street parking for two cars.$0
S00915682-I1-GC2024-04-02General construction15 VULCAN STREETConstruct a two family residence with accessory off-street parking for two cars.$0
S00915681-I1-FO2024-04-02General construction23 VULCAN STREETConstruct a two family residence with accessory off-street parking for two cars.$0
S00915681-I1-GC2024-04-02General construction23 VULCAN STREETConstruct a two family residence with accessory off-street parking for two cars.$0
S00915678-I1-FO2024-04-01General construction23GAR VULCAN STREETConstruct an accessory detached one-car garage.$0
S00915678-I1-GC2024-04-01General construction23GAR VULCAN STREETConstruct an accessory detached one-car garage.$0
S00915678-I1-ST2024-04-01General construction23GAR VULCAN STREETConstruct an accessory detached one-car garage.$0
S00915680-I1-GC2024-04-01General construction15GAR VULCAN STREETConstruct an accessory detached one-car garage.$0
S00915680-I1-ST2024-03-28General construction15GAR VULCAN STREETConstruct an accessory detached one-car garage.$0
S00915680-I1-FO2024-03-28General construction15GAR VULCAN STREETConstruct an accessory detached one-car garage.$0
S00915682-I1-ST2024-03-27General construction15 VULCAN STREETConstruct a two family residence with accessory off-street parking for two cars.$0
S00915681-I1-ST2024-03-27General construction23 VULCAN STREETConstruct a two family residence with accessory off-street parking for two cars.$0
S00950518-I1-FO2024-03-18General construction429B ALTER AVENUECONSTRUCT A ONE FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING FOR ONE CAR$0
S00950462-I1-GC2024-03-18General construction429A ALTER AVENUECONSTRUCT A ONE FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING FOR ONE CAR$0
S00950462-I1-FO2024-03-18General construction429A ALTER AVENUECONSTRUCT A ONE FAMILY RESIDENCE WITH ACCESSORY OFF-STREET PARKING FOR ONE CAR$0

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →