COMPANY RECORD · NEW YORK, NY
Skf General Contractors — permit history in New York, NY
Skf General Contractors appears on 37 New York permit records from 2020 through 2026, most often general construction (68.3% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 614945 | 41 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | SKF GENERAL CONTRACTORS, |
|---|---|
| Business address on file | 1144 EVERGREEN AVENUE STE 1 BRONX NY 10472 |
| Business phone on file | (347) 615-9235 |
| Licence number | 614945 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Skf General Contractors by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 28 | 68.3% |
| Mechanical / HVAC | 13 | 31.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 1 |
| 2021 | 6 |
| 2022 | 14 |
| 2023 | 5 |
| 2024 | 6 |
| 2025 | 6 |
| 2026 | 3 |
Busiest year on record: 2022, with 14 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every New York permit, not only this company's
This page is a snapshot of Skf General Contractors. The search behind it holds more than 352,308 New York permits naming a contractor, since 2019: 151,351 building permits, 117,270 plumbing permits, 72,431 mechanical (HVAC) permits, 43,000 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Skf General Contractors files, or any new building permit in New York. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Alltech Plumbing LLC | 12 | 2026-09-25 |
| Full Capacity Fire Corp | 12 | 2026-08-27 |
| Cape Plumbing Inc | 2 | 2023-04-07 |
| Expert Fire Sprinkler,Llc | 2 | 2023-05-16 |
4 companies are named alongside Skf General Contractors on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 210 EAST 18 STREET | 2026-08-18 |
| 2095 ANTHONY AVENUE | 2026-03-26 |
| 2097 ANTHONY AVENUE | 2026-03-24 |
| 2495 SEDGWICK AVENUE | 2025-10-30 |
| 2055 RYER AVENUE | 2025-07-15 |
| 1318 SOUTHERN BOULEVARD | 2025-06-16 |
| 2076 WALTON AVENUE | 2025-05-14 |
| 189 EAST 205 STREET | 2025-02-12 |
| 173 EAST 205 STREET | 2025-02-12 |
| 1771 WEEKS AVENUE | 2024-12-04 |
| 829 TILDEN STREET | 2024-10-30 |
| 2324 WEBSTER AVENUE | 2024-08-15 |
| 4427 WHITE PLAINS ROAD | 2024-05-06 |
| 170 EAST 206 STREET | 2023-02-27 |
16 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $7,000,000, median $3,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Full Capacity Fire Corp | 11 | 2022–2026 |
| Pinnacle Plbg & Htg Corp | 5 | 2021–2025 |
| Signore & Sons Plbg Corp | 1 | 2024–2025 |
| Expert Fire Sprinkler,Llc | 1 | 2023 |
| Cape Plumbing Inc | 1 | 2023 |
Companies that also appear in New York permit records at addresses where Skf General Contractors filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
37 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01413962-I1-GC | 2026-08-18 | General construction | 210 EAST 18 STREET | INTERIOR RENOVATION OF AN EXISTING TOWNHOUSE, INCLUDING PARTITION CHANGES AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $621,200 |
| X01239762-I1-GC | 2026-03-26 | General construction | 2095 ANTHONY AVENUE | PROPOSED 71 UNITS. 10 STORY RESIDENTIAL BUILDING. | $0 |
| X01250532-I1-GC | 2026-03-24 | General construction | 2097 ANTHONY AVENUE | PROPOSED 61 UNITS - 10 STORY RESIDENTIAL BUILDING FILED IN CONJUNCTION WITH NB X01239762-I1 | $0 |
| X01258370-I1-GC | 2025-10-30 | General construction | 2495 SEDGWICK AVENUE | ALT-CO TO CHANGE STORAGE ROOM - OCCUPANCY GROUP S-2 TO RECREATION ROOM - OCCUPANCY GROUP R-2 AT BASEMENT LEVEL AND MINOR INTERIOR RENOVATION. | $120,135 |
| X01133320-I1-GC | 2025-07-15 | General construction | 2055 RYER AVENUE | NEW 12 STORY WITH BASEMENT - 95 UNIT RESIDENTIAL APARTMENT BUIDING. | $0 |
| X01187387-I1-GC | 2025-06-16 | General construction | 1318 SOUTHERN BOULEVARD | ALT-CO TO CHANGE RETAIL SPACE TO AFTER SCHOOL PROGRAM AT 1ST FLOOR. | $100,000 |
| X00658388-I1-MS | 2025-05-14 | Mechanical / HVAC | 2076 WALTON AVENUE | Install mechanical systems per the plans filed herewith and in conjunction with NB#240301721. There is no change in use occupancy or egress. | $1,000 |
| X00487074-I1-MS | 2025-02-12 | Mechanical / HVAC | 189 EAST 205 STREET | Install ventilation systems and ducting. There is no change in use occupancy or egress. | $1,000 |
| X00605126-I1-MS | 2025-02-12 | Mechanical / HVAC | 173 EAST 205 STREET | Install mechanical systems per drawings filed herewith and in conjunction with NB#240301794. There is no change in use, occupancy, or egress. | $1,000 |
| X00288074-I1-MS | 2024-12-11 | Mechanical / HVAC | 2495 SEDGWICK AVENUE | Provide new ventilation and HVAC system in conjunction with New Building NB 220716964 | $1,000 |
| X00568294-I1-MS | 2024-12-04 | Mechanical / HVAC | 1771 WEEKS AVENUE | Install mechanical systems per the plans filed herewith and in conjunction with NB#X00544328. There is no change in use occupancy or egress. | $1,000 |
| X00950828-S2-MS | 2024-10-30 | Mechanical / HVAC | 829 TILDEN STREET | Mechanical work in conjunction with ALT CO | $1,000 |
| X00506219-I1-GC | 2024-08-15 | General construction | 2324 WEBSTER AVENUE | NEW APARTMENT BUILDING WITH COMMUNITY FACILITY - DAYCARE ON FIRST FLOOR | $7,000,000 |
| X01045983-I1-MS | 2024-05-06 | Mechanical / HVAC | 4427 WHITE PLAINS ROAD | ALT 2 FILED TO OBTAIN EQUIPMENT USE CARDS FOR HVAC UNITS APPROVED, PERMITTED, AND INSTALLED UNDER NB 220694700. NO WORK TO BE DONE UNDER THIS APPLICATION. NO CHANCE OF OCCUPANCY, U | $1,000 |
| X00950828-I1-GC | 2024-04-11 | General construction | 829 TILDEN STREET | ALT CO to make changes to the 1st Floor parking area and add storage. | $25,000 |
| X00544328-I1-GC | 2023-06-08 | General construction | 1771 WEEKS AVENUE | New 59 unit apartment building. | $6,000,000 |
| X00667188-I1-EA | 2023-03-17 | General construction | 189 EAST 205 STREET | STRUCTURE, FOUNDATION ASSOCIATED WITH NB 240301552 | $4,000 |
| X08046883-I1-GC-CX | 2023-02-27 | Mechanical / HVAC | 170 EAST 206 STREET | Alteration CO to add Community Facility at cellar level. | $50,000 |
| X08046883-I1-GC-CX | 2023-02-27 | General construction | 170 EAST 206 STREET | Alteration CO to add Community Facility at cellar level. | $50,000 |
| X08027824-I1-MS | 2023-01-12 | Mechanical / HVAC | 2302 WEBSTER AVENUE | Alteration to obtain Equipment Use permits for HVAC filed under applications #X00489169 & #X00479742 | $1,000 |
| X00635718-I1-FO | 2022-11-18 | General construction | 173 EAST 205 STREET | Structure, and foundaion design in conjunction with NB 240301794 | $1,000 |
| X00769553-I1-GC | 2022-08-29 | General construction | 1318 SOUTHERN BOULEVARD | PROPOSED ALT-1 CO TO CHANGE THE USE GROUP OF THE COMMUNITY FACILITY LOCATED ON THE FIRST FLOOR. | $5,000 |
| X00677818-S1-FO | 2022-05-20 | General construction | 2076 WALTON AVENUE | Structural and foundation associated with NB 240301721 | $3,000 |
| X00677818-S1-ST | 2022-05-20 | General construction | 2076 WALTON AVENUE | Structural and foundation associated with NB 240301721 | $3,000 |
| X00677818-S1-GC | 2022-05-20 | General construction | 2076 WALTON AVENUE | Structural and foundation associated with NB 240301721 | $3,000 |
| X00635718-I1-GC | 2022-04-08 | General construction | 173 EAST 205 STREET | Structure, and foundaion design in conjunction with NB 240301794 | $1,000 |
| X00635718-I1-ST | 2022-04-08 | General construction | 173 EAST 205 STREET | Structure, and foundaion design in conjunction with NB 240301794 | $1,000 |
| X00635718-I1-EA | 2022-04-08 | General construction | 173 EAST 205 STREET | Structure, and foundaion design in conjunction with NB 240301794 | $1,000 |
| X00667188-I1-GC | 2022-04-05 | General construction | 189 EAST 205 STREET | STRUCTURE, FOUNDATION ASSOCIATED WITH NB 240301552 | $4,000 |
| X00667188-I1-ST | 2022-04-05 | General construction | 189 EAST 205 STREET | STRUCTURE, FOUNDATION ASSOCIATED WITH NB 240301552 | $4,000 |
| X00667188-I1-FO | 2022-03-30 | General construction | 189 EAST 205 STREET | STRUCTURE, FOUNDATION ASSOCIATED WITH NB 240301552 | $4,000 |
| X00678907-S1-FO | 2022-03-30 | General construction | 1771 WEEKS AVENUE | Structural, foundation associated with NB X00544328-I1 | $300 |
| X00678907-S1-ST | 2022-03-30 | General construction | 1771 WEEKS AVENUE | Structural, foundation associated with NB X00544328-I1 | $300 |
| X00678907-S1-GC | 2022-03-29 | General construction | 1771 WEEKS AVENUE | Structural, foundation associated with NB X00544328-I1 | $300 |
| X00569787-I1-MS | 2021-09-27 | Mechanical / HVAC | 2302 WEBSTER AVENUE | ALTERATION TYPE 1 TO PROPOSE DAYCARE ON THE FIRST FLOOR, REVISE COMMERCIAL SPACES LAYOUT AND SHOW HVAC UNITS ON 1ST FLOOR ROOF SCHEDULE OF OCCUPANCY. NO WORK TO BE DONE ON CELLAR, | $387,500 |
| X00569787-I1-MS | 2021-09-27 | General construction | 2302 WEBSTER AVENUE | ALTERATION TYPE 1 TO PROPOSE DAYCARE ON THE FIRST FLOOR, REVISE COMMERCIAL SPACES LAYOUT AND SHOW HVAC UNITS ON 1ST FLOOR ROOF SCHEDULE OF OCCUPANCY. NO WORK TO BE DONE ON CELLAR, | $387,500 |
| X00569787-I1-GC | 2021-09-27 | General construction | 2302 WEBSTER AVENUE | ALTERATION TYPE 1 TO PROPOSE DAYCARE ON THE FIRST FLOOR, REVISE COMMERCIAL SPACES LAYOUT AND SHOW HVAC UNITS ON 1ST FLOOR ROOF SCHEDULE OF OCCUPANCY. NO WORK TO BE DONE ON CELLAR, | $387,500 |
| X00569787-I1-GC | 2021-09-27 | Mechanical / HVAC | 2302 WEBSTER AVENUE | ALTERATION TYPE 1 TO PROPOSE DAYCARE ON THE FIRST FLOOR, REVISE COMMERCIAL SPACES LAYOUT AND SHOW HVAC UNITS ON 1ST FLOOR ROOF SCHEDULE OF OCCUPANCY. NO WORK TO BE DONE ON CELLAR, | $387,500 |
| X00479692-I1-GC-CX | 2021-06-24 | General construction | 2302 WEBSTER AVENUE | Interior work inside corner commercial space, work includes erecting new partitions, new floor tiles, and interior finishes. Work also to install new commercial range hood, related | $25,000 |
| X00479692-I1-GC-CX | 2021-06-24 | Mechanical / HVAC | 2302 WEBSTER AVENUE | Interior work inside corner commercial space, work includes erecting new partitions, new floor tiles, and interior finishes. Work also to install new commercial range hood, related | $25,000 |
| X00401282-I1-MS | 2020-11-25 | Mechanical / HVAC | 1144 EVERGREEN AVENUE | Provide new HVAC system for Daycare space. | $1,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
