COMPANY RECORD · NEW YORK, NY
Skanska USA Building, Inc — permit history in New York, NY
Skanska USA Building, Inc appears on 112 New York permit records from 2020 through 2026, most often general construction (57.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 64 | 57.1% |
| Mechanical / HVAC | 48 | 42.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 4 |
| 2021 | 20 |
| 2022 | 15 |
| 2023 | 8 |
| 2024 | 14 |
| 2025 | 27 |
| 2026 | 24 |
Busiest year on record: 2025, with 27 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Rael Automatic Spr.Co Inc | 9 | 2026-08-17 |
| Sirina Fire Prot Corp | 6 | 2026-06-25 |
| Riehm Plumbing Corp | 4 | 2026-06-25 |
| Aspro Plumbing Inc | 2 | 2024-06-26 |
| Louis L.Buttermark & Sons | 2 | 2022-03-15 |
| Olympic Plbg & Htg Svc In | 2 | 2025-12-11 |
| Par Fire Protection LLC | 2 | 2026-07-31 |
| Par Plumbing Co., Inc | 2 | 2026-07-31 |
| Bancker Plumbing Corp | 1 | 2024-04-10 |
| Cardoza Plumbing Corp | 1 | 2025-11-06 |
| J.M. Botto Inc | 1 | 2025-06-16 |
| Lemode Plbg & Htg Corp | 1 | 2025-06-06 |
13 companies are named alongside Skanska USA Building, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 424 EAST 34 STREET | 2026-08-27 |
| 55-90 48 STREET | 2026-08-18 |
| 150 55 STREET | 2026-08-04 |
| 562 FIRST AVENUE | 2026-07-30 |
| 981 8 AVENUE | 2026-07-15 |
| 170 WILLIAM STREET | 2026-06-26 |
| 1120 AMSTERDAM AVENUE | 2026-06-01 |
| 603 WEST 218 STREET | 2026-05-27 |
| 20 WEST 137 STREET | 2026-04-03 |
| 900 GRESHAM ROAD | 2026-03-03 |
| 523 EAST 70 STREET | 2025-12-01 |
| 632 SECOND AVENUE | 2025-11-17 |
| 1470 MADISON AVENUE | 2025-10-09 |
| 186 JORALEMON STREET | 2025-09-17 |
35 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $13,071,039, median $282,255. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
112 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01252914-S1-MS | 2026-08-27 | Mechanical / HVAC | 424 EAST 34 STREET | HEREWITH FILING FOR MODIFICATION OF MECHANICAL DUCTWORK FOR THE PRE/POST OP ROOMS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $231,920 |
| M01252914-I1-GC | 2026-08-27 | General construction | 424 EAST 34 STREET | Herewith filing for interior modification of prepost rooms as per plans. no change in use, egress or occupancy. | $311,400 |
| Q01418522-I1-MS | 2026-08-18 | Mechanical / HVAC | 55-90 48 STREET | Filing mechanical plans to update AC unit installed and mistakenly omitted from previous filing Q00538865-S1 and obtain COC's. No change in egress, use, or occupancy. | $1,000 |
| M01252904-I1-GC | 2026-08-11 | General construction | 424 EAST 34 STREET | Herewith filing for interior renovations on the ground floor of MER Storage rooms as per plans. No change in use, egress or occupancy. | $112,856 |
| M01252904-S1-MS | 2026-08-11 | Mechanical / HVAC | 424 EAST 34 STREET | HEREWITH FILING FOR MODIFICATION OF MECHANICAL DUCTWORK AND RELATED SYSTEMS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $70,500 |
| B01270357-S1-MS | 2026-08-04 | Mechanical / HVAC | 150 55 STREET | NYULH BROOKLYN - 3500 ONCOLOGY BEDS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $3,000,000 |
| M01391832-I1-GC | 2026-07-30 | General construction | 424 EAST 34 STREET | KIMMEL INTERIOR RENOVATION GROUND AND FIRST FLOORS - GENERAL CONSTRUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $40,000 |
| M01392196-I1-GC | 2026-07-30 | General construction | 562 FIRST AVENUE | TISCH DECANT CELLAR FLOOR INTERIOR RENOVATION - GENERAL CONSTRUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $35,000 |
| B01270357-I1-GC | 2026-07-29 | General construction | 150 55 STREET | NYULH BROOKLYN - 3500 ONCOLOGY BEDS - GENERAL CONSTRUCTION INCLUDING MODIFICATIONS TO EXISTING FLOORS, PARTITIONS, CEILINGS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, | $1,000,000 |
| M01413855-I1-GC | 2026-07-15 | General construction | 981 8 AVENUE | NYU LANGONE - 981 8TH AVENUE OFFICE FIT-OUTS - EARLY INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $180,000 |
| M01350659-S1-MS | 2026-06-26 | Mechanical / HVAC | 170 WILLIAM STREET | LMH OB 6FL: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING. | $800,000 |
| M01350659-I1-GC | 2026-06-26 | General construction | 170 WILLIAM STREET | LMH OB 6fl: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,100,000 |
| M01264739-I1-GC | 2026-06-01 | General construction | 1120 AMSTERDAM AVENUE | Renovation/Conversion of dorm suites to fully accessible single/double occupant sleeping rooms, proposed turnstiles and modifications to office/conference/lounge rooms as per plans | $13,071,039 |
| M01393880-I1-GC | 2026-05-27 | General construction | 603 WEST 218 STREET | Resurfacing and repairs of tennis courts as per plans filed. No change in use, egress or occupancy. | $150,000 |
| M01310514-I1-GC | 2026-04-13 | General construction | 1120 AMSTERDAM AVENUE | Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Progr | $807,505 |
| M01324471-I1-GC | 2026-04-03 | General construction | 20 WEST 137 STREET | G HEREWITH FOR INSTALLATION OF PERMANENT CHAINLINK FENCE TO PROTECT VACANT LOT AS REQUIRED BY THE NYC CHARTER SECTION 2904. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $144,000 |
| M01190490-S6-MS | 2026-03-03 | Mechanical / HVAC | 900 GRESHAM ROAD | Sub-slab depressurization system as shown on drawings filed herewith. | $0 |
| M01345361-I1-GC | 2026-02-11 | General construction | 170 WILLIAM STREET | LMH OB 5fl: MODIFICATION OF INTERIOR AND EXTERIOR WALLS AND WINDOWS TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUP | $200,000 |
| M01258232-I1-GC | 2026-02-11 | General construction | 424 EAST 34 STREET | Removal of of existing landscape area, granite curb, stone wall, and bollards and Installation of new landscaping, concrete egress area, additional detention to handle new impervio | $2,000,000 |
| M01227502-I1-GC | 2026-02-06 | General construction | 424 EAST 34 STREET | HUB consultation meeting held 6/6/25. Herewith filing for parking garage removal for Emergency Dept expansion as per plans. | $8,032,100 |
| M01190490-S4-GC | 2026-02-05 | General construction | 900 GRESHAM ROAD | Structural and foundation work as shown on drawings filed herewith. | $0 |
| M01190490-S4-FO | 2026-02-05 | General construction | 900 GRESHAM ROAD | Structural and foundation work as shown on drawings filed herewith. | $0 |
| M01190490-S4-ST | 2026-02-05 | General construction | 900 GRESHAM ROAD | Structural and foundation work as shown on drawings filed herewith. | $0 |
| M01310540-I1-MS | 2026-02-04 | Mechanical / HVAC | 1120 AMSTERDAM AVENUE | Demolition of existing ductwork, HW piping, FTR, Fans, Heat exchangers and pumps serving CU Hartley Hall as per plans filed herewith. No change of use, occupancy or egress. | $252,540 |
| M01227502-S2-MS | 2025-12-01 | Mechanical / HVAC | 424 EAST 34 STREET | HEREWITH FILING FOR MECHANICAL MODIFICATION AS PER PLANS FOR ED EXPANSION. NO CHANGE IN USE, EGRESS OROCCUPANCY. | $9,225,238 |
| M01198804-I1-GC | 2025-12-01 | General construction | 523 EAST 70 STREET | Annex Electrical Upgrade; remove existing stair and catwalk and replace with new metal pan stair in the same location; partitions and finishes to accommodate electrical upgrade in | $1,422,000 |
| M01198804-S1-MS | 2025-12-01 | Mechanical / HVAC | 523 EAST 70 STREET | ANNEX ESR: MODIFICATION TO HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATION WITHIN THE EXISTING HOSPITAL POWER BUILDING AS PER PLANS. NO CHANGE TO UES, EGRESS OR OCCUPANCY | $1,080,000 |
| B01307194-I1-GC | 2025-11-17 | General construction | 632 SECOND AVENUE | INSTALLATION TEMPORARY FIELD OFFICE TRAILERS WITH SUPPORT FOR THE SOUTH BROOKLYN MARINE TERMINAL WIND FARMS PER PLANS. NO CHANGE TO USE,EGRESS OR OCCUPANCY. Under MPP# 297 | $1,035,186 |
| M01268438-I1-GC | 2025-11-06 | General construction | 1120 AMSTERDAM AVENUE | Selective demolition of interior finishes and partitions within an unoccupied college dormitory. No modifications to underlying structural slabs/bearing walls, nor changes to use, | $616,757 |
| B01173607-I1-MS | 2025-10-24 | Mechanical / HVAC | 150 55 STREET | NYU - 150 55TH STREET LIGHTWELL MECHANICAL ENABLING - RELOCATION OF EXISTING MECHANICAL EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,041,292 |
| B01173601-I1-MS | 2025-10-24 | Mechanical / HVAC | 150 55 STREET | 150 55TH STREET - LIGHTWELL - MECHANCIAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $3,299,045 |
| B01152884-I1-GC | 2025-10-20 | General construction | 150 55 STREET | 150 55TH STREET - LIGHTWELL PROJECT - MODIFICATIONS OF PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE IN USE, EGRE | $1,581,362 |
| M01190490-S3-MS | 2025-10-17 | Mechanical / HVAC | 900 GRESHAM ROAD | New mechanical as shown on drawings filed herewith. | $0 |
| M01190490-I1-GC | 2025-10-10 | General construction | 900 GRESHAM ROAD | New electrical substation utility building. | $0 |
| M01217198-I1-GC | 2025-10-09 | General construction | 1470 MADISON AVENUE | Herewith filing general construction modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy. | $950,000 |
| M01217198-S1-MS | 2025-10-09 | Mechanical / HVAC | 1470 MADISON AVENUE | Herewith filing mechanical modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy. | $1,650,000 |
| B01102988-I1-GC | 2025-09-19 | General construction | 150 55 STREET | 150 55TH STREET - GENERATOR PROJECT - GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,581,362 |
| B01258071-I1-GC | 2025-09-17 | General construction | 186 JORALEMON STREET | Install a new stair from cellar to 1st floor in the existing building. | $100,000 |
| M01230926-S1-GC | 2025-08-18 | General construction | 333 OWASCO ROAD | Temporary cooling shelter as per plans herewith. | $50,000 |
| B01102988-S1-MS | 2025-05-14 | Mechanical / HVAC | 150 55 STREET | 150 55TH STREET - GENERATOR PROJECT - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY. | $1,290,642 |
| M01167036-S1-MS | 2025-04-02 | Mechanical / HVAC | 170 WILLIAM STREET | LMH OB 5 FL: MODIFICAITON OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $300,000 |
| M01167036-I1-GC | 2025-04-02 | General construction | 170 WILLIAM STREET | LMH OB 5fl: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $2,000,000 |
| M01170140-I1-GC | 2025-03-13 | General construction | 170 WILLIAM STREET | LMH OB 6C: MODIFICATION OF CEILINGS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $200,000 |
| M01170410-I1-GC | 2025-02-26 | General construction | 541 EAST 68 STREET | GP3 OR5 OR 8: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE OR5 & OR8 ROBOTIC UPGRADES, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZO | $1,000,000 |
| M01148800-I1-GC | 2025-02-24 | General construction | 660 FIRST AVENUE | INTERIOR PARTITIONS AND CEILING MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $7,800,000 |
| M01148800-S1-MS | 2025-02-24 | Mechanical / HVAC | 660 FIRST AVENUE | HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON 6TH, 7TH AND ROOF FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,300,000 |
| M01170421-I1-MS | 2025-02-20 | Mechanical / HVAC | 541 EAST 68 STREET | GP3 OR5 OR 8: DUCTWORK AND PIPING MODIFICATIONS TO ACCOMMODATE THE OR5 & OR8 ROBOTIC UPGRADES, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRE | $220,000 |
| B01118200-I1-GC | 2025-02-19 | General construction | 150 55 STREET | 150 55TH STREET - GENERATOR PROJECT - DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $727,173 |
| B00856273-I1-GC | 2025-02-05 | General construction | 186 JORALEMON STREET | Interior demolition on cellar - 1st fls; new 1st floor slab; facade repair to for duct support connections; roof replacement and replacement of exterior metal stair and catwalk for | $1,000,000 |
| B00856454-I1-MS | 2025-02-03 | Mechanical / HVAC | 186 JORALEMON STREET | Mechanical infrastructure to accommodate medical office space on cellar and 1st floor including new rooftop mechanical equipment, new vent piping and ductwork on the exterior facad | $1,500,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →