COMPANY RECORD · NEW YORK, NY
Skanska USA Building, Inc — permit history in New York, NY
Skanska USA Building, Inc appears on 115 New York permit records from 2020 through 2026, most often general construction (56.5% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 025623 | 115 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | SKANSKA USA BUILDING, INC |
|---|---|
| Business address on file | 350 5TH AVENUE, 37TH FL NEW YORK NY 10118 |
| Business phone on file | (917) 438-4500 |
| Licence number | 25623 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Skanska USA Building, Inc by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 65 | 56.5% |
| Mechanical / HVAC | 50 | 43.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 4 |
| 2021 | 20 |
| 2022 | 15 |
| 2023 | 8 |
| 2024 | 14 |
| 2025 | 27 |
| 2026 | 27 |
Busiest year on record: 2025, with 27 permits. One project can account for several filings, so read this as filing activity rather than workload.
PROJECTS AHEAD SEARCH
Search every New York permit, not only this company's
This page is a snapshot of Skanska USA Building, Inc. The search behind it holds more than 352,308 New York permits naming a contractor, since 2019: 151,351 building permits, 117,270 plumbing permits, 72,431 mechanical (HVAC) permits, 43,000 fire protection permits.
- Search the full history by company, address, permit type or date range.
- Set an alert and get an email when a new permit matches — the next permit Skanska USA Building, Inc files, or any new building permit in New York. A new permit is an early signal of work to bid on, supply or finance.
- Export to CSV for your CRM or spreadsheet.
Free account: newest 7 days of records, 10 searches a day and 1 daily alert. Full history, CSV export and instant alerts on paid plans from $49 a month ($24.50 for the first 3 months). Compare plans
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Rael Automatic Spr.Co Inc | 11 | 2026-09-21 |
| Sirina Fire Prot Corp | 6 | 2026-06-25 |
| Riehm Plumbing Corp | 6 | 2026-09-08 |
| Olympic Plbg & Htg Svc In | 6 | 2026-09-08 |
| Par Plumbing Co., Inc | 3 | 2026-09-17 |
| Aspro Plumbing Inc | 2 | 2024-06-26 |
| Louis L.Buttermark & Sons | 2 | 2022-03-15 |
| Par Fire Protection LLC | 2 | 2026-07-31 |
| Bancker Plumbing Corp | 1 | 2024-04-10 |
| Lemode Plbg & Htg Corp | 1 | 2025-06-06 |
| J.M. Botto Inc | 1 | 2025-06-16 |
| Cardoza Plumbing Corp | 1 | 2025-11-06 |
13 companies are named alongside Skanska USA Building, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1120 AMSTERDAM AVENUE | 2026-09-24 |
| 148 39 STREET | 2026-09-01 |
| 424 EAST 34 STREET | 2026-08-27 |
| 55-90 48 STREET | 2026-08-18 |
| 150 55 STREET | 2026-08-04 |
| 562 FIRST AVENUE | 2026-07-30 |
| 981 8 AVENUE | 2026-07-15 |
| 170 WILLIAM STREET | 2026-06-26 |
| 603 WEST 218 STREET | 2026-05-27 |
| 20 WEST 137 STREET | 2026-04-03 |
| 900 GRESHAM ROAD | 2026-03-03 |
| 523 EAST 70 STREET | 2025-12-01 |
| 632 SECOND AVENUE | 2025-11-17 |
| 1470 MADISON AVENUE | 2025-10-09 |
36 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $13,071,039, median $300,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Cardoza Plumbing Corp | 10 | 2020–2026 |
| Current Fire Protection I | 10 | 2019–2026 |
| Rael Automatic Spr.Co Inc | 8 | 2021–2026 |
| Empire General Contractin | 8 | 2020–2026 |
| Sirina Fire Prot Corp | 8 | 2019–2026 |
| Olympic Plbg & Htg Svc In | 7 | 2019–2026 |
| Par Plumbing Co., Inc | 4 | 2019–2026 |
| Riehm Plumbing Corp | 4 | 2019–2026 |
Companies that also appear in New York permit records at addresses where Skanska USA Building, Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
115 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01264739-S3-MS | 2026-09-24 | Mechanical / HVAC | 1120 AMSTERDAM AVENUE | Modifications to mechanical systems as per plans filed herewith. No change to use, occupancy or egress. | $11,767,122 |
| B01425247-I1-MS | 2026-09-01 | Mechanical / HVAC | 148 39 STREET | demolition of existing ductwork distribution&associated components&steam radiators. Existing AHU to be reused w/new ductwork distribution to align w new layout&new steam radiators. | $924,089 |
| B01425245-I1-GC | 2026-09-01 | General construction | 148 39 STREET | Renovation of existing business occupancy into medical office space, including 15 exam rooms, waiting area associated support spaces. No change to use, egress or occupancy | $3,374,393 |
| M01252914-S1-MS | 2026-08-27 | Mechanical / HVAC | 424 EAST 34 STREET | HEREWITH FILING FOR MODIFICATION OF MECHANICAL DUCTWORK FOR THE PRE/POST OP ROOMS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $231,920 |
| M01252914-I1-GC | 2026-08-27 | General construction | 424 EAST 34 STREET | Herewith filing for interior modification of prepost rooms as per plans. no change in use, egress or occupancy. | $311,400 |
| Q01418522-I1-MS | 2026-08-18 | Mechanical / HVAC | 55-90 48 STREET | Filing mechanical plans to update AC unit installed and mistakenly omitted from previous filing Q00538865-S1 and obtain COC's. No change in egress, use, or occupancy. | $1,000 |
| M01252904-I1-GC | 2026-08-11 | General construction | 424 EAST 34 STREET | Herewith filing for interior renovations on the ground floor of MER Storage rooms as per plans. No change in use, egress or occupancy. | $112,856 |
| M01252904-S1-MS | 2026-08-11 | Mechanical / HVAC | 424 EAST 34 STREET | HEREWITH FILING FOR MODIFICATION OF MECHANICAL DUCTWORK AND RELATED SYSTEMS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $70,500 |
| B01270357-S1-MS | 2026-08-04 | Mechanical / HVAC | 150 55 STREET | NYULH BROOKLYN - 3500 ONCOLOGY BEDS - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $3,000,000 |
| M01391832-I1-GC | 2026-07-30 | General construction | 424 EAST 34 STREET | KIMMEL INTERIOR RENOVATION GROUND AND FIRST FLOORS - GENERAL CONSTRUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $40,000 |
| M01392196-I1-GC | 2026-07-30 | General construction | 562 FIRST AVENUE | TISCH DECANT CELLAR FLOOR INTERIOR RENOVATION - GENERAL CONSTRUCTION MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $35,000 |
| B01270357-I1-GC | 2026-07-29 | General construction | 150 55 STREET | NYULH BROOKLYN - 3500 ONCOLOGY BEDS - GENERAL CONSTRUCTION INCLUDING MODIFICATIONS TO EXISTING FLOORS, PARTITIONS, CEILINGS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, | $1,000,000 |
| M01413855-I1-GC | 2026-07-15 | General construction | 981 8 AVENUE | NYU LANGONE - 981 8TH AVENUE OFFICE FIT-OUTS - EARLY INTERIOR DEMOLITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $180,000 |
| M01350659-I1-GC | 2026-06-26 | General construction | 170 WILLIAM STREET | LMH OB 6fl: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,100,000 |
| M01350659-S1-MS | 2026-06-26 | Mechanical / HVAC | 170 WILLIAM STREET | LMH OB 6FL: MODIFICATION OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING. | $800,000 |
| M01264739-I1-GC | 2026-06-01 | General construction | 1120 AMSTERDAM AVENUE | Renovation/Conversion of dorm suites to fully accessible single/double occupant sleeping rooms, proposed turnstiles and modifications to office/conference/lounge rooms as per plans | $13,071,039 |
| M01393880-I1-GC | 2026-05-27 | General construction | 603 WEST 218 STREET | Resurfacing and repairs of tennis courts as per plans filed. No change in use, egress or occupancy. | $150,000 |
| M01310514-I1-GC | 2026-04-13 | General construction | 1120 AMSTERDAM AVENUE | Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Progr | $807,505 |
| M01324471-I1-GC | 2026-04-03 | General construction | 20 WEST 137 STREET | G HEREWITH FOR INSTALLATION OF PERMANENT CHAINLINK FENCE TO PROTECT VACANT LOT AS REQUIRED BY THE NYC CHARTER SECTION 2904. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $144,000 |
| M01190490-S6-MS | 2026-03-03 | Mechanical / HVAC | 900 GRESHAM ROAD | Sub-slab depressurization system as shown on drawings filed herewith. | $0 |
| M01258232-I1-GC | 2026-02-11 | General construction | 424 EAST 34 STREET | Removal of of existing landscape area, granite curb, stone wall, and bollards and Installation of new landscaping, concrete egress area, additional detention to handle new impervio | $2,000,000 |
| M01345361-I1-GC | 2026-02-11 | General construction | 170 WILLIAM STREET | LMH OB 5fl: MODIFICATION OF INTERIOR AND EXTERIOR WALLS AND WINDOWS TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUP | $200,000 |
| M01227502-I1-GC | 2026-02-06 | General construction | 424 EAST 34 STREET | HUB consultation meeting held 6/6/25. Herewith filing for parking garage removal for Emergency Dept expansion as per plans. | $8,032,100 |
| M01190490-S4-ST | 2026-02-05 | General construction | 900 GRESHAM ROAD | Structural and foundation work as shown on drawings filed herewith. | $0 |
| M01190490-S4-GC | 2026-02-05 | General construction | 900 GRESHAM ROAD | Structural and foundation work as shown on drawings filed herewith. | $0 |
| M01190490-S4-FO | 2026-02-05 | General construction | 900 GRESHAM ROAD | Structural and foundation work as shown on drawings filed herewith. | $0 |
| M01310540-I1-MS | 2026-02-04 | Mechanical / HVAC | 1120 AMSTERDAM AVENUE | Demolition of existing ductwork, HW piping, FTR, Fans, Heat exchangers and pumps serving CU Hartley Hall as per plans filed herewith. No change of use, occupancy or egress. | $252,540 |
| M01198804-I1-GC | 2025-12-01 | General construction | 523 EAST 70 STREET | Annex Electrical Upgrade; remove existing stair and catwalk and replace with new metal pan stair in the same location; partitions and finishes to accommodate electrical upgrade in | $1,422,000 |
| M01227502-S2-MS | 2025-12-01 | Mechanical / HVAC | 424 EAST 34 STREET | HEREWITH FILING FOR MECHANICAL MODIFICATION AS PER PLANS FOR ED EXPANSION. NO CHANGE IN USE, EGRESS OROCCUPANCY. | $9,225,238 |
| M01198804-S1-MS | 2025-12-01 | Mechanical / HVAC | 523 EAST 70 STREET | ANNEX ESR: MODIFICATION TO HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATION WITHIN THE EXISTING HOSPITAL POWER BUILDING AS PER PLANS. NO CHANGE TO UES, EGRESS OR OCCUPANCY | $1,080,000 |
| B01307194-I1-GC | 2025-11-17 | General construction | 632 SECOND AVENUE | INSTALLATION TEMPORARY FIELD OFFICE TRAILERS WITH SUPPORT FOR THE SOUTH BROOKLYN MARINE TERMINAL WIND FARMS PER PLANS. NO CHANGE TO USE,EGRESS OR OCCUPANCY. Under MPP# 297 | $1,035,186 |
| M01268438-I1-GC | 2025-11-06 | General construction | 1120 AMSTERDAM AVENUE | Selective demolition of interior finishes and partitions within an unoccupied college dormitory. No modifications to underlying structural slabs/bearing walls, nor changes to use, | $616,757 |
| B01173601-I1-MS | 2025-10-24 | Mechanical / HVAC | 150 55 STREET | 150 55TH STREET - LIGHTWELL - MECHANCIAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $3,299,045 |
| B01173607-I1-MS | 2025-10-24 | Mechanical / HVAC | 150 55 STREET | NYU - 150 55TH STREET LIGHTWELL MECHANICAL ENABLING - RELOCATION OF EXISTING MECHANICAL EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,041,292 |
| B01152884-I1-GC | 2025-10-20 | General construction | 150 55 STREET | 150 55TH STREET - LIGHTWELL PROJECT - MODIFICATIONS OF PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE IN USE, EGRE | $1,581,362 |
| M01190490-S3-MS | 2025-10-17 | Mechanical / HVAC | 900 GRESHAM ROAD | New mechanical as shown on drawings filed herewith. | $0 |
| M01190490-I1-GC | 2025-10-10 | General construction | 900 GRESHAM ROAD | New electrical substation utility building. | $0 |
| M01217198-S1-MS | 2025-10-09 | Mechanical / HVAC | 1470 MADISON AVENUE | Herewith filing mechanical modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy. | $1,650,000 |
| M01217198-I1-GC | 2025-10-09 | General construction | 1470 MADISON AVENUE | Herewith filing general construction modifications for Mount Sinai Hess MR-LINAC Phase II Project. No change in use, egress, or occupancy. | $950,000 |
| B01102988-I1-GC | 2025-09-19 | General construction | 150 55 STREET | 150 55TH STREET - GENERATOR PROJECT - GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,581,362 |
| B01258071-I1-GC | 2025-09-17 | General construction | 186 JORALEMON STREET | Install a new stair from cellar to 1st floor in the existing building. | $100,000 |
| M01230926-S1-GC | 2025-08-18 | General construction | 333 OWASCO ROAD | Temporary cooling shelter as per plans herewith. | $50,000 |
| B01102988-S1-MS | 2025-05-14 | Mechanical / HVAC | 150 55 STREET | 150 55TH STREET - GENERATOR PROJECT - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY. | $1,290,642 |
| M01167036-I1-GC | 2025-04-02 | General construction | 170 WILLIAM STREET | LMH OB 5fl: MODIFICATION OF INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $2,000,000 |
| M01167036-S1-MS | 2025-04-02 | Mechanical / HVAC | 170 WILLIAM STREET | LMH OB 5 FL: MODIFICAITON OF HVAC EQUIPMENT AND DUCTWORK TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $300,000 |
| M01170140-I1-GC | 2025-03-13 | General construction | 170 WILLIAM STREET | LMH OB 6C: MODIFICATION OF CEILINGS AND FINISHES TO ACCOMMODATE ALTERATIONS WITHIN THE EXISTING HOSPITAL BUILDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $200,000 |
| M01170410-I1-GC | 2025-02-26 | General construction | 541 EAST 68 STREET | GP3 OR5 OR 8: MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE OR5 & OR8 ROBOTIC UPGRADES, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZO | $1,000,000 |
| M01148800-S1-MS | 2025-02-24 | Mechanical / HVAC | 660 FIRST AVENUE | HEREWITH FILING FOR MECHANICAL MODIFICATIONS ON 6TH, 7TH AND ROOF FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $5,300,000 |
| M01148800-I1-GC | 2025-02-24 | General construction | 660 FIRST AVENUE | INTERIOR PARTITIONS AND CEILING MODIFICATIONS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $7,800,000 |
| M01170421-I1-MS | 2025-02-20 | Mechanical / HVAC | 541 EAST 68 STREET | GP3 OR5 OR 8: DUCTWORK AND PIPING MODIFICATIONS TO ACCOMMODATE THE OR5 & OR8 ROBOTIC UPGRADES, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRE | $220,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
