COMPANY RECORD · NEW YORK, NY

Sentinel Builders, LLC — permit history in New York, NY

Sentinel Builders, LLC appears on 54 New York permit records from 2019 through 2026, most often general construction (59.3% of the record).

Permit categories

CategoryPermitsShare
General construction3259.3%
Mechanical / HVAC2240.7%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20191
20202
20214
202212
20236
202415
20256
20268

Busiest year on record: 2024, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Advanced Plbg LLC22026-05-14
Advanced Plumbing LLC22026-05-14
Allstate Sprinkler LLC12025-07-29
Demar Mechanical Inc12026-07-13
Donato Plumbing, Inc12024-11-14
Dualcore Construction Mgt12025-03-12
F.S. Works Inc12025-07-02
Water Dynamic P & H Corp12026-01-20

8 companies are named alongside Sentinel Builders, LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
20 WEST 74 STREET2026-06-29
159-19 HORACE HARDING EXPRESSWAY2026-05-08
645 MADISON AVENUE2026-04-29
37-12 108 STREET2026-02-20
1844 SECOND AVENUE2026-02-18
35 EAST 9 STREET2026-01-02
211 EAST 43 STREET2025-12-04
761 MADISON AVENUE2025-07-21
149 2 AVENUE2025-04-21
157 2 AVENUE2025-04-18
693 5 AVENUE2024-11-22
408 EAST 82 STREET2024-10-21
156 2 AVENUE2024-10-16
47 EAST 7 STREET2024-07-02

30 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $1,524,180, median $102,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

54 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01397522-S3-MS2026-06-29Mechanical / HVAC20 WEST 74 STREETThe William Alanson White Institute limited Mechanical systems, restroom exhaust work in conjunction with interior general construction renovations at 4th & 5th floors as per plan $27,000
M01397522-I1-GC2026-06-29General construction20 WEST 74 STREETThe William Alanson White Institute limited interior general construction renovations at 4th & 5th floors as per plan filed herewith. No change to use, egress or occupancy under th$64,000
Q01016787-I1-GC2026-05-08General construction159-19 HORACE HARDING EXPRESSWAYPROJECT IS A GUT RENOVATION OF A TWO STORY PLUS CELLAR TYPE III-B MASONRY BUILDING INCLUDING CHANGE OF USE. CURRENTLY TWO UNOCCUPIED DWELLING UNITS EXIST. ONE WILL REMAIN. CHANGE O$1,080,000
M01385453-I1-GC2026-04-29General construction645 MADISON AVENUEAPPLICATION FILED HEREWITH FOR INTERIOR RENOVATIONS for office build out as per plans filed herewith.$700,000
M01361488-I1-GC2026-03-02General construction645 MADISON AVENUEAPPLICATION FILED HEREWITH FOR INTERIOR REMOVALS ON THE 16TH FLOOR OF A 22 STORY BUILDING. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION$80,000
Q00875742-S2-MS2026-02-20Mechanical / HVAC37-12 108 STREETFurnish and Install mechnical system$455,000
M01295879-I1-GC2026-02-18General construction1844 SECOND AVENUEFiing herewith for the interior renovation for the removal and construction of non load bearing partitions and finishes as per plans. There is no change to use, egress, and occupan$82,317
M01318748-I1-GC2026-01-02General construction35 EAST 9 STREETINTERIOR RENOVATION TO EXISTING APARTMENT 61 DWELLING UNIT, NO CHANGE IN USE EGRESS OR OCCUPANCY.$80,000
M01316503-I1-MS2025-12-04Mechanical / HVAC211 EAST 43 STREETdirect replacement of condenser unit on 3rd and 17th floor. no additional works$130,000
M01237386-S1-MS2025-07-21Mechanical / HVAC761 MADISON AVENUEMechanical work as shown on plans.$12,000
M01237386-I1-GC2025-07-11General construction761 MADISON AVENUEGeneral construction work as shown on plans.$180,000
M01131965-S1-MS2025-04-21Mechanical / HVAC149 2 AVENUEMECHANICAL WORK IN CONJUNTION WITH APARTMENTS RENOVATION AND AT 1ST FLOOR RETAIL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$80,000
M01077026-S3-MS2025-04-18Mechanical / HVAC157 2 AVENUEMechanical work in conjunction with apartments renovation. No change to use egress or occupancy.$80,000
M01141930-I1-GC2025-01-31General construction157 2 AVENUECONVERT 1ST FL COMMERCIAL SPACE TO (1) DWELLING UNIT.$115,200
M01124308-I1-MS2024-11-22Mechanical / HVAC693 5 AVENUEModify Existing Air Conditioning, Outside Air & Toilet Exhaust Ductwork and Existing Mechanical Piping, Install VAV Boxes, Manual Dampers, Supply, Return & Exhaust Air Diffusers & $50,000
M00871627-I1-MS2024-10-21Mechanical / HVAC408 EAST 82 STREETFILING HEREWITH FOR MH WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$50,000
M00868118-I1-GC2024-10-21General construction408 EAST 82 STREETFILING HEREWITH FOR GC WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$150,000
M01091294-I1-GC2024-10-16General construction156 2 AVENUEWORK TO APTS 2A,2B,2D,2E,2F,3A,3B,3C,3D,3E,3F,4B,4C,4E,4F,5A,5B,5C,5D,5E,5F,6B,6D,6E&6F AND STAIR HALL IN EXST. BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE TO $1,524,180
M01091740-I1-GC2024-09-13General construction693 5 AVENUEInstallation of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes, Pantry and Unisex Accessible Restrooms on 6th Floor. No Change to Occupancy, Use or Egress is$350,000
M01059327-I1-GC2024-07-02General construction47 EAST 7 STREETRENOVATION OF 4TH FLOOR APARTMENT C4. NO CHANGE IN USE, BULK, OR EGRESS.$92,385
M01059308-I1-GC2024-07-02General construction47 EAST 7 STREETRENOVATION OF FIFTH FLOOR APARTMENT D3. NO CHANGE IN USE, BULK, OR EGRESS.$107,080
M00988200-I1-GC2024-07-02General construction211 EAST 43 STREETFiling herewith interior demotion and renovation to the 11th FL. as per plans filed herewith. No change to use, egress or occupancy.$163,461
M01028404-I1-MS2024-07-02Mechanical / HVAC211 EAST 43 STREETFiling herewith mechanical work on the 18th FL. as per plans filed herewith. No change to use, egress or occupancy.$11,750
M01028401-I1-GC2024-07-02General construction211 EAST 43 STREETFiling herewith interior renovation to the 18th FL. as per plans filed herewith. No change to use, egress or occupancy.$21,685
M00988204-I1-MS2024-07-02Mechanical / HVAC211 EAST 43 STREETFiling herewith mechanical work on the 11th FL. as per plans filed herewith. No change to use, egress or occupancy.$31,740
M00868123-I1-GC2024-06-21General construction408 EAST 82 STREETCHANGE OF USE ON FLOORS CELLAR, 1, MEZANNINE, AND 4.$104,000
M08038370-I1-GC2024-05-29General construction9 WHITE STREETRENOVATION OF APTS 2 & 3 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,060,000
M00876672-I1-MS2024-05-28Mechanical / HVAC9 WHITE STREETMECHANICAL MODIFICATION ON 2ND & 3RD FLOOR APTS 2 & 3 AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$100,000
M00926153-S2-MS2024-01-17Mechanical / HVAC414 WEST BROADWAYMECHANICAL WORK IN CONJUNCTION WITH APT RENOVATION.$50,000
Q00875742-I1-GC2023-11-28General construction37-12 108 STREETInterior Work$805,800
M00883914-I1-MS2023-06-23Mechanical / HVAC121 EAST 55 STREETRESPECTFULLY FILING HEREWITH FOR MH WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$90,000
M00880347-I1-GC2023-06-14General construction121 EAST 55 STREETRESPECTFULLY FILING HEREWITH FOR GC WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.$400,000
M08048639-I1-GC2023-06-10General construction414 WEST 14 STREETHerewith filing buildout of Building Managers Office (Accessory Use) at Cellar Level. No Change in Use, Egress or Occupancy Proposed.$112,000
M08048745-I1-MS2023-06-08Mechanical / HVAC414 WEST 14 STREETHerewith Filing Modifications to existing Mechanical system in conjunction with build-out of accessory building superintendents office at cellar. No change in use, egress or occupa$34,000
M00827214-I1-GC2023-04-05General construction1844 2 AVENUEFiling herewith drawings indicating Interior renovation on 1st Floor (Lobby). No change in use, egress or occupancy.$624,720
M08042618-I1-MS2022-12-21Mechanical / HVAC211 EAST 43 STREETMODIFICATION TO AN EXISTING MECHANICAL SYSTEM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$1,980
M08042478-I1-GC2022-12-21General construction211 EAST 43 STREETINTERIOR DEMO RENOVATION TO THE 11TH FLOOR. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.$10,000
M00740104-I1-ST2022-11-28General construction502 LA GUARDIA PLACEWORK TO A 5 STORY, 4 FAMILY MIXED USE BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITIONS WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS AND OCCUPANCY UNDER THIS $526,300
M00740104-I1-GC2022-11-22General construction502 LA GUARDIA PLACEWORK TO A 5 STORY, 4 FAMILY MIXED USE BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITIONS WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS AND OCCUPANCY UNDER THIS $526,300
M00738372-I1-GC2022-11-18General construction504 LA GUARDIA PLACEWORK TO A 5 STORY, 4 FAMILY MIXED USE BUILDING. ALTERATION TO CONSIST OF INTERIOR PARTITIONS WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE EGRESS AND OCCUPANCY UNDER THIS A$561,100
M00589616-I1-MS2022-09-08Mechanical / HVAC211 EAST 43 STREETMODIFICATION TO AN EXISTING MECHANICAL SYSTEM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$24,000
M00665349-I1-MS2022-09-06Mechanical / HVAC211 EAST 43 STREETModifications to existing mechanical systems as per plans. No change in use, egress or occupancy.$1,520
B00781921-I1-GC2022-08-31General construction66 CRANBERRY STREETREMOVAL OF PATIO COVER/ CANOPY AT EXISTING REAR YARD TO RESOLVE VIOLATION$2,000
X00576064-I1-GC2022-08-16General construction441 EAST FORDHAM ROADRENOVATION OF FOUR EXISTING ANCILLARY STRUCTURES (SECURITY BOOTHS) LOCATED IN ROSE HILL CAMPUS, FORDHAM UNIVERSITY. NO CHANGES TO EXISTING STRUCTURES, USE, OR EGRESS.$260,000
M00589579-I1-GC2022-06-21General construction211 EAST 43 STREET2ND FLOOR SELECTIVE DEMOLITION OF CEILINGS, DEMOLITION OF LOW WALL AT PANTRY. CONSTRUCTION OF NEW ACT CEILINGS, NEW LIGHTING & FINISHES NO CHANGE OF USE, EGRESS OR OCCUPANCY.$69,500
M00665152-I1-GC2022-06-16General construction211 EAST 43 STREETCONSTRUCTION OF NEW PARTITIONS, DOORS, CEILINGS, FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$3,040
X00553114-I1-GC2022-03-04General construction655 EAST FORDHAM ROADApplication is filed for the interior renovation of Room 131 at the FMH. No change of use, egress or occupancy.$1,000,000
X00524902-I1-GC2021-09-16General construction447 EAST FORDHAM ROADFACADE REPAIRS IN RESPONSE TO ECB VIOLATION# 39030422K FAILURE TO MAINTAIN THE FACADE. REPAIRS INCLUDE CORNICE REPAIR, STONE REPLACEMENT, MISCELLANEOUS STONE & BRICK REPAIRS.$145,000
M00279049-I1-MS2021-08-12Mechanical / HVAC233 SPRING STREETFiling herewith no work mechanical filing with new revised mechanical schedule in conjunction with signed-off application #122118378 to address FDNY violation #11707029J and secure$1,000
M00477461-I1-GC2021-05-20General construction340 EAST 54 STREETrevise job cost and add roof$780,459

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →