COMPANY RECORD · NEW YORK, NY
Record Group Inc — permit history in New York, NY
Record Group Inc appears on 42 New York permit records from 2022 through 2026, most often general construction (75% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 42 | 75% |
| Mechanical / HVAC | 14 | 25% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 4 |
| 2023 | 5 |
| 2024 | 7 |
| 2025 | 24 |
| 2026 | 16 |
Busiest year on record: 2025, with 24 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Impact Builders Corp | 8 | 2026-04-15 |
| Four Points P & H Corp | 5 | 2026-03-02 |
| Renew Plumbing Corp | 4 | 2026-07-31 |
| All Pro Plbg & Htg Inc | 2 | 2026-01-28 |
| Amok Inc | 2 | 2025-09-11 |
| J. Caiazzo Plbg & Htg Cor | 2 | 2025-03-12 |
| W.R. Plbg And Htg Corp | 2 | 2023-06-07 |
| Charles J. Dehart Jr P&H | 1 | 2026-06-01 |
| Cn Plumbing Inc | 1 | 2025-08-13 |
| Jem Fire Prevention Inc | 1 | 2024-02-21 |
| Kishan Plumbing Inc | 1 | 2024-01-25 |
| Plumb-It Mechanical Inc | 1 | 2025-10-03 |
15 companies are named alongside Record Group Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 67-57 173 STREET | 2026-08-28 |
| 138-61 102 AVENUE | 2026-07-29 |
| 85-60 WICKLOW PLACE | 2026-06-29 |
| 85-56 WICKLOW PLACE | 2026-06-26 |
| 147-08 228 STREET | 2026-06-23 |
| 3351 3 AVENUE | 2026-06-09 |
| 230-42 57 ROAD | 2026-05-27 |
| 553 MORGAN AVENUE | 2026-04-07 |
| 22-12 43 STREET | 2026-03-23 |
| 80-10 192 STREET | 2026-02-10 |
| 179-31 TUDOR ROAD | 2025-12-23 |
| 143-20 182 PLACE | 2025-11-03 |
| 109-80 GAR VAN WYCK EXPRESSWAY | 2025-10-29 |
| 75-35 185 STREET | 2025-09-11 |
41 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $2,048,305, median $338,710. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
42 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01343127-I1-GC | 2026-08-28 | General construction | 67-57 173 STREET | HEREWITH FILING A NEW BUILDING APPLICATION IN ORDER TO CONSTRUCT PROPOSED 2 STORY 2 (TWO) DWELLING UNIT RESIDENTIAL BUILDING WITH PARKING AT GROUND FLOOR OSP FOR TWO SPOTS, AND OB | $0 |
| Q01264617-I1-GC-CX | 2026-07-29 | General construction | 138-61 102 AVENUE | HEREWITH FILING ALTERATION TYPE ONE IN ORDER TO DO HORIZONTAL AND VERTICAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING AND CONVERT TO A TWO FAMILY DWELLING. TO ERECT INTERIOR PA | $765,000 |
| Q01264617-I1-GC-CX | 2026-07-29 | Mechanical / HVAC | 138-61 102 AVENUE | HEREWITH FILING ALTERATION TYPE ONE IN ORDER TO DO HORIZONTAL AND VERTICAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING AND CONVERT TO A TWO FAMILY DWELLING. TO ERECT INTERIOR PA | $765,000 |
| Q01015747-I1-GC-CX | 2026-06-29 | General construction | 85-60 WICKLOW PLACE | HEREWITH FILING NEW BUILDING IN ORDER TO DO A HORIZONTAL AND VERTICAL ERECT 3 STORY 1 FAMILY DWELLING.TO ERECT INTERIOR PARTITIONS,DO MECHANICAL WORK AND OBTAIN NEW C/O. PL AND STR | $0 |
| Q01015747-I1-GC-CX | 2026-06-29 | Mechanical / HVAC | 85-60 WICKLOW PLACE | HEREWITH FILING NEW BUILDING IN ORDER TO DO A HORIZONTAL AND VERTICAL ERECT 3 STORY 1 FAMILY DWELLING.TO ERECT INTERIOR PARTITIONS,DO MECHANICAL WORK AND OBTAIN NEW C/O. PL AND STR | $0 |
| Q01027046-I1-GC-CX | 2026-06-26 | General construction | 85-56 WICKLOW PLACE | HEREWITH FILING NEW BUILDING IN ORDER TO DO A HORIZONTAL AND VERTICAL ERECT 3 STORY 1 FAMILY DWELLING.TO ERECT INTERIOR PARTITIONS,DO MECHANICAL WORK AND OBTAIN NEW C/O. PL AND STR | $0 |
| Q01027046-I1-GC-CX | 2026-06-26 | Mechanical / HVAC | 85-56 WICKLOW PLACE | HEREWITH FILING NEW BUILDING IN ORDER TO DO A HORIZONTAL AND VERTICAL ERECT 3 STORY 1 FAMILY DWELLING.TO ERECT INTERIOR PARTITIONS,DO MECHANICAL WORK AND OBTAIN NEW C/O. PL AND STR | $0 |
| Q01216604-I1-GC-CX | 2026-06-23 | General construction | 147-08 228 STREET | Existing one story, one family dwelling unit to be vertically enlarged, converted into a two family dwelling units , and fully renovated . New drywalls partitions and plumbing fixt | $506,044 |
| X01253665-I1-GC-CX | 2026-06-09 | Mechanical / HVAC | 3351 3 AVENUE | THREE STORY WITH CELLAR, MIXED USE BUILDING | $0 |
| X01253665-I1-GC-CX | 2026-06-09 | General construction | 3351 3 AVENUE | THREE STORY WITH CELLAR, MIXED USE BUILDING | $0 |
| Q01362537-I1-GC-CX | 2026-05-27 | Mechanical / HVAC | 230-42 57 ROAD | INTERIOR GUT REHAB OF EXISTING BUILDING 1-STORY AND CELLAR , VERTICAL ENLARGEMENT TO ADD NEW 2ND FLOOR AND ATTIC SPACE AND NEW ROOF , NEW BRICK FAADE ALL AROUND. | $798,000 |
| Q01362537-I1-GC-CX | 2026-05-27 | General construction | 230-42 57 ROAD | INTERIOR GUT REHAB OF EXISTING BUILDING 1-STORY AND CELLAR , VERTICAL ENLARGEMENT TO ADD NEW 2ND FLOOR AND ATTIC SPACE AND NEW ROOF , NEW BRICK FAADE ALL AROUND. | $798,000 |
| B01362934-I1-GC-CX | 2026-04-07 | Mechanical / HVAC | 553 MORGAN AVENUE | Application is filed for the interior renovation of an existing 3-story with cellar, 3-family residence. No change in use, egress or occupancy filed under this application. | $617,700 |
| B01362934-I1-GC-CX | 2026-04-07 | General construction | 553 MORGAN AVENUE | Application is filed for the interior renovation of an existing 3-story with cellar, 3-family residence. No change in use, egress or occupancy filed under this application. | $617,700 |
| Q01198580-I1-GC | 2026-03-23 | General construction | 22-12 43 STREET | HEREWITH FILE ALTERATION CO IN ORDER TO DO VERTICAL AND HORIZONTAL EXTENSIONS TO AN EXISTING ONE FAMILY DWELLING AND CONVERTING TO TWO FAMILY DWELLING. TO ERECT INTERIOR PARTITIONS | $760,020 |
| Q01168005-S3-GC-CX | 2026-02-10 | General construction | 80-10 192 STREET | Filing FO and ST drawings, including inspection program to remediate and approve building extension (2 store porch) constructed without permit. | $20,000 |
| Q01251367-I1-GC-CX | 2025-12-23 | Mechanical / HVAC | 179-31 TUDOR ROAD | HEREWITH FILE ALTERATION CO TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, I | $1,239,950 |
| Q01251367-I1-GC-CX | 2025-12-23 | General construction | 179-31 TUDOR ROAD | HEREWITH FILE ALTERATION CO TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, I | $1,239,950 |
| Q01268146-I1-GC-CX | 2025-11-03 | General construction | 143-20 182 PLACE | EXISTING TWO STORY ON FAMILY DWELLING TO BE HORIZONTALLY AND VERTICALLY ENLARGED AND COVERTED INTO A TWO FAMILY DWELLING AND FULLY RENOVATED. NEW DRYWALL PARTITIONS AND PLUMBING FI | $749,050 |
| Q01172865-I1-GC | 2025-10-29 | General construction | 109-80 GAR VAN WYCK EXPRESSWAY | HEREWITH FILE NB TO LEGALIZE 2 VEHICLE CARPORT AND REMOVE VIOLATIONS ISSUED & TO RESOLVE VIOLATIONS #37026890R AND #39031062K. | $0 |
| Q01026136-I1-GC | 2025-09-11 | General construction | 75-35 185 STREET | APPLICATION IS FILED FOR HORIZONTAL ENLARGEMENT TO AN EXISTING BUILDING AND TO RESOLVE ECB VIOLATIONS #39107123N, #39107311K & #39108998K | $110,000 |
| Q01173404-I1-GC | 2025-09-03 | General construction | 103-39 135 STREET | ALTERATION G/C TO INSTALL CANOPY IN THE REAR YARD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. NO INCREASE TO BULK. REQUESTING LETTER OF COMPLETION FOR THE SAME. | $34,500 |
| Q01151686-I1-GC | 2025-08-27 | General construction | 53-71 61 STREET | Herewith filed Alteration application for the vertical enlargement and conversion of the Existing (1) One Story, (1) Family Residential Building into a (2) Two Story, (2) Two Famil | $259,400 |
| Q01206605-I1-GC-CX | 2025-08-19 | Mechanical / HVAC | 82-47 217 STREET | HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQ | $955,235 |
| Q01206605-I1-GC-CX | 2025-08-19 | General construction | 82-47 217 STREET | HEREWITH FILE ALTERATION CO IN ORDER TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQ | $955,235 |
| Q01231477-I1-GC | 2025-08-14 | General construction | 190-21 UNION TURNPIKE | HEREWITH FILE ALTERATION IN ORDER TO ERECT A PERGOLA IN THE EXISTING ONE-STORY COMMERCIAL BUILDING ANDTO OBTAIN A LETTER OF COMPLETION. NO CHANQE TO USE OCCUPANCY OR EGRESS | $100,000 |
| Q01078947-I1-GC | 2025-08-04 | General construction | 15 9 AVENUE | HEREWITH FILE THIS ALT-CO FOR THE HORIZONTAL & VERTICAL ENLARGMENT OF THE EXISTING 1 FAMILY DWELLING, ALSO TO COMBINE TWO TAX LOTS INTO AN ENLARGED ZONING LOT AND TO OBTAIN AN L.O. | $308,000 |
| S00981474-I1-GC | 2025-06-23 | General construction | 301 HOWARD AVENUE | PROPOSED ENLARGEMENT FROM 2-STORY TO A 3-STORY DETACHED ONE-FAMILY BUILDING WITH CELLAR. OBTAIN NEW CERTIFICATION OF OCCUPANCY. | $1,718,193 |
| B01144176-I1-GC | 2025-05-22 | General construction | 40 DEVOE STREET | PROPOSED 4-STORY MASONRY AND STEEL HEREAFTER ERECTED CLASS A 5-FAMILY MULTIPLE DWELLING. | $0 |
| Q01188882-I1-GC | 2025-05-20 | General construction | 79-28 METROPOLITAN AVENUE | HEREWITH FILE ALTERATION CO IN ORDER TO CONVERT AND EXISTING CATERING HALL AS PER C OF O NUMBER 4022511368F IN TO A LAUNDROMAT AND A RETAIL STORE. TO ERECT INTERIOR PARTITIONS, STR | $1,596,000 |
| Q01168005-I1-GC-CX | 2025-05-07 | Mechanical / HVAC | 80-10 192 STREET | HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO E | $314,490 |
| Q01168005-I1-GC-CX | 2025-05-07 | General construction | 80-10 192 STREET | HEREWITH FILE ALTERATION TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39134482Z, 34635416Y, 34635417X, TO E | $314,490 |
| Q01174745-I1-GC-CX | 2025-05-06 | General construction | 219-32 PECK AVENUE | HEREWITH FILE ALTERATION TO DO A VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39136766J, TO ERECT INTERIOR PARTITIONS, TO OBTAIN A | $829,300 |
| Q01174745-I1-GC-CX | 2025-05-06 | Mechanical / HVAC | 219-32 PECK AVENUE | HEREWITH FILE ALTERATION TO DO A VERTICAL EXTENSION TO AN EXISTING TWO-STORY ONE-FAMILY DWELLING. TO ADDRESS VIOLATION NUMBERS 39136766J, TO ERECT INTERIOR PARTITIONS, TO OBTAIN A | $829,300 |
| Q01151038-I1-GC-CX | 2025-04-02 | General construction | 180-11 TUDOR ROAD | HEREWITH FILE ALTERATION CO TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, I | $1,792,472 |
| Q01151038-I1-GC-CX | 2025-04-02 | Mechanical / HVAC | 180-11 TUDOR ROAD | HEREWITH FILE ALTERATION CO TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, I | $1,792,472 |
| B01167412-I1-GC | 2025-04-02 | General construction | 300 18 STREET | PROPOSED RENOVATION OF A THREE STORY, RESIDENTIAL BUILDING | $520,600 |
| Q00982926-I1-GC-CX | 2025-02-10 | General construction | 181-17 TUDOR ROAD | HEREWITH FILE ALTERATION CO TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, I | $2,048,305 |
| Q00982926-I1-GC-CX | 2025-02-10 | Mechanical / HVAC | 181-17 TUDOR ROAD | HEREWITH FILE ALTERATION CO TO DO A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING INCLUDING MECHANICAL WORK TYPE. FO SOE & ST FILED SUBSEQUENTLY, I | $2,048,305 |
| B01157949-I1-GC | 2025-01-02 | General construction | 1220 DEAN STREET | Interior demolition of existing 3 story and basement building. Demolition of existing nonbearing partitions, ceilings and soffits, removal of misc. millwork fittings and finishes a | $57,816 |
| M01141053-I1-GC | 2024-12-27 | General construction | 232 WEST END AVENUE | GC application filed for a temporary mock-up at the roof for LPC visibility study. No change to use, egress or occupancy. | $1,000 |
| Q00921327-I1-GC | 2024-10-17 | General construction | 53-69 61 STREET | Herewith filed Alteration app. for vertical enlargement & conversion of Existing (1) Story, (1) Family Building into (2) Story, (2) Family, obtain New C of O for same. Plumbing fil | $436,800 |
| Q01090919-I1-GC-CX | 2024-10-02 | General construction | 160-15 129 AVENUE | Existing one story, one family dwelling unit, to be horizontally and vertically enlarged and converted into a two family dwelling units, and fully renovated. New drywall partitions | $334,320 |
| Q01074360-I1-GC-CX | 2024-08-26 | General construction | 114-15 209 STREET | Existing two story, one family dwelling unit, to be horizontally enlarged and converted into a two family dwelling units, and fully renovated. New drywall partitions and plumbing f | $343,100 |
| Q00997166-I1-GC-CX | 2024-06-02 | General construction | 131-08 160 STREET | Existing one story, one family dwelling unit, to be horizontally and vertically enlarged and converted into a two family dwelling units, and fully renovated. New drywall partitions | $251,400 |
| B00998912-I1-GC | 2024-05-13 | General construction | 824 FRIEL PLACE | Proposed construction of the 3 story 3 family building on the existing foundation, which is to remain, to comply with Alteration Co to meet New Building requirements. | $730,696 |
| Q00968427-I1-GC | 2024-04-15 | General construction | 83-22 188 STREET | Renovation and enlargement of existing 1 family house | $413,000 |
| Q00916554-I1-GC-CX | 2023-11-09 | General construction | 226-06 147 AVENUE | Existing one story, one family dwelling unit, to be horizontally and vertically enlarged and converted into a two family dwelling units, and fully renovated. New drywall partitions | $495,085 |
| Q08023699-I1-GC | 2023-09-28 | General construction | 1415 PINSON STREET | NEW THREE (3) STORY TWO (2) FAMILY DETACHED DWELLING. | $396,000 |
| X00869560-I1-GC | 2023-08-01 | General construction | 2135 REEDS MILL LANE | HEREWITH FILING FOR THE CONSTRUCTION OF A NEW THREE (3) STORY BUILDING, ELEVEN (11) DWELLING UNITS WITH ELEVEN (11) PARKING SPACES. | $0 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
