COMPANY RECORD · NEW YORK, NY

R'pol Construction Inc — permit history in New York, NY

R'pol Construction Inc appears on 34 New York permit records from 2021 through 2026, most often general construction (62.9% of the record).

Permit categories

CategoryPermitsShare
General construction2262.9%
Mechanical / HVAC1337.1%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20215
20222
202311
20243
20254
202610

Busiest year on record: 2023, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
New York Park Plbg&Htg Co32026-01-29
Best Mechanical Svcs Inc12023-06-22
Mbq Contracting Corp12023-02-10
Orbit Plbg & Htg Inc12021-07-15
Pacific Plbg&Htg Corp12023-09-14
Rightway Plbg And Htg Inc12023-06-12
Simple Choice Plbg And Ht12025-10-16

7 companies are named alongside R'pol Construction Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
14 EAST 69 STREET2026-08-24
211 EAST 79 STREET2026-08-12
515 AUDOBON AVENUE2026-06-25
165-01 CHAPIN PARKWAY2026-05-14
525 AUDUBON AVENUE2026-04-30
66-83 FOREST AVENUE2026-04-22
71-58 69 PLACE2026-01-09
164-11 CHAPIN PARKWAY2025-10-17
2720 SURF AVENUE2025-02-03
62-10 34 AVENUE2023-09-25
1620 FULTON STREET2023-09-22
50-15 BEACH CHANNEL DRIVE2023-06-20
300 WEST 122 STREET2023-04-20
280 WEST 231 STREET2023-01-19

19 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $10,000 to $2,999,872, median $117,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

34 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01103288-I1-MS2026-08-24Mechanical / HVAC14 EAST 69 STREETINSTALLATION OF HVAC SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.$250,000
M01342977-S1-MS2026-08-12Mechanical / HVAC211 EAST 79 STREETINSTALL NEW HVAC UNITS, DUCTWOR, EXHAUST FANS, AND RELATED DUCTWORK.$1,999,872
M01406422-I1-GC2026-06-25General construction515 AUDOBON AVENUEINTERIOR REMOVAL OF NONBEARING PARTITION WALLS ,CEILINGS, FLOORING AND FINISHES ON THE GROUND FLOOR ONLY. AS PER PLANS FILED HEREIWTH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$49,987
M01297529-I1-GC2026-05-27General construction211 EAST 79 STREETFiling herewith for interior renovation of first floor lobby area. Remove and install new non load bearing partitions, fixtures and finishes. Replacement of exterior canopy.$586,350
Q01325007-S1-MS2026-05-14Mechanical / HVAC165-01 CHAPIN PARKWAYRemove and replace mechanical units and related ductwork for renovation of existing spaces.$300,000
Q01325007-I1-GC2026-05-14General construction165-01 CHAPIN PARKWAYINTERIOR RENOVATION OF EXISTING SPACE. INSTALL NEW NON-LOAD BEARING PARTITIONS, FIXTURES, AND FINISHES. ALL DEMOLITION WAS FILED UNDER RELATED APPLICATION Q01300063.$2,999,872
M01377264-I1-GC2026-04-30General construction525 AUDUBON AVENUEINTERIOR DEMOLITION OF NON-LOADING PARTITIONS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$160,000
Q01318125-I1-GC2026-04-22General construction66-83 FOREST AVENUECONVERSION OF PART OF EXISTING COMMERCIAL INTO RESIDENTIAL - 1 NEW DWELLING UNIT; RENOVATION OF THIRD FLOOR.$363,200
M01311854-I1-MS2026-02-13Mechanical / HVAC211 EAST 79 STREETInstallation of fresh air intake system. Remove and install mechanical units and all related piping and ductwork.$360,000
Q01311393-I1-GC2026-01-09General construction71-58 69 PLACERENOVATION OF (4) APARTMENTS, MINOR LAYOUT CHANGES AS PER PLAN, NEW FINISHES, RELATED WITH PLUMBING AND MECHANICAL WORK UNDER SEPARATE APPLICATION. NO CHANGE TO USE OCCUPANCY AND E$320,000
Q01300063-I1-GC2025-12-01General construction165-01 CHAPIN PARKWAYAPPLICATION IS LIMITED TO NON-STRUCTURAL INTERIOR DEMOLITION. REMOVAL OF NON BEARING PARTITIONS, FIXTURES, AND FINISHES.$39,000
Q01187590-I1-MS2025-10-17Mechanical / HVAC164-11 CHAPIN PARKWAYInstallation of two new co-generators in cellar, gas piping filed under Q01187590-S1 as per plans filed herewith.$80,000
Q01294165-I1-GC2025-10-09General construction66-83 FOREST AVENUERENOVATION OF EXISTING APARTMENT ON THE SECOND FLOOR, SOME NEW PARTITONS, BEAUTIFICATION OF EXISTING COMMERICAL SPACE (PAINTING, NEW FLOORING).$70,000
B01125079-I1-GC2025-02-03General construction2720 SURF AVENUEINTERIOR RENOVATION OF EXISTING RECEPTION AREAS LOCATED AT THE 1ST FLOOR. REMOVE AND INSTALL NEW NON-LOAD BEARING PARTITIONS AND FINISHES.$120,000
M01102122-I1-GC2024-10-15General construction14 EAST 69 STREETExterior / Interior renovations with new elevator bulkhead all as per plans shown in conjunction with alt 1 # M00932497-I1$117,000
M01052797-I1-GC2024-10-15General construction14 EAST 69 STREETwindow replacement in conjunction with alt 1 # M00932497-I1$80,000
M00981633-I1-GC2024-02-20General construction14 EAST 69 STREETConversion from 5 to 1 family dwelling unit-all work on the interior of the building-new c of o - all finishes as per plans submitted. STRUCTURAL, MECHANICAL, PLUMBING AND SPRINKLE$987,500
M00932495-I1-GC2023-09-28General construction14 EAST 69 STREETinterior demolition as shown on plans in conjunction with alt1# M00932497-I1$80,000
Q00880544-I1-GC2023-09-25General construction62-10 34 AVENUEHEREWITH FILING USE OF BUILDING FROM FACTORY TO AUTO REPAIR SHOP AS PER PLANS. GENERAL CONSTRUCTION WORK PROPOSED.$175,000
B00835218-I1-MS2023-09-22Mechanical / HVAC1620 FULTON STREETAPLICATION IS FOR HVAC INSTALLATIONS AS REQUIRED FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE (AREA M), AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPAN$50,000
B00835277-I1-MS2023-09-22Mechanical / HVAC1620 FULTON STREETAPPLICATION IS FOR HVAC INSTALLATIONS AS REQUIRED FOR INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE (AREAS A & T), AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, EGRESS OR O$60,000
Q00880544-S1-MS2023-07-07Mechanical / HVAC62-10 34 AVENUEHEREWITH FILING MECHANICAL WORK AS PER PLANS$105,000
Q00785824-S1-MS2023-06-20Mechanical / HVAC50-15 BEACH CHANNEL DRIVENew mechanical fit out of first floor Outpatient Diagnostic & Treatment Center, new HCHW fan coil units with associated ductwork.$374,999
Q00785824-I1-GC2023-06-20General construction50-15 BEACH CHANNEL DRIVERenovation of partial first floor to create new Diagnostic and Treatment Center. Change of use to first floor space,$879,120
M00798822-I1-GC2023-04-20General construction300 WEST 122 STREETInterior Fit Out of space. Install new non-load bearing partitions, fixtures, and finishes.$49,985
B00809219-I1-GC2023-03-14General construction1620 FULTON STREETAPPLICATION IS FOR INTERIOR, NON STRUCTURAL RENOVATION OF EXISTING OFFICES SPACES (A AND T) & INSTALLATION OF 2 NEW DORRS AT STOREFRONT, AS PER PLANS SUBMITTED HEREWITH. NO CHANGE $52,440
B00809373-I1-GC2023-03-13General construction1620 FULTON STREETAPPLICATION IS FOR INTERIOR, NON STRUCTURAL RENOVATION OF EXISTING OFFICE SPACE (AREA M), AS PER PLANS SUBMITTED HEREWITH. NO CHAANGE TO USE, EGRESS OR OCCUPANCY, DUE TO PROPOSED W$28,620
X08036215-I1-MS2023-01-19Mechanical / HVAC280 WEST 231 STREETInstallation of new HVAC Units for renovation of first floor and cellar.$20,000
B00687628-I1-GC2022-05-09General construction3035 WEST 24 STREETRenovation of First floor entry way. Remove and install non- bearing partitions and patch work as per plans.$10,000
M00673936-I1-GC2022-02-16General construction1997 3 AVENUERenovation to modify existing first floor. Remove and install new non load bearing partitions, fixtures and finishes.$249,937
Q00565036-I1-MS2021-08-09Mechanical / HVAC6605 MYRTLE AVENUEINSTALLATION OF HVAC IN TWO FAMILY HOUSE.$25,000
M00523951-I1-GC-CX2021-06-25Mechanical / HVAC3648 BROADWAYAPPLICATION IS FILED FOR THE INTERIOR RENOVATION OF AN EXISITING COMMERICAL SPACE, REMOVAL & REPLACEMENT OF INTERIOR PARTITIONS & PLUMBING FIXTURES. ALSO INCLUDES NEW HVAC SYSTEM &$406,990
M00523951-I1-GC-CX2021-06-25General construction3648 BROADWAYAPPLICATION IS FILED FOR THE INTERIOR RENOVATION OF AN EXISITING COMMERICAL SPACE, REMOVAL & REPLACEMENT OF INTERIOR PARTITIONS & PLUMBING FIXTURES. ALSO INCLUDES NEW HVAC SYSTEM &$406,990
M00434047-S1-MS2021-06-22Mechanical / HVAC10 HILLSIDE AVENUEINSTALLATION OF NEW INDOOR AND OUTDOOR HVAC SYSTEM. EXISTING 10-TON AIR HANDLER TO REMAIN. EXISTING DUCTWORK AND ROOF DUNNAGE TO REMAIN. NO CHANGE TO USE, EGRESS, OR OCCUPANCY U$80,000
M00455209-I1-GC2021-03-11General construction3648 BROADWAYAPPLICATION IS FILED FOR THE INTERIOR DEMOLITION OF EXISTING NON-LOAD BEARING DEMISING PARTITIONS, FINISHES AND STOREFRONT AT FIRST FLOOR & CELLAR. ALL NEW WORK TO BE FILED UNDER S$52,500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →