COMPANY RECORD · NEW YORK, NY

Prime Construction Mgmt — permit history in New York, NY

Prime Construction Mgmt appears on 81 New York permit records from 2019 through 2026, most often general construction (50.6% of the record).

Permit categories

CategoryPermitsShare
General construction4150.6%
Mechanical / HVAC4049.4%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20192
20205
202112
202219
202314
202522
20267

Busiest year on record: 2025, with 22 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Sean Coakley P & H Inc52026-07-27
Breffni Mechanical Inc22025-05-07

2 companies are named alongside Prime Construction Mgmt on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
18 WEST 21 STREET2026-08-25
434 BROADWAY2026-08-24
99 PARK AVENUE2026-07-16
310 EAST 86 STREET2026-05-06
1250 BROADWAY2026-01-20
110 WEST 27 STREET2025-07-23
110 UNIVERSITY PLACE2025-04-16
410 PARK AVENUE2023-10-20
9 EAST 19 STREET2023-09-07
346 EAST 238 STREET2021-06-17
150 BROADWAY2021-01-29

11 distinct addresses on record. Declared value on record runs from $1,000 to $1,578,125, median $65,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

81 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01435620-I1-GC2026-08-25General construction18 WEST 21 STREETInterior demo on 11th floor as per plans filed herewith.$50,000
M01394966-S1-MS2026-08-24Mechanical / HVAC434 BROADWAYHerewith filing for modifications to existing mechanical systems on floors 007-009 as indicated on plans. No change in use, occupancy, or egress.$318,785
M01394966-I1-GC2026-07-27General construction434 BROADWAYTHIS APPLICATION IS FILED HEREWITH FOR THE INTERIOR RENOVATION OF 434 BROADWAY - 7TH, 8TH, & 9TH FLOORS - INCLUDING THE INSTALLATION OF NON-LOAD BEARING PARTITIONS, FINISHES. NO CH$1,578,125
M01370496-I1-GC2026-07-16General construction99 PARK AVENUEAT 23RD FLOOR TERRACE, INSTALLATION OF A PASSIVE RECREATION SPACE IN COMPLIANCE WITH DOB BULLETIN #BB2018-002 AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS$1,050,000
M01338936-S1-MS2026-05-06Mechanical / HVAC310 EAST 86 STREETAPPLICATION FILED FOR MECHANICAL ADDITIONS/MODIFICATIONS ON THE 1ST FLOOR (BODYROK) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$53,500
M01299760-I1-MS2026-01-20Mechanical / HVAC1250 BROADWAYAT 35th floor tenant space and bathrooms, removal of ductwork. At bathrooms installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, o$30,000
M01299756-I1-GC2026-01-20General construction1250 BROADWAYAT 35TH FLOOR TENANT SPACE AND BATHROOMS, REMOVAL OF INTERIOR PARTITIONS, FINISHES, AND FIXTURES. AT BATHROOMS, INSTALLATION OF NEW PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANG$220,000
M01191049-I1-MS2025-10-08Mechanical / HVAC99 PARK AVENUEAT 11TH Floor Entire Tenant Space and bathrooms, Removal of Existing Ductwork as per plans filed herewith. No change to use, occupancy, or egress.$30,175
M01191044-I1-GC2025-10-07General construction99 PARK AVENUEAT 11TH Floor Entire Tenant Space and Bathrooms, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes as per plans filed herewith. No change to use, occupancy, or eg$171,877
M01235803-I1-GC2025-08-29General construction99 PARK AVENUEAT 4TH FLOOR NORTH TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$399,570
M01235804-I1-MS2025-08-18Mechanical / HVAC99 PARK AVENUEAT 4TH FLOOR NORTH TENANT SPACE, ADDITIONS/MODIFICATION TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$70,000
M01255401-I1-GC2025-07-23General construction110 WEST 27 STREETAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 6TH FLOOR AS PER PLANS FIELD HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC$176,000
M01191242-I1-MS2025-06-24Mechanical / HVAC99 PARK AVENUEAT 3rd Floor Entire Tenant Space, Removal of Existing Ductwork; At Bathrooms, Removal and Installation of Exhaust Grilles and Diffusers as per plans filed herewith. No change to us$30,000
M01198189-I1-MS2025-06-16Mechanical / HVAC99 PARK AVENUEAT 19TH FLOOR TENANT SPACE AND HALLWAYS, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$130,000
M01155653-I1-GC2025-06-06General construction99 PARK AVENUEAT 3rd Floor Entire Tenant Space and Bathrooms, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes; At Bathrooms, Installation of Plumbing Fixtures on same, new pa$250,000
M01191305-I1-MS2025-06-05Mechanical / HVAC99 PARK AVENUEAT 23RD Floor Entire Tenant Space, Removal of Existing Ductwork; At Bathrooms, Removal and Installation of Exhaust Grilles and Diffusers as per plans filed herewith. No change to u$90,000
M01198183-I1-GC2025-06-05General construction99 PARK AVENUEAT 19TH FLOOR TENANT SPACE AND HALLWAYS, REMOVAL OF INTERIOR PARTITIONS & FINISHES AND INSTALLATION OF NEW PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCC$248,200
M01158179-I1-GC2025-05-29General construction99 PARK AVENUEAT 23RD Floor Entire Tenant Space and Bathrooms, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes; At Bathrooms, Installation of Plumbing Fixtures on same, new p$175,000
M01190535-I1-MS2025-05-27Mechanical / HVAC99 PARK AVENUEAT 19TH Floor Tenant Space, Removal of Existing Ductwork; At Bathrooms, Removal and Installation of Exhaust Grilles and Diffusers as per plans filed herewith. Noc hange to use, occ$109,000
M01158138-I1-GC2025-05-12General construction99 PARK AVENUEAT 19TH Floor Tenant Space and Bathrooms, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes; At Bathrooms, Installation of Plumbing Fixtures on same, new partitio$180,000
M01041755-I1-GC2025-04-16General construction110 UNIVERSITY PLACEFiling for interior renovation of commercial space on the 1st floor, exercise studio- less than 74 people. Work includes installation of interior non-load bearing partitions and fi$229,989
M01155670-I1-MS2025-02-27Mechanical / HVAC99 PARK AVENUEAT 10TH Floor Entire Tenant Space, Removal of Existing Ductwork; At Bathrooms, Removal and Installation of Exhaust Grilles and Diffusers as per plans filed herewith. No change to u$25,000
M01155667-I1-GC2025-02-20General construction99 PARK AVENUEAt 10th Floor Entire Tenant Space and Bathrooms, removal of non-bearing Partitions, Hung Ceilings and Floor Finishes; At tenant space, Installation of non-bearing partitions as per$570,000
M00957016-I1-MS2025-02-14Mechanical / HVAC99 PARK AVENUEAT 6TH Floor Entire Tenant Space, Removal of Existing Ductwork; At Bathrooms, Removal and Installation of Exhaust Grilles and Diffusers as per plans filed herewith. No change to us$30,000
M00957014-I1-GC2025-02-06General construction99 PARK AVENUEAT 6TH Floor Entire Tenant Space and Bathrooms, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes; At Bathrooms, Installation of Plumbing Fixtures on same, new pa$300,000
M00959897-I1-MS2025-02-05Mechanical / HVAC99 PARK AVENUEAT 9TH Floor South Tenant Space, Removal of Existing Ductwork as per plans filed herewith. No change to use, occupancy, or egress.$8,000
M00899880-I1-GC2025-02-04General construction99 PARK AVENUEAT 5TH Floor Entire Tenant Space and Bathrooms, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes; At Bathrooms, Installation of Plumbing Fixtures on same, new pa$300,000
M00959894-I1-GC2025-02-04General construction99 PARK AVENUEAT 9TH Floor South Tenant Space, Removal of Non-bearing Partitions, Hung Ceilings and Floor Finishes as per plans filed herewith. No change to use, occupancy, or egress.$65,000
M00899884-I1-MS2025-02-03Mechanical / HVAC99 PARK AVENUEAT 5TH Floor Entire Tenant Space, Removal of Existing Ductwork; At Bathrooms, Removal and Installation of Exhaust Grilles and Diffusers as per plans filed herewith. No change to us$15,000
M00953219-I1-GC2023-11-06General construction99 PARK AVENUEAT SUITE 1940, REMOVAL OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$23,000
M00953223-I1-MS2023-11-06Mechanical / HVAC99 PARK AVENUEAT SUITE 1940, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$3,000
M00940075-I1-MS2023-10-20Mechanical / HVAC410 PARK AVENUEAT 4TH FLOOR TENANT SPACE #420, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$60,000
M00940072-I1-GC2023-10-17General construction410 PARK AVENUEAT 4TH FLOOR TENANT SPACE #420, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$250,000
M00890382-I1-MS2023-10-04Mechanical / HVAC99 PARK AVENUEAT SUITE 1930, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$3,000
M00890377-I1-GC2023-10-03General construction99 PARK AVENUEAT SUITE 1930, REMOVAL OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$23,000
M00910504-I1-GC2023-09-07General construction9 EAST 19 STREETRemoval and installation of interior non load bearing partitions, hung ceilings and finishes related to office renovation$204,976
M00865301-I1-MS2023-07-03Mechanical / HVAC99 PARK AVENUEAT 2ND FLOOR TENANT SPACE AND PUBLIC BATHROOMS, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$25,000
M00865296-I1-GC2023-07-03General construction99 PARK AVENUEAT 2ND FLOOR TENANT SPACE AND PUBLIC BATHROOMS, REMOVAL OF INTERIOR PARTITIONS & FINISHES AND INSTALLATION OF NEW BATHROOMS PARTITIONS & FINISHESAS PER PLANS FILED HEREWITH. NO CHA$300,000
M00822017-I1-GC2023-05-02General construction410 PARK AVENUEAT 18TH FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$225,000
M00822023-I1-MS2023-05-02Mechanical / HVAC410 PARK AVENUEAT 18TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$200,000
M00844978-I1-GC2023-04-05General construction99 PARK AVENUEAT 4TH FLOOR NORTH TENANT SPACE, REMOVAL OF INTERIOR PARTITIONS AND FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$78,000
M00844989-I1-MS2023-04-05Mechanical / HVAC99 PARK AVENUEAT 4TH FLOOR NORTH TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$6,000
M08045024-I1-GC2023-01-09General construction110 WEST 27 STREETAPPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR (BODYROK) AS PER PLANS FIELD HEREWITH. NO CHANGE IN USE, EGRESS, O$127,575
M00798987-I1-GC2022-09-14General construction410 PARK AVENUEAT 17TH FLOOR SUITE 1710, INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$100,000
M00798975-I1-GC2022-09-13General construction410 PARK AVENUEAT 11TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR NON BEARING PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.$250,000
M00798988-I1-MS2022-09-12Mechanical / HVAC410 PARK AVENUEAT 17TH FLOOR SUITE 1710, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$76,000
M00798979-I1-MS2022-09-12Mechanical / HVAC410 PARK AVENUEAT 11TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$250,000
M00776598-I1-MS2022-08-26Mechanical / HVAC99 PARK AVENUEAT 3RD FLOOR SUITE #310, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$10,000
M00749927-I1-MS2022-08-26Mechanical / HVAC99 PARK AVENUEAT 17TH FLOOR SOUTH TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$3,500
M00760046-I1-MS2022-08-26Mechanical / HVAC99 PARK AVENUEAT 1ST FLOOR AND CELLAR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS.$27,500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →