Power Cooling Inc — permit history in New York, NY
Power Cooling Inc appears on 62 New York permit records from 2019 through 2026, most often mechanical / hvac (86.8% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 001843 | 68 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | POWER COOLING INC |
|---|---|
| Business address on file | 43-43 VERNON BOULEVARD LONG ISLAND CITY NY 11101 |
| Business phone on file | (718) 784-1300 |
| Licence number | 1843 |
| Licence type | GENERAL CONTRACTOR |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to Power Cooling Inc by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 59 | 86.8% |
| General construction | 9 | 13.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 2 |
| 2020 | 4 |
| 2021 | 8 |
| 2022 | 20 |
| 2023 | 5 |
| 2024 | 17 |
| 2025 | 8 |
| 2026 | 4 |
Busiest year on record: 2022, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Smart Plbg & Htg Corp | 2 | 2022-02-01 |
1 companies are named alongside Power Cooling Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 120 WEST 106 STREET | 2026-09-08 |
| 530 5 AVENUE | 2026-05-14 |
| 70-25 YELLOWSTONE BOULEVARD | 2026-02-19 |
| 70 EAST 55 STREET | 2026-01-27 |
| 785 FIFTH AVENUE | 2025-12-18 |
| 2 COLUMBUS AVENUE | 2025-11-26 |
| 1204 YORK AVENUE | 2025-11-21 |
| 200 EAST 64 STREET | 2025-09-17 |
| 693 FIFTH AVENUE | 2025-06-23 |
| 455 MADISON AVENUE | 2025-06-04 |
| 181 EAST 65 STREET | 2025-01-27 |
| 1 CAMPUS ROAD | 2024-12-02 |
| 66-36 YELLOWSTONE BOULEVARD | 2024-11-04 |
| 508 FULTON STREET | 2024-10-07 |
53 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $10,500 to $3,196,000, median $252,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Smart Plbg & Htg Corp | 5 | 2022–2025 |
| Spk/Lewis Construction Ll | 5 | 2019–2026 |
| Ace-Atlas Plbing & Htg | 4 | 2019–2026 |
| Aggressive Fire Prot LLC | 4 | 2020–2026 |
| Dna Contracting LLC | 3 | 2022–2025 |
| Tyler Construction Inc | 3 | 2020–2024 |
| Brosna Construction Corpo | 3 | 2021–2026 |
| Sirina Fire Prot Corp | 3 | 2020–2026 |
Companies that also appear in New York permit records at addresses where Power Cooling Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
62 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01407517-I1-GC | 2026-09-08 | General construction | 120 WEST 106 STREET | THE SCOPE INCLUDES RENOVATION OF THE BASE BUILDING CHILLER PLANT TO INCLUDE THE REMOVAL OF EXISTING ABSORPTION CHILLERS AND SYSTEM COMPONENTS IN ACCORDANCE WITH DE-CARBONIZATION AN | $120,000 |
| M01376809-I1-MS | 2026-05-14 | Mechanical / HVAC | 530 5 AVENUE | EMR AC REPLACEMENT- REMOVE AC AND INSTALL REPLACEMENT AC EQUIPMENT WITH RELATED MECHANICAL MODIFICATIONS AS PER PLANS FILED. No change to use, egress or occupancy. | $112,675 |
| Q01268757-I1-MS | 2026-02-19 | Mechanical / HVAC | 70-25 YELLOWSTONE BOULEVARD | Upgrade of existing cooling tower. No change in use, egress or occupancy. | $650,000 |
| M01323109-I1-MS | 2026-01-27 | Mechanical / HVAC | 70 EAST 55 STREET | REPLACEMENT OF COOLING TOWER ON THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $647,205 |
| M01299081-I1-MS | 2025-12-18 | Mechanical / HVAC | 785 FIFTH AVENUE | FILING TO REPLACED EXISTING COOLING TOWER. | $783,000 |
| M01302642-I1-MS | 2025-11-26 | Mechanical / HVAC | 2 COLUMBUS AVENUE | REPLACEMENT OF TWO (2) HVAC UNITS AS SHOWN ON PLANS | $298,000 |
| M01262432-I1-MS | 2025-11-21 | Mechanical / HVAC | 1204 YORK AVENUE | REPLACEMENT OF WATER COOLED CHILLER ON THE GROUND FLOOR. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $875,000 |
| M01257721-I1-MS | 2025-09-17 | Mechanical / HVAC | 200 EAST 64 STREET | TEMPORARY DISCONNECTION OF MECHANICAL EQUIPMENT AT ROOF.NEW REFRIGERANT PIPING INSTALLATION AND EXTRIOR LIGHTING WORK AS PER PLANS SUBMITTED HEREWITH. | $65,000 |
| M01222867-I1-MS | 2025-06-23 | Mechanical / HVAC | 693 FIFTH AVENUE | REPLACEMENT OF EXISTING CHILLER ON FLOOR 019 MER WITH 4 WATER COOLED MODULAR CHILLERS WITH A TOTAL CAPACITY OF 70 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $295,000 |
| M01206854-I1-MS | 2025-06-04 | Mechanical / HVAC | 455 MADISON AVENUE | REPLACE CHILLER AND DUCTWORK PER PLANS. REPLACE EXHAUST FAN. | $1,856,000 |
| M00984656-I1-GC | 2025-01-27 | General construction | 181 EAST 65 STREET | The addition of mechanical equipment to the system for the penthouse. | $140,000 |
| M00984656-I1-GC | 2025-01-27 | Mechanical / HVAC | 181 EAST 65 STREET | The addition of mechanical equipment to the system for the penthouse. | $140,000 |
| S01133375-I1-MS | 2024-12-02 | Mechanical / HVAC | 1 CAMPUS ROAD | INSTALL NEW HEAT PUMP HOT WATER HEATING SYSTEM AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $360,000 |
| Q00660417-I1-GC | 2024-11-04 | General construction | 66-36 YELLOWSTONE BOULEVARD | FILING FOR COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $440,000 |
| Q00660417-I1-GC | 2024-11-04 | Mechanical / HVAC | 66-36 YELLOWSTONE BOULEVARD | FILING FOR COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $440,000 |
| Q00660417-I1-ST | 2024-10-31 | General construction | 66-36 YELLOWSTONE BOULEVARD | FILING FOR COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $440,000 |
| Q00660417-I1-ST | 2024-10-31 | Mechanical / HVAC | 66-36 YELLOWSTONE BOULEVARD | FILING FOR COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $440,000 |
| B01118469-I1-MS | 2024-10-07 | Mechanical / HVAC | 508 FULTON STREET | REPLACEMENT OF ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $70,000 |
| B01118510-I1-MS | 2024-10-02 | Mechanical / HVAC | 1230 AVENUE R | REPLACEMENT OF ROOFTOP CHILLER WITH A TOTAL CAPACITY OF 238,850 BTU/H. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $70,000 |
| M01059689-I1-MS | 2024-09-20 | Mechanical / HVAC | 145 EAST 76 STREET | REPLACEMENT OF THE COOLING TOWER | $300,000 |
| X01099975-I1-MS | 2024-09-19 | Mechanical / HVAC | 3250 WESTCHESTER AVENUE | INSTALLATION OF 20 TON CAPACITY CONDENSING UNIT ON THE ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $70,000 |
| B01099965-I1-MS | 2024-09-03 | Mechanical / HVAC | 2095 FLATBUSH AVENUE | INSTALLATION OF CHILLER ON THE GROUND FLOOR OUTSIDE SPACE WITH A TOTAL CAPACITY OF 238,850 BTU/H. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $70,000 |
| M01085703-I1-MS | 2024-08-14 | Mechanical / HVAC | 1320 YORK AVENUE | INSTALLATION OF SPLIT SYSTEM ON FLOOR 001 AND THE ROOF WITH A TOTAL CAPACITY OF 2.5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $10,500 |
| B01040654-I1-MS | 2024-05-08 | Mechanical / HVAC | 75 OCEANA DRIVE EAST | INSTALLATION OF TWO (2) PACKAGED GAS-FIRED ROOFTOP UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $83,925 |
| M00904565-S2-MS | 2024-04-10 | Mechanical / HVAC | 100 WASHINGTON SQUARE EAST | vivarium steam boiler replacement related duct work | $216,666 |
| M00984656-I1-MS | 2024-03-04 | General construction | 181 EAST 65 STREET | The addition of mechanical equipment to the system for the penthouse. | $140,000 |
| M00984656-I1-MS | 2024-03-04 | Mechanical / HVAC | 181 EAST 65 STREET | The addition of mechanical equipment to the system for the penthouse. | $140,000 |
| Q00963836-I1-MS | 2024-02-06 | Mechanical / HVAC | 66-36 YELLOWSTONE BOULEVARD | FILING FOR A CHILLER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $1,498,245 |
| X00942875-I1-MS | 2024-01-17 | Mechanical / HVAC | 3220 HENRY HUDSON PARKWAY | HEREBY FILING MECHANICAL WORK TO CELLAR AND ROOF AS PER PLANS. | $650,000 |
| Q00848958-I1-MS | 2023-09-19 | Mechanical / HVAC | 81-80 UTOPIA PARKWAY | FILING HEREWITH CHILLER PLANT EQUIPMENT AND PIPING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $3,196,000 |
| M00867978-I1-MS | 2023-06-07 | Mechanical / HVAC | 801 SECOND AVENUE | Replace existing cooling towers, Install new HVAC units, associated components and piping as per plans. | $150,000 |
| X00833312-I1-MS | 2023-04-12 | Mechanical / HVAC | 4705 HENRY HUDSON PARKWAY | HEREBY FILING FOR THE REPLACEMENT OF CHILLER. ALL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $500,000 |
| M00840051-I1-MS | 2023-03-24 | Mechanical / HVAC | 456 WEST 19 STREET | REPLACE COOLING TOWER. | $248,500 |
| M08021110-I1-MS | 2023-01-04 | Mechanical / HVAC | 71 WEST 23 STREET | REPLACEMENT INDOOR COOLING TOWER. ALL WORK IS INTERIOR TO THE CELLAR. | $100,000 |
| M08008878-I1-MS | 2022-11-15 | Mechanical / HVAC | 71 WEST 23 STREET | Herewith filing for modifications to existing mechanical systems on the cellar (North Wing) as indicated on plans. No change in use, occupancy, or egress. | $150,000 |
| M00691375-I1-MS | 2022-10-24 | Mechanical / HVAC | 785 FIFTH AVENUE | Replacement of existing chiller system. No change in occupancy use or egress. | $1,000,000 |
| M00647964-I1-MS | 2022-09-13 | Mechanical / HVAC | 1 WASHINGTON SQUARE NORTH | POST FIRE SMOKE PURGE FAN REPLACEMENT AT ROOF AND MODIFICaTIONs to associated ductwork | $110,000 |
| M00745754-I1-MS | 2022-09-13 | Mechanical / HVAC | 372 FIFTH AVENUE | INSTALL COOLING TOWER. | $191,000 |
| M00647943-I1-MS | 2022-09-13 | Mechanical / HVAC | 1 WASHINGTON MEWS | POST FIRE SMOKE PURGE FAN REPLACEMENT AT ROOF AND MODIFICATIONs to associated ductwork | $40,000 |
| M00760595-I1-MS | 2022-08-22 | Mechanical / HVAC | 529 FIFTH AVENUE | Mechanical work to replace cooling tower and related work on the roof and sub-cellar as indicated on drawings | $2,455,000 |
| M00674164-I1-GC-CX | 2022-06-08 | Mechanical / HVAC | 535 WEST 116 STREET | This application is filed to remove old units and install two new air handling units (AHU) | $15,000 |
| M00674164-I1-GC-CX | 2022-06-08 | General construction | 535 WEST 116 STREET | This application is filed to remove old units and install two new air handling units (AHU) | $15,000 |
| M00606602-I1-MS | 2022-05-06 | Mechanical / HVAC | 100 WASHINGTON SQUARE EAST | replacement of vivarium air handling units at roof servicing 11th floor with associated duct and piping work | $400,000 |
| Q00660417-I1-MS | 2022-05-05 | General construction | 66-36 YELLOWSTONE BOULEVARD | FILING FOR COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $440,000 |
| Q00660417-I1-MS | 2022-05-05 | Mechanical / HVAC | 66-36 YELLOWSTONE BOULEVARD | FILING FOR COOLING TOWER REPLACEMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $440,000 |
| Q00629510-I1-MS | 2022-04-01 | Mechanical / HVAC | 161-01 JAMAICA AVENUE | HVAC UPGRADE FOR AC UNIT S-3 LOCATED IN THE FIFTH FLOOR MACHINE ROOM OF THE COMMERCIAL BUILDING . REPLACEMENT SYSTEM WILL BE AN IN KIND AIR HANDLING UNIT . WORK INCLUDES ALL CONTR | $320,000 |
| Q00629056-I1-MS | 2022-03-31 | Mechanical / HVAC | 161-01 JAMAICA AVENUE | HVAC UPGRADE FOR AC UNIT S-2 LOCATED IN THE SECOND FLOOR MACHINE ROOM OF THE COMMERCIAL BUILDING . REPLACEMENT SYSTEM WILL BE A VRV UNIT WITH DUCTED AC UNITS AND DEDICATED OUTDOOR | $250,000 |
| M00688482-I1-MS | 2022-03-16 | Mechanical / HVAC | 470 RIVERSIDE DRIVE | REPLACEMENT OF EX. CHILLER IN SUB-CEL AND ALL ASSOC. PIPING/EQUIPMENT AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $472,000 |
| M00539851-I1-MS | 2022-02-25 | Mechanical / HVAC | 63 CHARLES STREET | REPLACEMENT OF TWO ROOFTOP UNITS WITH A TOTAL CAPACITY OF 5 TONS. NO CHANGE TO EGRESS,USE, OR OCCUPANCY. | $39,700 |
| M00546807-I1-MS | 2022-02-25 | Mechanical / HVAC | 28 BETHUNE STREET | REPLACEMENT OF 5 TON ROOFTOP UNIT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. | $17,500 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 62 permits above are a static record through 2026. Select a year above to open that year’s records, or search Power Cooling Inc in New York, NY by address, trade or date range.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.