COMPANY RECORD · NEW YORK, NY
Ncr Construction Inc — permit history in New York, NY
Ncr Construction Inc appears on 26 New York permit records from 2020 through 2026, most often general construction (52.4% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 22 | 52.4% |
| Mechanical / HVAC | 20 | 47.6% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 1 |
| 2021 | 10 |
| 2022 | 9 |
| 2023 | 7 |
| 2024 | 2 |
| 2025 | 9 |
| 2026 | 4 |
Busiest year on record: 2021, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Infiniti Esc Plumbing Cor | 8 | 2026-05-29 |
1 companies are named alongside Ncr Construction Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 142-17 250 STREET | 2026-04-27 |
| 107-35 132 STREET | 2026-03-09 |
| 165-17 144 DRIVE | 2025-11-28 |
| 115-24 204 STREET | 2025-08-04 |
| 134-35 161 STREET | 2025-05-27 |
| 111-39 GAR 172 STREET | 2025-05-27 |
| 146-04 FOCH BOULEVARD | 2025-03-06 |
| 160-31 122 AVENUE | 2024-05-16 |
| 187-11 SULLIVAN ROAD | 2023-08-11 |
| 177-33 145 DRIVE | 2023-07-19 |
| 121-07 MERRILL STREET | 2023-06-23 |
| 134-36 158 STREET | 2023-04-25 |
| 160-16 121 AVENUE | 2023-01-31 |
| 126-03 172 STREET | 2022-11-29 |
25 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,071,800, median $331,940. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
26 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01297015-I1-GC-CX | 2026-04-27 | Mechanical / HVAC | 142-17 250 STREET | CONVERSION OF AN EXISTING 1- 1/2-STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2-STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION. | $970,600 |
| Q01297015-I1-GC-CX | 2026-04-27 | General construction | 142-17 250 STREET | CONVERSION OF AN EXISTING 1- 1/2-STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2-STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION. | $970,600 |
| Q01261896-I1-GC-CX | 2026-03-09 | General construction | 107-35 132 STREET | PROPOSED NEW TWO (2) STORY, TWO (2) FAMILY BUILDING WITH CELLAR. OBTAIN A CERTIFICATE OF OCCUPANCY. | $0 |
| Q01261896-I1-GC-CX | 2026-03-09 | Mechanical / HVAC | 107-35 132 STREET | PROPOSED NEW TWO (2) STORY, TWO (2) FAMILY BUILDING WITH CELLAR. OBTAIN A CERTIFICATE OF OCCUPANCY. | $0 |
| Q01203732-I1-GC-CX | 2025-11-28 | Mechanical / HVAC | 165-17 144 DRIVE | CONVERSION OF AN EXISTING 2 STORY WITH CELLAR, 1 FAMILY FRAME BUILDING TO A 2 STORY WITH CELLAR, TWO FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION. | $759,720 |
| Q01203732-I1-GC-CX | 2025-11-28 | General construction | 165-17 144 DRIVE | CONVERSION OF AN EXISTING 2 STORY WITH CELLAR, 1 FAMILY FRAME BUILDING TO A 2 STORY WITH CELLAR, TWO FAMILY DWELLING WITH HORIZONTAL AND VERTICAL EXTENSION. | $759,720 |
| Q01231207-I1-GC-CX | 2025-08-04 | Mechanical / HVAC | 115-24 204 STREET | CONVERSION OF AN EXISTING 1/2-STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2-STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTALAND VERTIVAL EXTENSION. | $411,620 |
| Q01231207-I1-GC-CX | 2025-08-04 | General construction | 115-24 204 STREET | CONVERSION OF AN EXISTING 1/2-STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2-STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTALAND VERTIVAL EXTENSION. | $411,620 |
| Q01140240-I1-GC-CX | 2025-05-27 | Mechanical / HVAC | 134-35 161 STREET | PROPOSED NEW TWO STORY WITH CELLAR TWO-FAMILY FRAME BUILDING | $0 |
| Q01140240-I1-GC-CX | 2025-05-27 | General construction | 134-35 161 STREET | PROPOSED NEW TWO STORY WITH CELLAR TWO-FAMILY FRAME BUILDING | $0 |
| Q01172061-I1-GC | 2025-05-27 | General construction | 111-39 GAR 172 STREET | Application filed to supersede a Pre-BIS NB Garage 709-70 and to obtain a certificate of occupancy (No work under this application) | $0 |
| Q01159226-I1-GC-CX | 2025-03-06 | General construction | 146-04 FOCH BOULEVARD | CONVERSION OF AN EXISTING 2-STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2-STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL EXTENSION. | $411,620 |
| Q01159226-I1-GC-CX | 2025-03-06 | Mechanical / HVAC | 146-04 FOCH BOULEVARD | CONVERSION OF AN EXISTING 2-STORY, ONE-FAMILY FRAME BUILDING W/ CELLAR TO A 2-STORY WITH CELLAR, TWO-FAMILY DWELLING WITH HORIZONTAL EXTENSION. | $411,620 |
| Q00888134-I1-GC-CX | 2024-05-16 | General construction | 160-31 122 AVENUE | CONVERSION OF AN EXIST. 1 1/2 STORY, 1 FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION. | $303,840 |
| Q00888134-I1-GC-CX | 2024-05-16 | Mechanical / HVAC | 160-31 122 AVENUE | CONVERSION OF AN EXIST. 1 1/2 STORY, 1 FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION. | $303,840 |
| Q00845587-I1-GC-CX | 2023-08-11 | General construction | 187-11 SULLIVAN ROAD | ALTERATION TYPE 2 FILED TO REMOVE ILLEGAL NON-LOAD BEARING PARTITIONS IN THE CELLAR TO ADDRESS ECB VIOLATION #34865686H. | $1,500 |
| Q00845556-I1-GC-CX | 2023-07-19 | General construction | 177-33 145 DRIVE | PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY. | $218,650 |
| Q00845556-I1-GC-CX | 2023-07-19 | Mechanical / HVAC | 177-33 145 DRIVE | PROPOSED HORIZONTAL ENLARGEMENT, FULL INTERIOR & EXTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY. | $218,650 |
| Q00652533-I1-GC-CX | 2023-06-23 | General construction | 121-07 MERRILL STREET | HORIZONTAL ADDITION TO EXISTING DWELLING, CONVERTING FROM A ONE TO A TWO FAMILY DWELLING | $1,071,800 |
| Q00828662-I1-GC-CX | 2023-04-25 | Mechanical / HVAC | 134-36 158 STREET | CONVERSION OF AN EXISTING 2 STORY, 1-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION | $336,360 |
| Q00828662-I1-GC-CX | 2023-04-25 | General construction | 134-36 158 STREET | CONVERSION OF AN EXISTING 2 STORY, 1-FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION | $336,360 |
| Q08042539-I1-GC-CX | 2023-01-31 | General construction | 160-16 121 AVENUE | CONVERSION OF AN EXISTING 1 1/2 STORY, 1 FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION | $444,170 |
| Q08015126-I1-GC | 2022-11-30 | General construction | 121-07 MERRILL STREET | PARTIAL DEMOLITION OF EXISTING BUILDING- NO CHANGE IN USE/OCCUPANCY, EGRESS, ROOM COUNT/DWELLING UNITS | $25,000 |
| Q08006769-I1-GC-CX | 2022-11-29 | General construction | 126-03 172 STREET | CONVERSION OF AN EXISTING 1 STORY, 1 FAMILY BRICK BUILDING WITH CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH VERTICAL EXTENSION. | $307,440 |
| Q08006769-I1-GC-CX | 2022-11-29 | Mechanical / HVAC | 126-03 172 STREET | CONVERSION OF AN EXISTING 1 STORY, 1 FAMILY BRICK BUILDING WITH CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH VERTICAL EXTENSION. | $307,440 |
| Q00619365-I1-GC-CX | 2022-08-02 | Mechanical / HVAC | 29-12 GILLMORE STREET | CONVERSION OF THE EXIST. TWO&HALF STORY 1-FAMILY BLDG INTO A TWO STORY 2-FAMILY BLDG AS SHOWN ON THE PLANS. PROP. HORIZ. ENLARGEMENT. ADDRESS VIO. #051917COBMJC01, 35126091X & VAC | $716,770 |
| Q00619365-I1-GC-CX | 2022-08-02 | General construction | 29-12 GILLMORE STREET | CONVERSION OF THE EXIST. TWO&HALF STORY 1-FAMILY BLDG INTO A TWO STORY 2-FAMILY BLDG AS SHOWN ON THE PLANS. PROP. HORIZ. ENLARGEMENT. ADDRESS VIO. #051917COBMJC01, 35126091X & VAC | $716,770 |
| Q00717924-I1-GC-CX | 2022-07-05 | General construction | 139-11 248 STREET | Conversion of an existing g1 1/2 story one family frame building with cellar to a two-story two-family dwelling with horizontal and vertical extension | $414,870 |
| Q00717924-I1-GC-CX | 2022-07-05 | Mechanical / HVAC | 139-11 248 STREET | Conversion of an existing g1 1/2 story one family frame building with cellar to a two-story two-family dwelling with horizontal and vertical extension | $414,870 |
| Q00517519-I1-GC | 2022-01-28 | General construction | 176-06 145 DRIVE | PPROPOSE NEW 2 STORY, TWO FAMILY DWELLING FRAME BUILDING WITH CELLAR. | $450,000 |
| Q00315859-I1-MS | 2022-01-14 | Mechanical / HVAC | 139-18 248 STREET | installation of a new mechanical system | $16,700 |
| Q00581660-I1-GC-CX | 2021-10-21 | Mechanical / HVAC | 138-23 249 STREET | PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT, FULL INTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY. | $327,520 |
| Q00581660-I1-GC-CX | 2021-10-21 | General construction | 138-23 249 STREET | PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT, FULL INTERIOR RENOVATION, AND CONVERSION TO TWO-FAMILY. | $327,520 |
| Q00498442-I1-GC-CX | 2021-10-01 | Mechanical / HVAC | 143-53 249 STREET | CONVERSION OF AN EXISTING ONE AND HALF STORY ONE FAMILY FRAME BUILDING TO A TWO STORY TWO FAMILY DWELLING WITH HORIZONTAL AND VERTICAL ENLARGEMENT | $302,220 |
| Q00498442-I1-GC-CX | 2021-10-01 | General construction | 143-53 249 STREET | CONVERSION OF AN EXISTING ONE AND HALF STORY ONE FAMILY FRAME BUILDING TO A TWO STORY TWO FAMILY DWELLING WITH HORIZONTAL AND VERTICAL ENLARGEMENT | $302,220 |
| Q00492438-I1-GC-CX | 2021-08-17 | Mechanical / HVAC | 176-04 145 DRIVE | CONVERSION OF AN EXIST. 1 1/2 STORY, 1 FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION. | $404,490 |
| Q00492438-I1-GC-CX | 2021-08-17 | General construction | 176-04 145 DRIVE | CONVERSION OF AN EXIST. 1 1/2 STORY, 1 FAMILY FRAME BUILDING W/ CELLAR TO A 2 STORY, TWO FAMILY DWELLING WITH HORIZONTAL & VERTICAL EXTENSION. | $404,490 |
| Q00478776-I1-GC-CX | 2021-05-27 | Mechanical / HVAC | 245-23 147 AVENUE | CONVERSION OF AN EXISTING ONE AND HALF STORY ONE FAMILY FRAME BUILDING TO A TWO STORY TWO FAMILY DWELLING WITH HORIZONTAL AND VERTICAL ENLARGEMENT | $399,720 |
| Q00478776-I1-GC-CX | 2021-05-27 | General construction | 245-23 147 AVENUE | CONVERSION OF AN EXISTING ONE AND HALF STORY ONE FAMILY FRAME BUILDING TO A TWO STORY TWO FAMILY DWELLING WITH HORIZONTAL AND VERTICAL ENLARGEMENT | $399,720 |
| Q00437952-I1-MS | 2021-05-07 | Mechanical / HVAC | 69-60 229 STREET | INSTALLATION OF A NEW MECHANICAL SYSTEM FILED INCONJUNCTION WITH ALT 1 APPLICATION # 440647114 FILED IN BIS | $16,700 |
| Q00337936-I1-MS | 2021-02-24 | Mechanical / HVAC | 142-27 253 STREET | MECHANICAL WORK IN CONJUNCTION WITH ALT 1 # 421943124 | $26,700 |
| Q00297775-I1-MS | 2020-11-17 | Mechanical / HVAC | 238-19 149 AVENUE | MECHANICAL SYSTEM WORK TYPE FILED IN CONJUNCTION WITH ALT1 APPLICATION# 421781352 | $5,050 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
