COMPANY RECORD · NEW YORK, NY
Manhattan Cabinets, Inc — permit history in New York, NY
Manhattan Cabinets, Inc appears on 37 New York permit records from 2021 through 2026, most often general construction (91.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 34 | 91.9% |
| Mechanical / HVAC | 3 | 8.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 6 |
| 2022 | 2 |
| 2023 | 8 |
| 2024 | 5 |
| 2025 | 10 |
| 2026 | 6 |
Busiest year on record: 2025, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Procore Mechanical Corp | 10 | 2026-07-06 |
| P.S.I. Mechanical | 3 | 2024-01-09 |
2 companies are named alongside Manhattan Cabinets, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 120 EAST 79 STREET | 2026-08-07 |
| 20 SUTTON PLACE SOUTH | 2026-07-06 |
| 345 EAST 52 STREET | 2026-04-01 |
| 5 TUDOR CITY PLACE | 2026-01-08 |
| 840 PARK AVENUE | 2026-01-05 |
| 360 EAST 72 STREET | 2025-11-06 |
| 165 EAST 72 STREET | 2025-10-06 |
| 530 EAST 76 STREET | 2025-08-26 |
| 160 WEST 66 STREET | 2025-05-07 |
| 1725 YORK AVENUE | 2025-02-10 |
| 1050 FIFTH AVENUE | 2025-01-21 |
| 15 WEST 84 STREET | 2024-11-14 |
| 425 EAST 58 STREET | 2024-09-23 |
| 165 WEST END AVENUE | 2024-09-11 |
28 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $5,000 to $255,378, median $85,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
37 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01432044-I1-GC | 2026-08-07 | General construction | 120 EAST 79 STREET | IN UNIT 9A ON 9TH FLOOR, REMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AS SHOWN ON PLANS. ALL PLUMBING WORK FILED UNDER SEPARATE APPLICATION. NO CHANGE TO EGRESS, USE, OR | $129,000 |
| M01397064-I1-GC | 2026-07-06 | General construction | 20 SUTTON PLACE SOUTH | APPLICATION FILED FOR INTERIOR RENOVATION &RELATED PLUMBING WORK OF APT 20B ON 19THFLOOR. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION. | $200,000 |
| M01373531-I1-GC | 2026-04-01 | General construction | 345 EAST 52 STREET | COMBINATION OF APTS 11C AND 11D AS PER TPPN 3.97 AND AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $5,000 |
| M01327786-I1-GC | 2026-03-17 | General construction | 345 EAST 52 STREET | 11CD: Apartment combination interior renovations as as per plans filed herewith. No change to use, egress or occupancy | $217,500 |
| M01277995-I1-GC | 2026-01-08 | General construction | 5 TUDOR CITY PLACE | INSTALL NEW PARTITIONS AT APT 1834 ON THE 18TH FLOOR. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $25,000 |
| M01277115-I1-GC | 2026-01-05 | General construction | 840 PARK AVENUE | The scope of work is limited to the construction of a closet above an existing closet within a duplex apartment (area of work is 50 sf). S1 document filed for structural work in c | $15,000 |
| M01203407-I1-GC | 2025-11-06 | General construction | 360 EAST 72 STREET | HEREBY FILING FOR THE CREATION OF NEW DEN AND MINOR COSMETIC UPGRADES TO BATHROOM. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. | $30,000 |
| M01251959-I1-GC | 2025-10-06 | General construction | 165 EAST 72 STREET | INTERIOR RENOVATION OF APARTMENT 16C ON THE 16TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $14,994 |
| M01256192-I1-GC | 2025-08-26 | General construction | 530 EAST 76 STREET | INTERIOR RENOVATION OF APT. 12AK ON THE 12TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $105,688 |
| M01197458-S2-MS | 2025-08-26 | Mechanical / HVAC | 840 PARK AVENUE | Herewith file plans for the installation of 4 new air cooled split system a/c units in Apt. 9/10A | $30,000 |
| M01197458-I1-GC | 2025-08-26 | General construction | 840 PARK AVENUE | Renovation of existing duplex apartment 9/10A on 9th & 10th floors, work includes general construction, removal and installation of interior non load bearing partitions and relate | $110,000 |
| M01216907-I1-GC | 2025-05-20 | General construction | 20 SUTTON PLACE SOUTH | INTERIOR RENOVATION OF APARTMENT 8C ON THE 8TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $65,750 |
| M01210500-I1-GC | 2025-05-07 | General construction | 160 WEST 66 STREET | INTERIOR RENOVATION OF APARTMENT 33B ON THE 33RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $85,000 |
| M01169781-I1-GC | 2025-02-10 | General construction | 1725 YORK AVENUE | INTERIOR RENOVATION OF APARTMENT 19E ON THE 19TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $109,500 |
| M01155199-I1-GC | 2025-01-29 | General construction | 20 SUTTON PLACE SOUTH | Interior renovation of an apartment with minor demolition of non-structural partitions, new drywall partitions, and new floors. There was no change of use, egress, or occupancy und | $11,000 |
| M01131296-I1-GC | 2025-01-21 | General construction | 1050 FIFTH AVENUE | PROPOSED INTERIOR NON-STRUCTURAL INTERIOR MODIFICATION INCLUDING THE MODIFICATION OF THE KITCHEN, BATHROOMS, AND FINISHES THROUGHOUT. NO CHANGE IN USE , OCCUPANCY OR EGRESS IS PROP | $228,360 |
| M00964829-I1-GC | 2024-11-14 | General construction | 15 WEST 84 STREET | Interior renovation in unit 5C on the 5th floor. No change in use, egress, or occupancy. | $10,000 |
| M01103874-I1-GC | 2024-09-23 | General construction | 425 EAST 58 STREET | INTERIOR RENOVATION INVOLVES MINOR DEMOLITION, NEW PARTITIONS, DOORS,FINISHES AND FIXTURES FOR A NEW KITCHEN AND BATHROOMS.NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $150,000 |
| M01064472-I1-GC | 2024-09-11 | General construction | 165 WEST END AVENUE | Interior renovations to include partition work to combine apartments 19D and 19E in compliance with DOB TPPN#3/97. No change in use, egress,or occupancy proposed under this applica | $102,500 |
| M01018115-I1-GC | 2024-05-14 | General construction | 205 EAST 78 STREET | COMBINE APT 5E & 5F AS PER LL77 (TPPN 0397). MINOR RENOVATION AT APT 5F AS PER PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $50,000 |
| M00964704-I1-GC | 2024-01-05 | General construction | 160 WEST 66 STREET | INTERIOR RENOVATION OF APARTMENT 18B ON THE 18TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $99,000 |
| M00895755-I1-GC | 2023-12-21 | General construction | 23 EAST 74 STREET | PARTIAL INTERIOR REMOVALS AND RENOVATION TO UNIT 7D WITH NEW CONSTRUCTION OF INTERIOR WALLS, ADDITION OF NEW BATHROOM, AND WINDOW REPLACEMENT. NO CHANGE IN USE,OCCUPANCY OR EGRESS. | $200,000 |
| M00895755-S2-MS | 2023-12-21 | Mechanical / HVAC | 23 EAST 74 STREET | MODIFICATION TO EXISTING MECHANICAL SYSTEMS AND RELATED DUCTWORK. INSTALLATION OF (2) HVAC LOUVERS. NO CHANGE IN OCCUPANCY, USE OR EGRESS. | $10,000 |
| M00963151-I1-GC | 2023-12-14 | General construction | 20 SUTTON PLACE SOUTH | Renovation on an existing apartment#19C on the 19th Floor. Work includes non-structural demolition and general construction as per plans filed herewith. No change to use, egress or | $155,000 |
| M00893416-I1-GC | 2023-11-02 | General construction | 201 WEST 70 STREET | INTERIOR RENOVATION OF APT 24F ON THE 24TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $80,000 |
| M00851539-I1-GC | 2023-08-24 | General construction | 130 EAST 18 STREET | INTERIOR RENOVATION AT APT 9V. COMBINE APT 9V WITH 9W INTO ONE APT. AS PER BUILDING BULLETIN #3/97. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $75,000 |
| M00866371-I1-GC | 2023-05-25 | General construction | 190 EAST 72 STREET | Alterations to dwelling unit: Remove portions of interior partitions, replace millwork, appliances, and plumbing fixtures in-kind in existing locations, and new lighting throughout | $255,378 |
| M00812644-I1-GC | 2023-03-20 | General construction | 129 WEST 70 STREET | INTERIOR RENOVATION AT APT 3 ON THE 3RD FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $90,000 |
| M00601871-I1-GC | 2023-02-16 | General construction | 360 EAST 72 STREET | GENERAL RENOVATION TO APARTMENT 707A - SCOPE INCLUDES: REMOVE WALL BETWEEN LIV/DIN RM + KITCHEN; REPLACE PLUMBING FIXTURES AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $175,000 |
| X00716589-I1-GC | 2022-04-15 | General construction | 2567 YOUNG AVENUE | INTERIOR RENOVATION OF 2ND FLOOR APARTMENT, REMOVAL OF PARTITION BETWEEN KITCHEN AND LIVING ROOM. | $15,000 |
| M00660803-I1-GC | 2022-03-12 | General construction | 345 EAST 69 STREET | COMBINE AND MINOR RENOVATION AT APT 14G & 14H ON 14TH FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $80,000 |
| M00477013-I1-GC | 2021-11-08 | General construction | 239 EAST 79 STREET | Interior renovation of existing duplex apartment 13/14B on the 13th FL only. No work to windows. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $130,000 |
| M00496590-I1-GC | 2021-08-26 | General construction | 205 EAST 22 STREET | RENOVATION OF APT 3D AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE. | $62,500 |
| M00536226-I1-GC | 2021-07-06 | General construction | 310 EAST 70 STREET | COMBINATION OF APARTMENTS 7M&7L ON 7TH FLOOR. REMOVE AND CONSTRUCT PARTITIONS AND FINISHES. ALL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $130,000 |
| M00510306-I1-GC | 2021-05-27 | General construction | 97 ST MARKS PLACE | FILING FOR THE INSTALLATION OF PERGOLA STRUCTURES AT THE FRONT AND REAR YARDS OF THE BUILDING. PERGOLAS ARE PART OF THE COVID-19 TEMPORARY STRUCTURES FOR RESTAURANTS. NO CHANGE TO | $12,000 |
| M00484650-I1-GC | 2021-04-26 | General construction | 401 EAST 65 STREET | GENERAL CONSTRUCTION AND PLUMBING WORK TO COMBINE APARTMENTS 10F AND 10G PER PROVISIONS OF TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $134,000 |
| B00343142-I1-MS | 2021-04-05 | Mechanical / HVAC | 55 WYTHE AVENUE | PROPOSED NEW DUCTWORK DISTRIBUTION FILED IN CONJUNCTION WITH ALT II JOB No: 322070183 NO CHANGE IN USE, EGRESS OR OCCUPANCY | $6,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
