COMPANY RECORD · NEW YORK, NY
Ltm Construction LLC — permit history in New York, NY
Ltm Construction LLC appears on 42 New York permit records from 2021 through 2026, most often general construction (62.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 27 | 62.8% |
| Mechanical / HVAC | 16 | 37.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 10 |
| 2024 | 2 |
| 2025 | 20 |
| 2026 | 9 |
Busiest year on record: 2025, with 20 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Whitestone Plumbing Corp | 21 | 2026-08-19 |
| Daily Maintenance LLC | 1 | 2026-01-06 |
2 companies are named alongside Ltm Construction LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 34 GANSEVOORT STREET | 2026-05-21 |
| 540 MADISON AVENUE | 2026-05-07 |
| 120 WYTHE AVENUE | 2026-04-07 |
| 198 MADISON AVENUE | 2025-12-29 |
| 41 FLATBUSH AVENUE | 2025-12-22 |
| 100 WEST 94 STREET | 2025-11-18 |
| 165 MERCER STREET | 2025-11-14 |
| 358 GROVE STREET | 2025-08-27 |
| 7 WEEHAWKEN STREET | 2025-08-15 |
| 2 9 AVENUE | 2025-07-24 |
| 568 BROADWAY | 2025-06-23 |
| 405 WEST 13 STREET | 2025-02-03 |
| 546 HUDSON STREET | 2024-03-07 |
| 234 10 STREET | 2023-12-18 |
17 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $5,000 to $1,000,000, median $50,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
42 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01367829-S1-GC | 2026-05-21 | General construction | 34 GANSEVOORT STREET | Interior renovation of commercial space | $10,000 |
| M01367829-I1-MS | 2026-05-19 | Mechanical / HVAC | 34 GANSEVOORT STREET | Mechanical work for commercial tenant fitout. | $35,000 |
| M01387214-S1-MS | 2026-05-07 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on 21C/22M as per plans filed herewith. No change in use, egress or occupancy. | $59,990 |
| M01387214-I1-GC | 2026-05-07 | General construction | 540 MADISON AVENUE | Architectural modifications taking place on 21C/22M as per plans filed herewith. No change in use, egress or occupancy. | $700,000 |
| M01387197-S1-MS | 2026-05-07 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on 14C/15M as per plans filed herewith. No change in use, egress or occupancy. | $52,990 |
| M01387197-I1-GC | 2026-05-06 | General construction | 540 MADISON AVENUE | Architectural modifications taking place on 14C/15M as per plans filed herewith. No change in use, egress or occupancy. | $599,970 |
| M01374450-S1-MS | 2026-04-08 | Mechanical / HVAC | 540 MADISON AVENUE | Mechanical modifications taking place on 37C/38M and 38C/39M as per plans filed herewith. No change in use, egress or occupancy. | $5,000 |
| M01374450-I1-GC | 2026-04-08 | General construction | 540 MADISON AVENUE | Architectural modifications taking place on 37C/38M and 38C/39M as per plans filed herewith. No change in use, egress or occupancy. | $109,970 |
| B01265914-I1-GC | 2026-04-07 | General construction | 120 WYTHE AVENUE | Minor partition work at 1st floor and cellar, relocating bathroom at first floor, relocation egress of the commercial and residential creating new exterior openings in the commerci | $225,000 |
| M07999146-S2-MS | 2025-12-30 | Mechanical / HVAC | 34 GANSEVOORT STREET | Mechanical systems alterations on the 1st thru 5th floors and cellar level for proposed elevator modernization and change of use/occupancy; related work as per plans. | $44,000 |
| M01334429-I1-GC | 2025-12-29 | General construction | 198 MADISON AVENUE | Interior demolition of non-bearing gyp. bd. partitions, ductwork, millwork, floor finishes. Installation of new non-bearing gyp. bd. partitions & finishes. No change in use, occup | $174,250 |
| B01320323-I1-GC | 2025-12-22 | General construction | 41 FLATBUSH AVENUE | TENANT FITOUT FOR FIRST FLOOR TENANT KIRO. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION | $75,000 |
| M07999146-I1-GC | 2025-12-09 | General construction | 34 GANSEVOORT STREET | General construction alterations on the 1st thru 5th floors and cellar level for proposed elevator modernization and change of use/occupancy; related work as per plans. | $1,000,000 |
| M01325025-I1-GC | 2025-12-02 | General construction | 198 MADISON AVENUE | Interior demolition of non-bearing gyp. bd. partitions, ductwork, millwork, floor finishes. Installation of new non-bearing gyp. bd. partitions & finishes. No change in use, occup | $73,700 |
| M01312818-I1-GC-CX | 2025-11-18 | Mechanical / HVAC | 100 WEST 94 STREET | INTERIOR RENOVATION OF APT. 5A ON THE 5TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $45,000 |
| M01312818-I1-GC-CX | 2025-11-18 | General construction | 100 WEST 94 STREET | INTERIOR RENOVATION OF APT. 5A ON THE 5TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $45,000 |
| M07999146-S5-GC-CX | 2025-11-14 | General construction | 34 GANSEVOORT STREET | Structural and foundation alterations on the 1st thru 5th floors and cellar level for proposed new passenger elevator, dunnage, and reinforcement of existing floor framing for adde | $40,001 |
| M01275428-I1-GC | 2025-11-14 | General construction | 165 MERCER STREET | Minor construction work in 1st floor building lobby, cosmetic upgrade to elevator cab interior. | $100,000 |
| M01275435-I1-MS | 2025-11-14 | Mechanical / HVAC | 165 MERCER STREET | Minor mechanical work in the first floor building lobby. | $25,000 |
| B01272548-I1-GC | 2025-09-15 | General construction | 41 FLATBUSH AVENUE | TENANT FITOUT FOR FIRST FLOOR TENANT BROOKLYN FRENCH BAKER. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION | $40,000 |
| B08004498-S2-MS | 2025-08-27 | Mechanical / HVAC | 358 GROVE STREET | MECHANICAL WORK AS PER PLANS IN CONJUCTION WITH ALTERATION TYPE 1 APPLICATION NUMBER B08004498-I1. NO CHNAGE TO USE, EGRESS OR OCCUPANCY. | $15,750 |
| M01243578-I1-GC | 2025-08-15 | General construction | 7 WEEHAWKEN STREET | DEMOLITION OF INTERIOR NON-LOAD BEARING PARTITIONS AND EXTERIOR FACADE ELEMENTS. | $50,000 |
| M01253088-I1-GC | 2025-07-24 | General construction | 2 9 AVENUE | REMOVE AND ERECT NON RATED/ NON STRUCTURAL PARTITIONS, CEILINGS AND DOORS. | $180,000 |
| B01232648-I1-GC | 2025-06-26 | General construction | 41 FLATBUSH AVENUE | ARCHITECTURAL FILING FOR COMMERCIAL TENANT SOBOL FITOUT | $80,000 |
| M01228594-I1-GC | 2025-06-23 | General construction | 568 BROADWAY | Demolish non-loadbearing partitions, doors and frames; erect new non-loadbearing drywall partitions as per drawings. Plumbing cap & seal, fixture relocation under separate LAA. | $135,000 |
| B01208080-I1-GC | 2025-06-17 | General construction | 120 WYTHE AVENUE | Bring first floor residential back to pre existing commercial use with partition work and new exterior wall openings and H.C. bathroom minor renovations to second and third floor p | $319,900 |
| M01140791-S2-MS | 2025-02-03 | Mechanical / HVAC | 405 WEST 13 STREET | Modifications to existing toilet exhaust fans as shown on drawings. No change to occupancy use or egress. | $10,000 |
| M01140791-I1-GC | 2025-01-24 | General construction | 405 WEST 13 STREET | INTERIOR RENOVATION TO 3RD FLOOR, AS SHOWN ON DRAWINGS. PLUMBING WORK FILED UNDER SUBSEQUENT APPLICATION NUMBER M01140791-S1. NO CHANGE IN OCCUPANCY USE OR EGRESS. | $41,250 |
| B08004498-I1-GC | 2025-01-08 | General construction | 358 GROVE STREET | Proposed interior renovation for Day Care Use at Basement Floor. Installation of non-load bearing partitions and related finishes as per plans. | $94,220 |
| M00991697-I1-GC | 2024-03-07 | General construction | 546 HUDSON STREET | Interior renovation and minor exterior work in the rear yard. to an existing commercial space on the 1st floor only. Architectural / Construction work only. | $16,700 |
| M00991743-I1-MS | 2024-03-07 | Mechanical / HVAC | 546 HUDSON STREET | In conjunction with renovation of existing commercial space on the 1st floor. Mechanical work only. | $35,800 |
| B00880909-I1-GC | 2023-12-18 | General construction | 234 10 STREET | General construction work to include interior renovation of existing two family building and rear horizontal enlargement as shown on plans | $362,500 |
| B00880913-I1-MS | 2023-11-20 | Mechanical / HVAC | 234 10 STREET | Mechanical work as shown on plans | $100,000 |
| B00923453-S2-MS | 2023-11-16 | Mechanical / HVAC | 256 ADELPHI STREET | INSTALLATION OF MECHANICAL SYSTEM AND RELATED DUCTWORK. DISCONNECT AND REMOVE ALL PORTIONS OF THE EXISTING HEATING SYSTEM. HOT WATER HEATING SYSTEM INCLUDES NEW BOILER, NEW PIPING, | $18,000 |
| Q00927643-I1-MS | 2023-10-30 | Mechanical / HVAC | 45-09 SKILLMAN AVENUE | INSTALL MINI SPLIT AIR CONDITIONER UNITS AS SHOWN ON DRAWINGS. | $5,000 |
| Q00926325-I1-GC | 2023-10-30 | General construction | 45-09 SKILLMAN AVENUE | PROPOSED RENOVATION TO EXISTING ONE FAMILY HOUSE. NO CHANGE TO OCCUPANCY USE OR EGRESS. | $42,000 |
| B00850626-I1-GC | 2023-10-19 | General construction | 256 ADELPHI STREET | PROPOSED INTERIOR RENOVATION TO BASEMENT, 1ST, 2ND, AND 3RD FLOORS TO CREATE (1) SINGLE FAMILY RESIDENCE. | $490,103 |
| B00850642-I1-GC | 2023-10-19 | General construction | 256 ADELPHI STREET | Proposed facade renovation work as shown on drawings. Filed in conjunction with CO application number B00850626. | $20,000 |
| M00493074-I1-MS | 2023-08-09 | Mechanical / HVAC | 546 HUDSON STREET | Mechanical work related to existing structure renovation. | $5,010 |
| M00585554-I1-MS | 2023-05-12 | Mechanical / HVAC | 394 WEST STREET | Mechanical work related to interior renovation. No change in use, egress or occupancy. | $15,000 |
| M00493103-I1-GC | 2023-05-11 | General construction | 546 HUDSON STREET | General construction related to existing structure renovation. | $20,010 |
| M00599318-I1-MS | 2022-03-11 | Mechanical / HVAC | 2 9 AVENUE | Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application. | $75,000 |
| M00498647-I1-GC | 2021-05-10 | General construction | 2 9 AVENUE | Interior renovation of spaces as shown on plans filed herewith. | $350,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
