COMPANY RECORD · NEW YORK, NY

Lotus Metropolitan Constr — permit history in New York, NY

Lotus Metropolitan Constr appears on 34 New York permit records from 2020 through 2026, most often general construction (80.6% of the record).

Permit categories

CategoryPermitsShare
General construction2980.6%
Mechanical / HVAC719.4%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20202
20212
20229
20232
20247
20256
20268

Busiest year on record: 2022, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Edgecombe Plbg & Htg Inc62026-06-04
Applied Plumbing Sys Inc22026-03-12
Ganic Plumbing & Htg Inc12025-12-15
Procore Mechanical Corp12025-10-22

4 companies are named alongside Lotus Metropolitan Constr on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
75 PIERREPONT STREET2026-08-19
1 CHRISTOPHER STREET2026-05-22
301 WEST 57 STREET2026-03-25
30 CHARLTON STREET2026-03-12
419 EAST 73 STREET2025-10-14
447 WEST 18 STREET2025-07-30
215 WEST 98 STREET2025-06-24
166 EAST 90 STREET2025-04-10
201 EAST 62 STREET2025-02-03
38-78 REVIEW AVENUE2024-05-10
609 COLUMBUS AVENUE2024-04-11
590 AMSTERDAM AVENUE2024-01-22
588 AMSTERDAM AVENUE2024-01-18
225 5 AVENUE2024-01-02

24 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $5,000 to $155,000, median $47,600. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

34 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
B01362240-I1-GC2026-08-19General construction75 PIERREPONT STREETEMERGENCY REPLACEMENT OF WINDOWS DAMAGED BY FIRE AT APARTMENTS 3B (3RD FLOOR), 4A (4TH FLOOR), & 4B (4TH FLOOR). NO CHANGE IN USE, EGRESSOR OCCUPANCY.$27,000
M01396999-I1-GC2026-05-22General construction1 CHRISTOPHER STREETINTERIOR RENOVATION OF APARTMENT 12C (12TH FLOOR), PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$43,680
B01362269-I1-GC2026-04-23General construction75 PIERREPONT STREETEMRGENCY INTERIOR RENOVATION WORK OF APARTMENT 3B (3RD FLOOR) AND 4B (4TH FLOOR) FOLLOWING DAMAGE FROM FIRE AND SMOKE, PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPAN$54,600
M01315571-I1-GC2026-03-25General construction301 WEST 57 STREETAT 8TH FLOOR APT 8B- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND RELATED ELECTRICAL WORK.$120,000
B01355403-I1-GC2026-03-23General construction75 PIERREPONT STREETEMERGENCY INTERIOR RENOVATION OF APARTMENTS 1B (1ST FLOOR), 2A AND 2B (2ND FLOOR), FOLLOWING DAMAGE FROM FIRE IN ADJACENT UNITS, PERPLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR$136,300
M01359790-I1-GC2026-03-12General construction30 CHARLTON STREETINTERIOR RENOVATION OF APARTMENT 3B (3rd FLOOR), PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$52,440
M01343257-I1-GC2026-03-12General construction1 CHRISTOPHER STREETINTERIOR RENOVATION OF APARTMENT 12J AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$39,360
M01337498-I1-GC2026-03-12General construction1 CHRISTOPHER STREETREMOVAL AND INSTALLATION OF NEW STAIR AND RESTROOM AT 9 GREENWICH AVENUE (1 CHRISTOPHER STREET), PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$21,840
M01285282-I1-GC2025-10-14General construction419 EAST 73 STREET3G: Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy$39,000
M01139052-I1-GC2025-07-30General construction447 WEST 18 STREETAT CELLAR & 1ST FLOOR LOBBY- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$147,500
M01230005-I1-GC-CX2025-06-24Mechanical / HVAC215 WEST 98 STREETINTERIOR RENOVATION WITH RELATED MECHANICAL VENTILATION WORK AT APARTMENT 5C (5TH FLOOR), PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$155,000
M01230005-I1-GC-CX2025-06-24General construction215 WEST 98 STREETINTERIOR RENOVATION WITH RELATED MECHANICAL VENTILATION WORK AT APARTMENT 5C (5TH FLOOR), PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$155,000
M01156004-I1-GC2025-04-10General construction166 EAST 90 STREETINTERIOR RENOVATION OF EXISTING CELLAR APARTMENT, PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$39,200
M01139693-I1-GC2025-02-03General construction201 EAST 62 STREETINTERIOR RENOVATION OF APARTMENT 10D AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$136,000
M01096040-I1-GC2024-09-12General construction1 CHRISTOPHER STREET6C: Interior renovations consisting of partitions, finishes and plumbing work as per plans filed herewith. No change to use, egress or occupancy,.$60,000
M01066789-I1-GC2024-07-15General construction1 CHRISTOPHER STREET4G: Interior renovations consisting of partitions, finishes and plumbing work as per plans filed herewith. No change to use, egress or occupancy,.$49,000
Q00994241-I1-MS2024-05-10Mechanical / HVAC38-78 REVIEW AVENUEREPLACE EXISYING CONDENSING UNIT ON ROOF AND AC UNIT AT CEILING OF FIRST FLOOR WITH NEW EQUIPMENT. CONNECTING CONDENSING UNIT TO AC UNIT BY MEANS OF REFRIGERANT PIPING. AC UNIT CON$6,500
M00994115-I1-GC2024-04-11General construction609 COLUMBUS AVENUEAT 2ND FLOOR APT 2E- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND RELATED ELECTRICAL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$35,400
M00969541-I1-GC2024-01-22General construction590 AMSTERDAM AVENUEApt 15: Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.$20,700
M00969526-I1-GC2024-01-18General construction588 AMSTERDAM AVENUEApt 1RN: Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.$20,700
M00955631-I1-GC2024-01-02General construction225 5 AVENUEAT 7TH FLOOR APT 7E- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$10,000
B00954248-I1-GC2023-11-16General construction160 SOUTH 3 STREETApt 12A&14: Interior Renovations to combine apartments as per plans filed herewith. No change to use, egress or occupancy.$65,100
M00738617-I1-GC2023-03-29General construction515 EDGECOMBE AVENUEINTERIOR RENOVATION WITH MINOR PARTITION WORKS FOR 2ND FLOOR APT. 21. NO CHANGE OF USE, EGRESS OR OCCUPANCY.$23,700
M08019984-I1-GC2022-10-31General construction594 AMSTERDAM AVENUE3C & 3E: Apartment renovations consisting of partitions and finishes as per plans filed herewith. no change to use, egress or occupancy.$76,200
M08003573-I1-GC-CX2022-09-24General construction164 EAST 90 STREETApt 5W & 5FE: Apartment Renovations consisting of partitions and finishes along with mechanical ventilation as per plans filed herewith. No change to use, egress or occupancy$78,700
M08003573-I1-GC-CX2022-09-24Mechanical / HVAC164 EAST 90 STREETApt 5W & 5FE: Apartment Renovations consisting of partitions and finishes along with mechanical ventilation as per plans filed herewith. No change to use, egress or occupancy$78,700
M00761109-I1-GC2022-09-12General construction28 KING STREETApt 19 & 20: Interior renovations to combine apartments consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.$46,200
M00763729-I1-GC2022-07-20General construction425 EAST 65 STREETApt 27 & 28: Interior renovations and apartment combination as per plans filed herewith. No change to use, egress or occupancy.$45,990
M00747479-I1-MS2022-07-01Mechanical / HVAC447 WEST 18 STREETAT 12TH FLOOR APT 12A & ROOF- INSTALLATION OF NEW HVAC SPLIT HEAT PUMP SYSTEM. NO CHANGE TO USE, OCCUPANCY OR EGRESS.$84,000
M00714463-I1-GC2022-06-09General construction26 KING STREETApt 20: Interior renovations consisting of partitions and finishes as per plans filed herewith. No change to use, egress or occupancy.$21,975
M00683354-I1-GC2022-06-03General construction447 WEST 18 STREETAT 12TH FLOOR APT 12A & ROOF- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS. INSTALL NEW BULKHEAD AND VESTIBULE OVER EXISTING STAIR TO ROOF. NO C$113,100
M00587875-I1-GC2022-02-28General construction1 CHRISTOPHER STREETINTERIOR RENOVATION AT THE FIRST FLOOR LOBBY AND APARTMENT 1D, PER PLANS FILED HEREWITH. NO CHANGE IN USE,EGRESS OR OCCUPANCY.$80,000
M00424423-I1-MS2021-04-20Mechanical / HVAC314 EAST 91 STREETMECHANICAL WORK IN CONNECTION WITH THE INTERIOR RENOVATION OF APARTMENT 1R AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$5,000
M00454196-I1-GC2021-04-19General construction314 EAST 91 STREETINTERIOR RENOVATION WITH OF APARTMENT 1R AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA$57,000
M00296006-I1-MS2020-02-24Mechanical / HVAC1297 LEXINGTON AVENUEmechanical ventilation on the fourth floor apartment 7 and 8 as per plans filed herewith. no change in use, egress or occupancy$10,000
M00257413-I1-MS2020-01-02Mechanical / HVAC592 AMSTERDAM AVENUEPROPOSED MECHANICAL WORK IN CONNECTION WITH THE RENOVATION OF APARTMENT 17 AS PER PLANS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.$15,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →