COMPANY RECORD · NEW YORK, NY
Kns Building Rest. Inc — permit history in New York, NY
Kns Building Rest. Inc appears on 53 New York permit records from 2021 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 53 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 1 |
| 2022 | 13 |
| 2023 | 22 |
| 2024 | 9 |
| 2025 | 5 |
| 2026 | 3 |
Busiest year on record: 2023, with 22 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Sns Orgnization Ltd | 1 | 2026-04-23 |
1 companies are named alongside Kns Building Rest. Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 177 9 AVENUE | 2026-08-24 |
| 376 PRESIDENT STREET | 2026-04-06 |
| 108-25 HORACE HARDING EXPRESSWAY | 2026-03-05 |
| 177 EAST 123 STREET | 2025-10-30 |
| 3340 BAILEY AVENUE | 2025-10-15 |
| 608 FRANKLIN AVENUE | 2025-06-10 |
| 12 EAST 86 STREET | 2025-06-03 |
| 149 HURON STREET | 2025-04-30 |
| 305 EAST 72 STREET | 2024-11-25 |
| 129 BEACH 118 STREET | 2024-11-15 |
| 565 BROOME STREET | 2024-11-14 |
| 1950 CLOVE ROAD | 2024-11-13 |
| 307 EAST 44 STREET | 2024-11-01 |
| 253 WEST 72 STREET | 2024-09-25 |
49 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,400 to $3,000,000, median $250,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
53 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01414497-I1-GC | 2026-08-24 | General construction | 177 9 AVENUE | Curtain wall snap cover and masonry facade repairs as per plans. No change to use, occupancy or egress. | $1,083,500 |
| B00649198-I1-GC | 2026-04-06 | General construction | 376 PRESIDENT STREET | Masonry facade work, and sealant application as per plans. No change to use, egress, or occupancy. | $400,000 |
| Q01160754-I1-GC | 2026-03-05 | General construction | 108-25 HORACE HARDING EXPRESSWAY | Propose facade repairs. Scope of application to include: Brick, Sill, Lintel replacements, Mortar Repointing, and shelf angle replacement with waterproofing. | $157,510 |
| M01183081-I1-ST | 2025-10-30 | General construction | 177 EAST 123 STREET | Remedy ECB violation 35684042X. To file structural ST work for partial replacement of first floor concrete deck. No change in use, egress or occupancy under this application. | $285,000 |
| X01047027-S4-GC | 2025-10-15 | General construction | 3340 BAILEY AVENUE | Tenant-in-place facade recover over existing to remain. No change in egress, use, zoning, or occupancy. | $182,784 |
| B01217761-I1-GC | 2025-06-10 | General construction | 608 FRANKLIN AVENUE | Main Roof Replacement, 7th Floor Terrace Roof Replacement, Mezzanine Roof Replacement, Localized Facade Cladding General Repairs | $1,524,000 |
| M01157541-I1-GC | 2025-06-03 | General construction | 12 EAST 86 STREET | Masonry facade repairs as per plans. No change to use, egress, or occupancy. | $3,000,000 |
| B01067510-I1-GC | 2025-04-30 | General construction | 149 HURON STREET | Leak Repairs: replacement of exist. metal rain barriers on the south facade, leak repairs of EIFS system, including parapets and copings, terraces and balconies at north and south | $1,020,551 |
| M01066053-I1-GC | 2024-11-25 | General construction | 305 EAST 72 STREET | Roof Replacement at 305 East 72nd Street. Installation of vegetated trays at Roof Level. No change in use, occupancy or egress. | $710,500 |
| Q01126117-I1-GC | 2024-11-15 | General construction | 129 BEACH 118 STREET | BRICK POINTING AND REPLACEMENT ON FACADE. REPLACE LINTEL, WINDOW SILL AND CAULKING OF EXISTING WINDOWS. SCRAPE OFF FLAKING PAINT, PRIME, REPAINT ALL EXISTING FIRE ESCAPE AND THE ME | $608,860 |
| M01019323-I1-GC | 2024-11-14 | General construction | 565 BROOME STREET | HEREWITH FILING FOR LOCAL LAW FACADE REPAIRS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $26,000 |
| S01132043-I1-GC | 2024-11-13 | General construction | 1950 CLOVE ROAD | Masonry facade repair campaign to address cavity wall ties including the installation of post-installed anchors at brick cavity wall system. No change in use, egress or occupancy. | $250,000 |
| M01047664-I1-GC | 2024-11-01 | General construction | 307 EAST 44 STREET | Masonry facade repairs as per plans. No change in use, egress or occupancy. | $1,000,000 |
| M00973212-I1-GC | 2024-09-25 | General construction | 253 WEST 72 STREET | Masonry facade work as per plans to address conditions cited in the DOB and OATH Violations and the Cycle 9 FISP report. No change to use , egress, or occupancy. | $900,000 |
| M01037549-I1-GC | 2024-07-15 | General construction | 157 CHAMBERS STREET | Filing for facade repairs as per plans filed herewith. No change in use, egress, or occupancy. | $15,002 |
| M01051471-I1-GC | 2024-07-02 | General construction | 536 WEST 46 STREET | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $104,465 |
| M00903111-I1-GC | 2024-05-16 | General construction | 310 EAST 44 STREET | Masonry facade work as per plans, including addressing the conditions cited in ECB Violation 35674111L and Violation 39083802L. No change to use, egress, or occupancy. | $750,000 |
| M00922523-I1-GC | 2023-12-20 | General construction | 142 EAST 16 STREET | Garage repairs to include reinforced concrete repairs & traffic coatings. No change in use, egress or occupancy. | $42,000 |
| M00873129-I1-GC | 2023-12-08 | General construction | 206 EAST 87 STREET | Lentil Replacement at 1st floor. | $2,400 |
| M00915584-I1-GC | 2023-10-30 | General construction | 534 WEST 42 STREET | Facade repairs to include masonry replacement, repointing and crack repairs, concrete crack and patch repair. No change in use, egress or occupancy. | $20,840 |
| Q00943132-I1-GC | 2023-10-20 | General construction | 87-30 62 AVENUE | FILING IS MADE FOR THE INSTALLATION OF NEW STEEL SHELF ANGLES AND RETROFIT MASONRY VENEER ANCHORS AT THE SOUTH FACADE ONLY. NO CHANGE IN USE OCCUPANCY OR EGRESS (DIR 14). | $20,000 |
| Q00843533-I1-GC | 2023-10-19 | General construction | 88-01 NORTHERN BOULEVARD | Filing is made for the repair of select portions of the North, South, East, West facades, including face brick replacement and masonry joint repointing. No change in use, occupancy | $152,000 |
| Q00843548-I1-GC | 2023-10-19 | General construction | 32-45 88 STREET | Filing is made for the repair of select portions of the North, South, East, West facades, including face brick replacement and masonry joint repointing. No change in use, occupancy | $120,000 |
| B00893765-I1-GC | 2023-09-21 | General construction | 2220 BURNETT STREET | FILING IS MADE FOR THE REPAIR OF SELECT PORTIONS OF THE FACADE, INCLUDING FACE BRICK REPLACEMENT, MASONRY JOINT REPOINTING, & ASSOCIATED LINTELS & SILLS. NO CHANGE IN USE, OCCUPANC | $14,000 |
| Q00819169-I1-GC | 2023-09-21 | General construction | 112-01 QUEENS BOULEVARD | Facade restoration as per pans filed herewith | $619,975 |
| B00893756-I1-GC | 2023-09-14 | General construction | 2260 BURNETT STREET | FILING IS MADE FOR THE REPAIR OF SELECT PORTIONS OF THE FACADE, INCLUDING FACE BRICK REPLACEMENT, MASONRY JOINT REPOINTING, & ASSOCIATED LINTELS & SILLS. NO CHANGE IN USE, OCCUPANC | $28,000 |
| B00829076-I1-GC | 2023-09-06 | General construction | 1595 FULTON STREET | Filing exterior repairs including repointing and brick replacement. No change to use, egress or occupancy. | $729,500 |
| Q00843579-I1-GC | 2023-08-14 | General construction | 88-02 32 AVENUE | Filing is made for the repair of select portions of the North, South, East, West facades, including face brick replacement and masonry joint repointing. No change in use, occupancy | $224,000 |
| Q00843559-I1-GC | 2023-08-14 | General construction | 32-25 88 STREET | Filing is made for the repair of select portions of the North, South, East, West facades, including face brick replacement and masonry joint repointing. No change in use, occupancy | $288,000 |
| M00650092-I1-GC | 2023-07-27 | General construction | 160 WEST 71 STREET | Masonry facade work as per plans including windowsill work to assess and address ECB Violation 34071255L and DOB VIOL 040791CD1JG01. No change to use, egress, or occupancy. | $500,000 |
| Q00623894-I1-GC | 2023-06-14 | General construction | 86-19 ELMHURST AVENUE | FACADE REPAIR WORK. SCOPE INCLUDES REPLACEMENT OF CRACKED MASONRY, PARAPET REPLACEMENT, REPLACEMENT OF EXISTING STEEL LINTELS, CONCRETE SILL REPLACEMENT. SIDEWALK SHED FILED UNDER | $262,725 |
| Q00843556-I1-GC | 2023-06-06 | General construction | 32-40 89 STREET | Filing is made for the repair of select portions of the North, South, East, West facades, including face brick replacement and masonry joint repointing and select sill replacement. | $280,000 |
| Q00843570-I1-GC | 2023-06-06 | General construction | 32-20 89 STREET | Filing is made for the repair of select portions of the North, South, East, West facades, including face brick replacement and masonry joint repointing and select sill replacement. | $224,000 |
| M08048089-I1-GC | 2023-05-03 | General construction | 200 EAST 87 STREET | Exterior Facade restoration including brick replacement, repointing, sill replacement, and remove and install pavers at 18th floor terrace and roof. | $498,600 |
| M00842795-I1-GC | 2023-03-31 | General construction | 301 EAST 45 STREET | interior demolition including removal and infill of convenience stair in 1st floor commercial space | $5,000 |
| B00790434-S1-ST | 2023-02-13 | General construction | 767 FULTON STREET | REMOVE AND REPLACE REAR FACADE WALL AND WINDOWS WITH NEW, REPLACE PORTIONS OF FLOOR JOISTS AT REAR 2ND & 3RD FLOORS, REPAIR BRICK PIERS ON THE 1ST THRU THE 3RD FLOORS ALL AS PER PL | $100,000 |
| B00791750-S1-GC | 2023-02-04 | General construction | 769 FULTON STREET | REMOVE AND REPLACE REAR FACADE WALL AND WINDOWS WITH NEW, REPLACE PORTIONS OF FLOOR JOISTS AT REAR 2ND & 3RD FLOORS, REPAIR BRICK PIERS ON THE 1ST THRU THE 3RD FLOORS ALL AS PER PL | $100,000 |
| B00791750-S1-ST | 2023-01-25 | General construction | 769 FULTON STREET | REMOVE AND REPLACE REAR FACADE WALL AND WINDOWS WITH NEW, REPLACE PORTIONS OF FLOOR JOISTS AT REAR 2ND & 3RD FLOORS, REPAIR BRICK PIERS ON THE 1ST THRU THE 3RD FLOORS ALL AS PER PL | $100,000 |
| M00780817-I1-GC | 2023-01-10 | General construction | 535 WEST 48 STREET | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $97,200 |
| B00790434-S1-GC | 2022-11-03 | General construction | 767 FULTON STREET | REMOVE AND REPLACE REAR FACADE WALL AND WINDOWS WITH NEW, REPLACE PORTIONS OF FLOOR JOISTS AT REAR 2ND & 3RD FLOORS, REPAIR BRICK PIERS ON THE 1ST THRU THE 3RD FLOORS ALL AS PER PL | $100,000 |
| M00760555-I1-GC | 2022-10-01 | General construction | 226 WEST 26 STREET | MISCELLANEOUS MASONRY FACADE REPAIRS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $300,000 |
| Q00769005-I1-GC | 2022-09-30 | General construction | 153-25 88 STREET | Filing made for ext. repair of select portions of the ex. facade incl. face brick replacement, associated lintels & sills, mortar joint repointing, & select concrete patching (typi | $114,000 |
| Q00623839-I1-GC | 2022-09-20 | General construction | 75-06 WOODSIDE AVENUE | FACADE REPAIR WORK. SCOPE INCLUDES REPLACECMENT OF CRACKED MASONRY UNITS, MASONRY RE-POINTING, PARAPET REPLACEMENT, REPLACEMENT OF EXISTING STEEL LINTELS, REPAIR SPALLED CONCRETE, | $216,250 |
| B00652225-I1-GC | 2022-08-16 | General construction | 4407 4 AVENUE | Provide roof top replacement and replace awning over door | $140,960 |
| B00650079-I1-GC | 2022-08-08 | General construction | 4401 4 AVENUE | Provide roof top replacement and replace awning over door | $162,960 |
| M00702399-I1-GC | 2022-06-23 | General construction | 536 BROADWAY | FACADE RESTORATION INCLUDING BRICK REPLACEMENT, SILL REPLACEMENT, STONE PATCHING, STUCCO REPLACEMENT, WINDOW METAL OVERHANG REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE I NUSE, O | $126,350 |
| M00591900-I1-GC | 2022-06-22 | General construction | 401 EAST 80 STREET | EXTERIOR REPAIRS AT CONCRETE BALCONIES AND EYEBROWS, ROOF PARAPET, MASONRY AND BALCONY RAILINGS. CONCRETE REPAIRS AT SUB-CELLAR AND CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $748,083 |
| M00693119-I1-GC | 2022-05-25 | General construction | 50 ROCKEFELLER PLAZA | Filing herewith for replacement of the 14th floor roof as per plans. No change to use, egress or occupancy. | $650,000 |
| M00642607-I1-GC | 2022-05-06 | General construction | 157 CHAMBERS STREET | Filing for facade repairs as per plans filed herewith. No change in use, egress, or occupancy. | $298,684 |
| B00551212-I1-GC | 2022-04-14 | General construction | 1595 FULTON STREET | Proposed Modernization works of existing multiple family building as per plan under GC job# B00551212-I1. All related MEP filing will be filed under separate applications, PL # B00 | $1,652,780 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
