COMPANY RECORD · NEW YORK, NY
Ka&C Mech LLC — permit history in New York, NY
Ka&C Mech LLC appears on 49 New York permit records from 2022 through 2026, most often plumbing (89.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 49 | 89.1% |
| Fire protection | 6 | 10.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2022 | 2 |
| 2023 | 12 |
| 2024 | 3 |
| 2025 | 15 |
| 2026 | 23 |
Busiest year on record: 2026, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| C&A Seneca Construction | 5 | 2026-07-01 |
| All Purpose Services Inc | 3 | 2025-09-15 |
| Nyc Building Solutions Co | 2 | 2026-08-04 |
| Four Brothers General Con | 2 | 2026-05-29 |
| Four A's Construction LLC | 1 | 2026-06-04 |
| Quality Construction& Dev | 1 | 2026-08-25 |
| Qualified Constrn Inc | 1 | 2025-07-16 |
| Kjds Home Improvement LLC | 1 | 2024-04-09 |
| Kale Construction Inc | 1 | 2025-07-09 |
| Ej Homes 45 LLC | 1 | 2026-04-14 |
| Allcan Corp | 1 | 2025-11-03 |
| Craftmen Associated Corp | 1 | 2025-12-05 |
17 companies are named alongside Ka&C Mech LLC on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 455 86 STREET | 2026-08-25 |
| 597 HANCOCK STREET | 2026-08-04 |
| 680 EAST 138 STREET | 2026-07-13 |
| 2104 RYER AVENUE | 2026-07-06 |
| 62 THOMAS STREET | 2026-07-01 |
| 1084 FULTON STREET | 2026-06-04 |
| 405 WEST 23 STREET | 2026-06-02 |
| 1925 HOLLAND AVENUE | 2026-05-29 |
| 205 WEST 38 STREET | 2026-05-20 |
| 129 EAST 27 STREET | 2026-05-01 |
| 30 HUDSON YARDS | 2026-04-23 |
| 286 RUTLAND ROAD | 2026-04-14 |
| 103-08 METROPOLITAN AVENUE | 2026-03-23 |
| 72A UTICA AVENUE | 2026-03-09 |
46 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $300,000, median $16,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
49 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01243177-S1-PL | 2026-08-25 | Plumbing | 455 86 STREET | Installation of plumbing fixtures in adjacent existing location, NO GAS WORK. No change of use, egress, or occupancy. | $43,500 |
| B01390825-S1-PL | 2026-08-04 | Plumbing | 597 HANCOCK STREET | PLUMBING WORK ONLY IN CONJUNCTION WITH APPLICATION #B01390825-I1 | $81,000 |
| X01344876-S1-PL | 2026-07-13 | Plumbing | 680 EAST 138 STREET | application to change stove to commercial stove and correct the number of space heaters to two AND add new direct vent water heater | $15,000 |
| X01374966-S1-PL | 2026-07-06 | Plumbing | 2104 RYER AVENUE | plumbing work associated with initial fit out of existing cf space approved under NB 220708241 | $6,000 |
| M01342605-S3-PL | 2026-07-01 | Plumbing | 62 THOMAS STREET | INSTALLATION OF NEW DOMESTIC WATER HEATER, WATER/SANITARY/VENT/GAS SYSTEMS, AND PLUMBING FIXTURES, WITH ASSOCIATED PIPING FOR A RESTAURANT/BAR. NO CHANGE TO USE, EGRESS, OR OCCUPAN | $50,000 |
| B01289895-S1-PL | 2026-06-04 | Plumbing | 1084 FULTON STREET | Installation of new domestic hot water system and associated plumbing for a commercial tenant fit-out on the first floor. This includes 3 electric heaters, an accessible restroom, | $25,000 |
| M01336632-S1-PL | 2026-06-02 | Plumbing | 405 WEST 23 STREET | SUBSEQUENT FILING OF PLUMBING WORK IN CONJUNCTION WITH M01336632-I1. (DELI STORE) WORK INCLUDES INSTALLATION OF NEW BAGEL KETTLE, REVOLVING TRY OVEN AS PER THE PLAN HEREWITH. NO CH | $10,000 |
| X01341918-S1-PL | 2026-05-29 | Plumbing | 1925 HOLLAND AVENUE | REPLACEMENT OF EXISTING RESIDENTAL PLUMBING FIXTURES AT DWELLING UNITS AND INSTALLATION OF NAVIEN CONDENSING COMBI BOILER.NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $10,000 |
| M01264877-I1-PL | 2026-05-20 | Plumbing | 205 WEST 38 STREET | PLUMBING WORK IN CEL AND 1ST FLOOR FILED IN CONJUNCTION WITH DOB NOW MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $11,200 |
| M01372334-I1-PL | 2026-05-01 | Plumbing | 129 EAST 27 STREET | NO CHANGE IN BULK, FLOOR AREA OR OCCUPANCY UNDER THIS APPLICATION, SCOPE OF WORK TO INCLUDE REMOVAL OF EXISTING PLUMBING FIXTURES, INSTALLATION OF NEW PLUMBING FIXTURES & GAS COOKI | $76,000 |
| M01361828-S2-PL | 2026-04-23 | Plumbing | 30 HUDSON YARDS | PLUMBING AND SPRINKLER WORK FOR THE RENOVATION OF THE EXISTING 68TH FLOOR PHASE 2 OF AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $300,000 |
| M01361828-S2-PL | 2026-04-23 | Fire protection | 30 HUDSON YARDS | PLUMBING AND SPRINKLER WORK FOR THE RENOVATION OF THE EXISTING 68TH FLOOR PHASE 2 OF AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $300,000 |
| B01355225-S1-PL | 2026-04-14 | Plumbing | 286 RUTLAND ROAD | PLUMBING WORK ONLY IN CONJUNCTION WITH APPLICATION #B01355225-I1 | $37,500 |
| Q01362646-S1-PL | 2026-03-23 | Plumbing | 103-08 METROPOLITAN AVENUE | INSTALLATION OF PLUMBING FIXTURES FOR ACCESIBLE TOILET AND NON-RESIDENTIAL SINKS FOR JUICE BARS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $12,000 |
| B01360213-S1-PL | 2026-03-09 | Plumbing | 72A UTICA AVENUE | PLUMBING WORK ONLY IN CONJUNCTION WITH APPLICATION #B01360213-I1 | $24,000 |
| B01195768-I1-PL | 2026-02-25 | Plumbing | 2249 STRAUSS STREET | Plumbing work at cellar level: removal of kitchen and shower, and installation of slop sink and two piece bathroom. Installation of a new gas meter to serve existing boiler and hot | $9,500 |
| B00835446-I1-PL | 2026-02-11 | Fire protection | 1037 EAST 80 STREET | Install new sprinkler system with new fire service indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application. | $77,800 |
| B00835446-I1-PL | 2026-02-11 | Plumbing | 1037 EAST 80 STREET | Install new sprinkler system with new fire service indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application. | $77,800 |
| M01330559-S2-PL | 2026-01-25 | Fire protection | 30 HUDSON YARDS | PLUMBING AND SPRINKLER WORK FOR THE RENOVATION OF THE EXISTING 68TH FLOOR PHASE 1 OF AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $300,000 |
| M01330559-S2-PL | 2026-01-25 | Plumbing | 30 HUDSON YARDS | PLUMBING AND SPRINKLER WORK FOR THE RENOVATION OF THE EXISTING 68TH FLOOR PHASE 1 OF AN EXISTING BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $300,000 |
| X01114365-S1-PL | 2026-01-21 | Plumbing | 2467 ARTHUR AVENUE | modification/new plumbing fixtures in conjunction of commercial renovation | $18,000 |
| Q00903605-S1-PL | 2026-01-12 | Plumbing | 102-35 135 STREET | AMENDMENT FILED TO CORRECT FIXTURE TYPES TO BE INSTALLED. | $4,500 |
| B01264123-S1-PL | 2026-01-07 | Plumbing | 704 FENIMORE STREET | PL work is filed. | $70,604 |
| B01255529-S1-PL | 2025-12-05 | Plumbing | 276 EAST 95 STREET | REMOVE ILLEGAL THREE PIECE BATHROOM AND INSTALL TWO PIECE POWDER ROOM IN ACCORDANCE WITH ECB VIOLATIONS 39152832Z, 39152833K, 39152834M, 39152835Y & 39152836X. NO CHANGE IN OCCUPAN | $2,100 |
| M01205873-S1-PL | 2025-11-03 | Plumbing | 205 WEST 139 STREET | Plumbing modifications associated with interior renovation. No change to use, egress or occupancy. | $26,000 |
| B00990384-S1-PL | 2025-09-15 | Plumbing | 2478 BRIGHAM STREET | EXISTING 3 FIXTURE BATHROOM TO REMAIN, EXISTING KITCHEN SINK TO BE REMOVED, EXISTING GAS STOVE AND GAS PIPE TO BE REMOVED, FLOOR DRAIN AT CONCRETE STAIR TO REMAIN, AND TO CORRECT E | $3,500 |
| X01235514-S1-PL | 2025-09-04 | Plumbing | 2758 LATTING STREET | Plumbing permit for (1) new bath in basement | $10,000 |
| B01185436-S1-PL | 2025-07-16 | Plumbing | 192 GRAND STREET | SUBSEQUENCE FILED FOR PLUMBING WORK TYPE FOR FIRST FLOOR RESTAURANT & APT. # 3R,4R (AT 3RD AND 4TH FLOOR) AS PER PLAN. | $35,000 |
| X01209965-I1-PL | 2025-07-15 | Plumbing | 3748 THIRD AVENUE | FILING TO PERFORM INTEGRITY TEST ON EXISTING GAS LINE AT EXISTING COMMERCIAL KITCHEN. WORK BEING DONE TO OBTAIN GAS TURN-ON FROM CON ED. REPAIR/REPLACE GAS LINE IF NEEDED. NO OT | $4,000 |
| B01212540-S1-PL | 2025-07-09 | Plumbing | 5002 KINGS HIGHWAY | TO INSTALL NEW PLUMBING & GAS FIXTURE FOR NEW RESTAURANT ON 001FLOOR WITH PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY. | $60,000 |
| M82540181-S1-PL | 2025-07-02 | Plumbing | 11 WEST 42 STREET | MH WORK FILED ON THE 1ST FLOOR AT THE STOREFRONT. ORIGINAL APPLICATION WAS UNDER JOB#M08016782. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $12,500 |
| X01078837-I1-PL | 2025-04-10 | Plumbing | 384 EAST 149 STREET | PLUMBING WORK FILED AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $2,500 |
| B00782504-S1-PL | 2025-04-02 | Plumbing | 778 HALSEY STREET | DRAWINGS ARE FILED TO RELOCATE EXISTING LAUNDRY AREA - WASHING MACHINE AND FOR INSTALLATION OF NEW TOILET ROOM AND ASSOCIATED PIPING IN THE CELLAR ONLY (RELATED CONSTRUCTION APPLIC | $15,000 |
| X01017243-I1-PL | 2025-03-17 | Plumbing | 959 WESTCHESTER AVENUE | NEW GAS METER AND SPACE HEATER. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $2,500 |
| Q01098700-S1-PL | 2025-03-07 | Plumbing | 9704 38 AVENUE | LEGALIZATION OF 3 PC BATHROOM AT CELLAR TO CURE ECB VIOLATION 34625146Y. NO CHANGE IN USE, OCCUPANCY AND OR EGRESS UNDER THIS APPLICATION. | $0 |
| B00835461-I1-PL | 2025-02-26 | Plumbing | 1037 EAST 80 STREET | Plumbing work at basement indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application . | $18,000 |
| B00949665-S1-PL | 2025-02-24 | Plumbing | 97 EAST 59 STREET | PROPOSED INSTALLATION AND REPLACEMENT OF PLUMBING FIXTURES AND RELATED PIPING AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $10,500 |
| X01146303-I1-PL | 2025-02-24 | Plumbing | 2020 WILLIAMSBRIDGE ROAD | NO WORK APPLICATION TO LEGALIZE 2 HVAC UNITS ON THE FIRST FLOOR. PLUMBERS TO PERFORM GAS PRESSURE TEST ON GAS PIPES. SHOW LEGALITY OF EXISTING UNITS ON THE ROOF. NO CHANGE TO EGRES | $0 |
| Q01058600-S1-PL | 2024-07-11 | Plumbing | 30-73 STEINWAY STREET | ASSOCIATED PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR CONSTRUCTION OF NEW CAFE / LOUNGE, INCLUDING MINOR PARTITION WORK AND INSTALLATION OF NEW EQUIPMENT. NO CHANGE IN USE, | $17,000 |
| M01009082-I1-PL | 2024-05-13 | Plumbing | 27 WEST 125 STREET | NEW GAS METER | $12,000 |
| B00954714-S1-PL | 2024-04-09 | Plumbing | 785 HART STREET | INSTALLATION OF NEW PLUMBING FIXTURES ON THE 1ST FLOOR AT 785 HART STREET IN CONJUNCTION WITH GC APPLICATION #B00954714-I1 | $10,000 |
| M00889099-I1-PL | 2023-11-09 | Plumbing | 17 WEST 125 STREET | New Gas Meter | $10,000 |
| X00864766-I1-PL | 2023-10-31 | Plumbing | 1411 BRONX RIVER AVENUE | INSTALLATION OF GAS PIPING AND GAS METER FOR AN EXISTING STORE IN AN EXISTING ONE STORY STREET MALL BUILDING. PLUMBING WORK PER PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR | $12,500 |
| S00887306-I1-PL | 2023-08-15 | Plumbing | 1690 HYLAN BOULEVARD | WATER/SANITARY 1FL. PLUMBING WORK ASSOCIATED WITH GC AND MS APPLICATIONS FILED SEPARATELY FOR ORANGETHEORY FITNESS. | $24,000 |
| X00900786-I1-PL | 2023-07-25 | Plumbing | 590 EAST 169 STREET | Plumbing work existing restarunt (replace & install new non residential equipment) as per plan no change use,egress and occupancy | $27,000 |
| B00394858-I1-PL | 2023-06-14 | Plumbing | 671 SHEFFIELD AVENUE | APPLICATION FILED IN CONJUNCTION WITH JOB# 340764998 TO LEGALIZE 3 PIECE BATHROOM AND LAUNDRY AREA AT CELLAR LEVEL. NO CHANGES OF USE, EGRESS OR OCCUPANCY. | $0 |
| M08051226-I1-PL | 2023-05-26 | Plumbing | 565 WEST 144 STREET | PL work type filed in-conjunction with OT filing#M08050793 in order to install plumbing fixtures for pizza restaurant and commercial cooking equipment with gas riser from cel-1fl. | $16,000 |
| B00852507-I1-PL | 2023-04-27 | Plumbing | 8324 3 AVENUE | Installation of new GAS COOKING EQUIPMENT. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. See Comment#24 | $16,500 |
| B00462910-I1-PL | 2023-02-17 | Plumbing | 29 NORTH ELLIOTT PLACE | PLUMBING WORK FOR HORIZONTAL AND VERTICAL ENLARGEMENT TO ADD 2MORE FLOORS AND CONVERT BUILDING FROM 2-FAMILY TO 4-FAMILY CREATE NEW STEEL STRUCTURE TO CONVERT BUILDING FROM FRAME | $56,000 |
| B08030009-I1-EW-SP | 2023-02-09 | Fire protection | 1545 ATLANTIC AVENUE | IMC NUC CAM: SPRINKLER AND PLUMBING MODIFICTATIONS TO ACCOMMODATE ALTERATIONS TO THE NUCLEAR CAMERA SUITE WITHIN THE EXISTING HOSPITAL BUILDING AS INDICATED ON PLANS FILED HEREWITH | $50,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
