COMPANY RECORD · NEW YORK, NY
Jyny Construction Corp — permit history in New York, NY
Jyny Construction Corp appears on 26 New York permit records from 2021 through 2026, most often general construction (65.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 21 | 65.6% |
| Mechanical / HVAC | 11 | 34.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 9 |
| 2022 | 6 |
| 2023 | 5 |
| 2024 | 5 |
| 2025 | 5 |
| 2026 | 2 |
Busiest year on record: 2021, with 9 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Bt's Plumbing And Heating | 3 | 2026-05-01 |
| Xh&Rc Plbg And Htg Inc | 3 | 2025-09-29 |
| All Pro Plbg & Htg Inc | 2 | 2025-07-23 |
| J. Caiazzo Plbg & Htg Cor | 1 | 2021-02-16 |
| Village P & H Ny Inc | 1 | 2024-03-18 |
5 companies are named alongside Jyny Construction Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1701 GATES AVENUE | 2026-03-19 |
| 143-08 85 DRIVE | 2025-10-31 |
| 147-16 75 AVENUE | 2025-06-27 |
| 84-16 193 STREET | 2025-04-30 |
| 60-11 WALDRON STREET | 2025-03-04 |
| 939 WHEELER AVENUE | 2024-06-21 |
| 156-40 CROSS BAY BOULEVARD | 2024-04-11 |
| 67-20 SPRINGFIELD BOULEVARD | 2024-03-21 |
| 34-25 42 STREET | 2024-03-14 |
| 23-10 160 STREET | 2023-08-18 |
| 32-15 212 STREET | 2023-04-04 |
| 216-06 67 AVENUE | 2023-02-17 |
| 69-17 HARROW STREET | 2022-08-18 |
| 3030 LAWTON AVENUE | 2022-06-17 |
24 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $727,860, median $72,115. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
26 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01371474-I1-GC-CX | 2026-03-19 | General construction | 1701 GATES AVENUE | INTERIOR RENOVATION OF EXISTING THREE STORY HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $200,500 |
| Q01371474-I1-GC-CX | 2026-03-19 | Mechanical / HVAC | 1701 GATES AVENUE | INTERIOR RENOVATION OF EXISTING THREE STORY HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $200,500 |
| Q01096841-I1-GC-CX | 2025-10-31 | General construction | 143-08 85 DRIVE | Application herewith filed to erect front enlargement at 1st floor and install a roof over existing deck at rear of 1st floor. No change to use, egress or occupancy. | $50,000 |
| Q01187839-I1-GC-CX | 2025-06-27 | General construction | 147-16 75 AVENUE | APPLICATION IS FILED TO CONVERT AN EXISTING ONE FAMILY DWELLING TO TWO FAMILY DWELLING ALONG WITH INTERIOR RENOVATION AS SHOWN ON PLANS. NO CHANGE IN BULK. | $94,500 |
| Q01187839-I1-GC-CX | 2025-06-27 | Mechanical / HVAC | 147-16 75 AVENUE | APPLICATION IS FILED TO CONVERT AN EXISTING ONE FAMILY DWELLING TO TWO FAMILY DWELLING ALONG WITH INTERIOR RENOVATION AS SHOWN ON PLANS. NO CHANGE IN BULK. | $94,500 |
| Q01184271-I1-GC | 2025-04-30 | General construction | 84-16 193 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF AN EXISTING ONE FAMILY DWELLING UNIT, NO CHANGE IN BULK IS PROPOSED. | $539,500 |
| Q00380183-S1-MS | 2025-03-04 | Mechanical / HVAC | 60-11 WALDRON STREET | Installation of Mechanical units in conjunction with Alt1 421958714. | $39,000 |
| X01027496-I1-GC-CX | 2024-06-21 | General construction | 939 WHEELER AVENUE | CONVERSION AN EXISTING ONE-FAMILY INTO A THREE-FAMILY. NO BULK CHANGES. | $80,500 |
| X01027496-I1-GC-CX | 2024-06-21 | Mechanical / HVAC | 939 WHEELER AVENUE | CONVERSION AN EXISTING ONE-FAMILY INTO A THREE-FAMILY. NO BULK CHANGES. | $80,500 |
| Q00934453-S2-MS | 2024-04-11 | Mechanical / HVAC | 156-40 CROSS BAY BOULEVARD | INSTALLATION OF SPLIT SYSTEM UNITS | $14,000 |
| Q01008918-I1-GC | 2024-03-21 | General construction | 67-20 SPRINGFIELD BOULEVARD | PROPOSE INTERIOR RENOVATION WITH MINOR PARTITION WORK AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $19,000 |
| Q00680609-I1-GC | 2024-03-14 | General construction | 34-25 42 STREET | JOB APPLICATION FILED TO LEGALIZE FRONT ENTRANCE STOOP REMOVAL DUE TO REQUIRED REPAIR AND REPLACED WITH EXISTING MATCHING BRICK AND CONCRETE STOOP IN ORDER TO RESCIND STOP WORK ORD | $0 |
| Q00934453-I1-GC | 2023-11-13 | General construction | 156-40 CROSS BAY BOULEVARD | interior renovation to existing commercial space, no change to use, egress, occupancy or bulk | $76,230 |
| Q00919831-I1-GC-CX | 2023-08-18 | Mechanical / HVAC | 23-10 160 STREET | INTERIOR RENOVATION IN AN EXISTING SINGLE-FAMILY DETACHED RESIDENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $88,160 |
| Q00919831-I1-GC-CX | 2023-08-18 | General construction | 23-10 160 STREET | INTERIOR RENOVATION IN AN EXISTING SINGLE-FAMILY DETACHED RESIDENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $88,160 |
| Q00813182-I1-GC-CX | 2023-04-04 | General construction | 32-15 212 STREET | APPLICATION FILED TO INTERIOR RENOVATIONOF EXISTING ONE FAMILYDWELLING. | $100,000 |
| Q00807418-I1-GC | 2023-02-17 | General construction | 216-06 67 AVENUE | INTERIOR RENOVATION EXISTING APARTMENT WITH PARTITION WORK AT 1ST AND 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $24,000 |
| Q00690312-I1-GC | 2022-08-18 | General construction | 69-17 HARROW STREET | RENOVATION OF EXISTING ONE FAMILY HOUSE , NO CHANGE IN USE, EGRESS OR OCCUPANCY | $281,250 |
| X00741210-I1-GC-CX | 2022-06-17 | General construction | 3030 LAWTON AVENUE | APPLICATION IS FILED FOR INSTALLATION OF NEW WINDOW INSTEAD OF GARAGE DOOR IN THE BASEMENT. CONVERSION FROM ONE FAMILY TO TWO ALONG WITH INTERIOR RENOVATION. | $34,560 |
| X00741210-I1-GC-CX | 2022-06-17 | Mechanical / HVAC | 3030 LAWTON AVENUE | APPLICATION IS FILED FOR INSTALLATION OF NEW WINDOW INSTEAD OF GARAGE DOOR IN THE BASEMENT. CONVERSION FROM ONE FAMILY TO TWO ALONG WITH INTERIOR RENOVATION. | $34,560 |
| Q00385704-I1-MS | 2022-05-04 | Mechanical / HVAC | 58-13 186 STREET | FILE MH WORKTYPE IN CONJUNCTION WITH ALT-1 JOB# 440612963 | $6,500 |
| B00553913-I1-MS | 2022-05-04 | Mechanical / HVAC | 1180 HANCOCK STREET | MECHANICAL WORK IN CONJUNCTION WITH ALTERATION TYPE 1 JOB # 321269881. | $1,000 |
| Q00665581-I1-GC | 2022-02-08 | General construction | 153-33 ROCKAWAY BOULEVARD | INSTALL MINOR SHEETROCK , GLASS PANEL PARTITIONS IN EXISTING OFFICE (CO#172062). NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $150,000 |
| Q00628263-I1-GC | 2021-11-23 | General construction | 219-52 67 AVENUE | MINOR INTERIOR RENOVATION , MINOR PARTITION CHANGES WITH INTERIOR FINISH WORK FIRST & SECOND FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $68,000 |
| Q00573697-I1-MS | 2021-11-09 | Mechanical / HVAC | 114-06 ROCKAWAY BEACH BOULEVARD | RENOVATE EXISTING RETAIL TENANT SPACE, INCLUDING NEW DISTRIBUTION DUCTWORK FOR EXISTING AIR HANDLING UNITS, AND NEW ENERGY RECOVERY VENTILATOR FOR MECHANICAL VENTILATION. | $12,000 |
| Q00570808-I1-GC-CX | 2021-10-20 | Mechanical / HVAC | 67-14 172 STREET | EXISTING ONE FAMILY ENLARGEMENT AND ALTERATION PER PLANS SUBMITTED, OBTAIN NEW C OF O. | $727,860 |
| Q00570808-I1-GC-CX | 2021-10-20 | General construction | 67-14 172 STREET | EXISTING ONE FAMILY ENLARGEMENT AND ALTERATION PER PLANS SUBMITTED, OBTAIN NEW C OF O. | $727,860 |
| Q00494431-I1-GC | 2021-08-02 | General construction | 69-20 178 STREET | HEREWITH FILE ALTERATION TYPE ONE IN ORDER TO A VERTICAL EXTENSION TO AN EXISTING TWO STORY ONE FAMILY DWELLING. TO ERECT INTERIOR PARTITIONS, TO DO MECHANICAL WORK, PLUMBING AND S | $434,000 |
| Q00502936-I1-GC | 2021-07-07 | General construction | 114-06 ROCKAWAY BEACH BOULEVARD | Application filed to convert existing commercial space to Pet shop with Grooming and dog daycare as per plans. No change of use, egress or Occupancy. | $66,000 |
| Q00505571-I1-GC | 2021-04-23 | General construction | 68-15 BELL BOULEVARD | INTERIOR RENOVATION OF EXISTING ONE FAMILY APT. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $18,000 |
| Q00451984-I1-GC | 2021-02-08 | General construction | 68-35 218 STREET | JOB FILED FOR EXIST. CO-OP UNIT INTERIOR RENOVATION, INCLUDING MINOR NON-BEARING PARTITION, NEW WOOD FLOOR. PLUMBING WOK FILED IN DIFFERENT JOB. NO CHANGE OF USE, EGRESS, OR OCCUPA | $25,000 |
| Q00461954-I1-GC | 2021-02-02 | General construction | 216-57 68 AVENUE | INTERIOR RENOVATION OF EXISTING ONE FAMILY APPARTMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $5,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
