COMPANY RECORD · NEW YORK, NY
Joanne's Construction Co — permit history in New York, NY
Joanne's Construction Co appears on 29 New York permit records from 2021 through 2026, most often general construction (65.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 21 | 65.6% |
| Mechanical / HVAC | 11 | 34.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 2 |
| 2022 | 3 |
| 2023 | 6 |
| 2024 | 12 |
| 2025 | 4 |
| 2026 | 5 |
Busiest year on record: 2024, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Rolando Mechanical Of Ny | 8 | 2024-03-07 |
| Smart Plbg & Htg Corp | 4 | 2024-09-20 |
| Flint Mechanical Corp | 2 | 2024-11-26 |
| Just Plbg & Htg Inc | 2 | 2026-05-15 |
| A & E Plumbing Corp | 1 | 2024-05-07 |
| Aura Plumbing Inc | 1 | 2025-02-07 |
| Nickos Construction Inc | 1 | 2024-01-12 |
| Proto P&H Services Corp | 1 | 2026-05-15 |
8 companies are named alongside Joanne's Construction Co on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 21-15 29 STREET | 2026-08-27 |
| 23-13 32 STREET | 2026-08-03 |
| 20-11 35 STREET | 2026-02-19 |
| 28-17 DITMARS BOULEVARD | 2025-12-17 |
| 21-14 23 AVENUE | 2025-10-24 |
| 24-58 37 STREET | 2025-09-29 |
| 23-29 32 STREET | 2025-07-22 |
| 2041 STRAUSS STREET | 2024-10-11 |
| 25-06 23 AVENUE | 2024-10-02 |
| 25-07 23 AVENUE | 2024-07-11 |
| 21-18 23 STREET | 2024-07-02 |
| 23-69 24 STREET | 2024-04-25 |
| 2808 ST THERESA AVENUE | 2024-04-11 |
| 3633 KINGSBRIDGE AVENUE | 2024-04-03 |
24 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $1,471,680, median $136,818. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
29 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01247196-S3-MS | 2026-08-27 | Mechanical / HVAC | 21-15 29 STREET | MS-Mechanical Systems work related to the interior renovation of a two family building incl. the installation of a 36,000btu/h wall-mounted condensing unit & 4 ceiling mounted duct | $18,000 |
| Q01313668-I1-GC | 2026-08-03 | General construction | 23-13 32 STREET | REMOVAL OF AN ILLEGAL FULL-PARTITION WALL AND ELIMINATION OF AN UNAUTHORIZED BEDROOM ON THE FIRST FLOOR TO COMPLY WITH ECB VIOLATION 35719503R. | $10,000 |
| Q01247196-I1-GC | 2026-04-22 | General construction | 21-15 29 STREET | Horizontal extension and interior gut-renovation to existing 2nd FL residential unit, incl. front facade alterations | $232,000 |
| Q01354398-I1-GC-CX | 2026-02-19 | General construction | 20-11 35 STREET | Renovate kitchen, cellar, & 2 bathrooms. Furr front & rear walls, w/additional insulation. New windows & interior doors. Remove radiators, HWH, & boiler. New HVAC system & HWH. New | $180,000 |
| Q01354398-I1-GC-CX | 2026-02-19 | Mechanical / HVAC | 20-11 35 STREET | Renovate kitchen, cellar, & 2 bathrooms. Furr front & rear walls, w/additional insulation. New windows & interior doors. Remove radiators, HWH, & boiler. New HVAC system & HWH. New | $180,000 |
| Q00605066-S3-MS | 2025-12-17 | Mechanical / HVAC | 28-17 DITMARS BOULEVARD | Installation of new HVAC Equipment, Ductwork, Controls and piping | $60,000 |
| Q01238664-I1-GC-CX | 2025-10-24 | General construction | 21-14 23 AVENUE | 1. Reinforcing the first floor by adding new steel columns and beams in the cellar. 2. Replacing the window lintels on the front facade of the second floor. 3. No changes in use, e | $16,750 |
| Q01089908-I1-GC | 2025-09-29 | General construction | 24-58 37 STREET | WE PROPOSE TO CONVERT AN EXISITING TWO STORY ONE FAMILY DWELLING TO A THREE STORY TWO FAMILY DWELLING WITH NEW PLUMBING FIXTURES. | $367,000 |
| Q01204445-I1-GC | 2025-07-22 | General construction | 23-29 32 STREET | INTERIOR RENOVATIONAND CONVERSION ONE TO TWO FAMILY AND RESOLVED ECB VIOLATION #39141745R | $144,636 |
| B00938008-S6-MS | 2024-10-11 | Mechanical / HVAC | 2041 STRAUSS STREET | Install mechanical system in conjunction with Alt CO | $1,000 |
| Q00614938-I1-GC-CX | 2024-10-02 | Mechanical / HVAC | 25-06 23 AVENUE | HORIZONTAL AND VERTICAL EXTENSION OFEXISTING TWO STORY - 2 FAMILY TO THREE STORY - 2 FAMILY BUILDING. | $267,380 |
| Q00614938-I1-GC-CX | 2024-10-02 | General construction | 25-06 23 AVENUE | HORIZONTAL AND VERTICAL EXTENSION OFEXISTING TWO STORY - 2 FAMILY TO THREE STORY - 2 FAMILY BUILDING. | $267,380 |
| Q00941192-I1-GC | 2024-07-11 | General construction | 25-07 23 AVENUE | PROPOSED 2- TO 1-FAMILY CONVERSION, 3RD FLOOR VERTICAL ENLARGEMENT & 2ND STORY FRONT ADDITION. | $500,000 |
| Q08025657-I1-MS | 2024-07-02 | Mechanical / HVAC | 21-18 23 STREET | NEW MECHANICAL SYSTEM (AC SPLIT UNITS) IN CONJUCTION WITH ALT-1 WORK | $42,300 |
| Q01037242-I1-GC-CX | 2024-04-25 | Mechanical / HVAC | 23-69 24 STREET | Interior renovation of 1st & 2nd floor apartments and basement. New heating system. Non-bearing partition removal and construction. New bathrooms, kitchens and basement windows. | $300,000 |
| Q01037242-I1-GC-CX | 2024-04-25 | General construction | 23-69 24 STREET | Interior renovation of 1st & 2nd floor apartments and basement. New heating system. Non-bearing partition removal and construction. New bathrooms, kitchens and basement windows. | $300,000 |
| X00653949-I1-GC | 2024-04-11 | General construction | 2808 ST THERESA AVENUE | Proposed new four story, residential building. | $300,000 |
| X00488566-I1-MS | 2024-04-03 | Mechanical / HVAC | 3633 KINGSBRIDGE AVENUE | Install mechanical systems in conjunction with NB#220711264. There is no change in use, occupancy, or egress. | $1,000 |
| B00938008-I1-GC | 2024-03-18 | General construction | 2041 STRAUSS STREET | PROPOSED 2-TO-4 FAMILY CONVERSION WITH VERTICAL EXTENSION & FRONT & REAR ADDITIONS | $914,850 |
| Q00829893-S1-MS | 2024-02-21 | Mechanical / HVAC | 25-14 21 STREET | Install mechanical systems per the plans filed herewith and subsequent to job#Q00829893-I1. | $1,000 |
| Q00787980-I1-GC | 2024-02-08 | General construction | 39-15 BELL BOULEVARD | Change the Occupancy of the 2nd Floor from 2-Apts to Offices UG 6. Misc. partitions and plumbing in conjunction (plumbing under separate application). All as per accompanying plan | $73,658 |
| Q00829893-I1-GC | 2023-09-21 | General construction | 25-14 21 STREET | PROPOSED 4-STORY & CELLAR 8-FAMILY MULTIPLE DWELLING. | $1,471,680 |
| Q00860685-I1-GC | 2023-05-18 | General construction | 23-80 27 STREET | INTERIOR RENOVATION OF 1ST FLOOR APT. MINOR PARTITION REMOVAL & CONSTRUCTION. NEW KITCHEN & BATHROOM. NEW HARDWOOD FLOORING. | $129,000 |
| Q00610799-I1-GC-CX | 2023-02-28 | General construction | 43-21 54 STREET | HEREWITH FILE A THREE (3) STORY TW0(2) FAMILY ATTACHED RESIDENTIAL BUILDING WITH CELLAR. | $102,210 |
| Q00610775-I1-GC-CX | 2023-02-28 | General construction | 43-19 54 STREET | Construct A THREE (3) STORY TW0(2) FAMILY ATTACHED RESIDENTIAL BUILDING WITH CELLAR. | $102,210 |
| Q00506234-I1-MS | 2023-02-28 | Mechanical / HVAC | 43-19 54 STREET | INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS #421800340. | $1,000 |
| Q00506249-I1-MS | 2023-02-28 | Mechanical / HVAC | 43-21 54 STREET | INSTALLATION OF MECHANICAL SYSTEMS, EQUIPMENT AND DUCTWORK THROUGH-OUT NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 421800322. | $1,000 |
| Q00792028-I1-GC | 2022-09-12 | General construction | 36-09 DITMARS BOULEVARD | MINOR INTERIOR RENOVATION TO EXISTING STORE. REMOVAL AND CONSTRUCTION OF NON-BEARING PARTITIONS. NEW FINISH FLOOR. | $10,850 |
| Q00769981-I1-GC | 2022-07-23 | General construction | 22-64 37 STREET | RENOVATION OF CELLAR & 2 DWELLING UNITS. NEW BULKHEAD STAIR TO ROOF, EXTERIOR STAIR TO CELLAR, & FRONT PORCH. | $476,200 |
| B00623763-I1-GC | 2022-01-11 | General construction | 487 DRIGGS AVENUE | Replace existing storefront and front door with new. Partial demolition No change to use, egress or occupancy. | $20,000 |
| Q00526722-I1-GC | 2021-06-23 | General construction | 22-55 36 STREET | RENOVATION OF EXISTING 2-STY & CELLAR. NEW NON-BEARING PARTITIONS, KITCHEN CABINETRY, ELECTRICAL, WINDOWS & DOORS. | $361,500 |
| Q00539800-I1-GC | 2021-06-23 | General construction | 147-03 7 AVENUE | CELLAR & 1ST FLOOR RENOVATION. EXISTING FRONT PORCH ENCLOSURE. NEW WINDOWS & NEW OPEN PORCHES. | $179,620 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
