COMPANY RECORD · NEW YORK, NY
Hnl Construction Company — permit history in New York, NY
Hnl Construction Company appears on 76 New York permit records from 2019 through 2026, most often general construction (57.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 44 | 57.1% |
| Mechanical / HVAC | 33 | 42.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 9 |
| 2021 | 7 |
| 2022 | 13 |
| 2023 | 14 |
| 2024 | 10 |
| 2025 | 13 |
| 2026 | 10 |
Busiest year on record: 2023, with 14 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Ace-Atlas Plbing & Htg | 2 | 2024-12-11 |
| J. Caiazzo Plbg & Htg Cor | 1 | 2021-03-26 |
| Mps Plumbing & Heating In | 1 | 2025-07-21 |
| Qmb Plumbing & Heating In | 1 | 2023-11-09 |
| Signa Development Corp | 1 | 2025-03-26 |
5 companies are named alongside Hnl Construction Company on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 9 MONROE PLACE | 2026-07-09 |
| 142 ST JAMES PLACE | 2026-06-29 |
| 211 7 AVENUE | 2026-06-08 |
| 314 LAFAYETTE AVENUE | 2026-05-18 |
| 693 FIFTH AVENUE | 2026-05-13 |
| 242 LAFAYETTE STREET | 2026-04-27 |
| 1998 SECOND AVENUE | 2026-03-24 |
| 145 HICKS STREET | 2026-03-16 |
| 484 WEST 43 STREET | 2025-12-18 |
| 119 SPRING STREET | 2025-08-12 |
| 177 CANAL STREET | 2025-07-17 |
| 400 WEST 43 STREET | 2025-07-11 |
| 12 WEST 18 STREET | 2025-06-10 |
| 30 3 AVENUE | 2025-04-07 |
58 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $4,900 to $530,006, median $42,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
76 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01415369-I1-GC | 2026-07-09 | General construction | 9 MONROE PLACE | Interior Renovation. No change of use, egress or occupancy under this application. | $49,500 |
| B01223209-I1-MS | 2026-06-29 | Mechanical / HVAC | 142 ST JAMES PLACE | MECHANICAL FOR INTERIOR WORK INCLUDING 1-STORY HORIZONTAL ADDITION | $68,000 |
| M01097632-S2-MS | 2026-06-08 | Mechanical / HVAC | 211 7 AVENUE | Propose mechanical work for 1st commercial space of eating & drinking establishment as per plan. No change in use, egress, or occupancy. | $50,000 |
| B08031124-I1-MS | 2026-05-18 | Mechanical / HVAC | 314 LAFAYETTE AVENUE | Installation of Split/AC system & ductwork for new (1) family house. No change of use, egress or occupancy under this application. | $84,000 |
| M01371858-S2-MS | 2026-05-13 | Mechanical / HVAC | 693 FIFTH AVENUE | NEW DUCTWORK FOR EXISTING FAN COIL UNIT, NEW SPLIT SYSTEM HEAT PUMP, 2 TOILET EXHAUST FANS & DUCTWORK | $37,000 |
| M01130208-I1-MS | 2026-04-27 | General construction | 242 LAFAYETTE STREET | GC: RENO EXIST APT 3S, REFURBISH KITCHEN & 2 BATHS, NEW NON LOAD BEARING PARTTIONS, NEW FLOORING NEW TILE @ BATHS, NEW LIGHTING THROUGHOUT - MH: NEW SPLIT SYSTEM HEAT PUMP HVAC UN | $156,000 |
| M01130208-I1-MS | 2026-04-27 | Mechanical / HVAC | 242 LAFAYETTE STREET | GC: RENO EXIST APT 3S, REFURBISH KITCHEN & 2 BATHS, NEW NON LOAD BEARING PARTTIONS, NEW FLOORING NEW TILE @ BATHS, NEW LIGHTING THROUGHOUT - MH: NEW SPLIT SYSTEM HEAT PUMP HVAC UN | $156,000 |
| B08030601-I1-GC | 2026-04-24 | General construction | 314 LAFAYETTE AVENUE | Convert existing four-family dwelling to a two-family dwelling. Install partitions, doors, walls, and floor finishes to obtain a new C of O. | $426,500 |
| M01350991-S2-MS | 2026-03-24 | Mechanical / HVAC | 1998 SECOND AVENUE | Mech work related to renovation of existing commercial space Installation 8 ton split HVAC units with ductwork & 1 bathroom exhaust fans & ductwork | $42,000 |
| B01325425-I1-MS | 2026-03-16 | Mechanical / HVAC | 145 HICKS STREET | Mechanical for interior work for Apt#B60 including 1 story horizontal addition. No change of use, egress or occupancy under this application. | $32,000 |
| B01171483-I1-GC | 2025-12-19 | General construction | 142 ST JAMES PLACE | Convert 3 family dwelling to 2 family dwelling. New horizontal enlargement in the rear of building. Install partitions, windows, doors, wall and floor finishes. | $412,957 |
| M01101228-I1-GC | 2025-12-18 | General construction | 484 WEST 43 STREET | Minor ADA compliance to the laundry room & service area on the 35th floor. No change to use egress or occupancy. | $4,900 |
| B01319017-I1-GC | 2025-12-01 | General construction | 145 HICKS STREET | Interior Renovation of Unit B60. Removal/Installing Interior partitions and Interior finishes as per plans. No change of use, egress or occupancy under this application | $530,006 |
| M01148669-I1-GC | 2025-08-12 | General construction | 119 SPRING STREET | NON-LOAD BEARING FIRE-RATED INTERIOR PARTITION TYPES PER BC 709 PROPOSED WORK IS LIMITED TO THE INTERIOR ONLY IN THE CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $15,000 |
| M01253284-I1-MS | 2025-07-17 | Mechanical / HVAC | 177 CANAL STREET | Install Mini-split HVAC system on 2nd floor. No change in use, egress and occupancy | $12,000 |
| M01174453-I1-GC | 2025-07-11 | General construction | 400 WEST 43 STREET | New convenience ramp at existing terrace and stair on the second floor and installation of a new closet in the cellar level in the practice studio. No change to use egress or occup | $18,840 |
| M01222266-I1-MS | 2025-06-10 | Mechanical / HVAC | 12 WEST 18 STREET | Mechanical for non-load bearing interior partition work in 2nd floor condo unit 2EW. No change of use, egress or occupancy under this application. | $95,000 |
| M01222252-I1-GC | 2025-06-05 | General construction | 12 WEST 18 STREET | Non-Load Bearing Interior partition work in 2nd floor condo unit 2EW. No change of use, egress or occupancy under this application. | $376,225 |
| B00868343-I1-GC | 2025-04-07 | General construction | 30 3 AVENUE | replace entry door and interior door. minor plaster work and minor repair of exterior ramp and railings | $5,275 |
| Q01159087-I1-MS | 2025-03-12 | Mechanical / HVAC | 117-14 LIBERTY AVENUE | Mechanical work related to renovation of existing 1st floor commercial space - one (1) new 3 ton & one (1) new 4 ton unit at roof,, one (1) new 3 ton unit & one (1) new 4 ton unit | $38,000 |
| M01183293-I1-GC | 2025-03-05 | General construction | 622 GREENWICH STREET | NON-LOAD BEARING FIRE RATED INTERIOR PARTITION TYPES PER BC 709 PROPOSED WORK LIMITED TO INTERIOR ONLY AT APT 6B. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $96,001 |
| M00791741-I1-GC | 2025-02-19 | General construction | 484 WEST 43 STREET | Interior renovation to the second floor existing woman's locker room. No change to use egress or occupancy. | $100,000 |
| M01156756-I1-MS | 2025-01-16 | Mechanical / HVAC | 4248 BROADWAY | Mechanical work related to renovation of existing 1st floor commercial space - two (2) new 3 ton units at open space, two (2) new 3 ton units at 1st floor, two (2) new bathroom exh | $32,000 |
| M01124766-I1-GC | 2024-11-27 | General construction | 2750 BROADWAY | combine 2752 & 2750 into one space, make opening in wall and remove toilets. install new toilet in 2752 space, no change to use ,egress or occupancy | $30,000 |
| B01052305-I1-GC | 2024-10-28 | General construction | 497 ST JOHNS PLACE | RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $120,000 |
| M01064701-I1-GC | 2024-08-30 | General construction | 360 EAST 57 STREET | Removal of non-load bearing interior partitions drywall ceilings. Limited to the ground floor and mezz levels only. No change of use, egress or occupancy under this application. | $48,000 |
| B00884715-I1-GC | 2024-08-07 | General construction | 425 EAST 26 STREET | INSTALLATION OF MINOR PARTION WITH WALL AND FLOOR FINISHES FOR APARTMENT 2l. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION | $7,000 |
| M00930415-I1-GC | 2024-07-31 | General construction | 400 WEST 43 STREET | Minor ADA compliance renovation to the laundry and service area on the 12th floor. No change to use egress or occupancy. | $4,900 |
| M00871562-I1-GC | 2024-06-24 | General construction | 49 WEST 90 STREET | Renovation of 2nd, 3rd and 4th floor apartment. Removal and replacement of interior partitions and finish work. No change of use, egress or occupancy under this application. | $108,237 |
| M01010736-I1-GC | 2024-05-29 | General construction | 129 WEST 20 STREET | Propose interior renovations of apartment 3A. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress | $50,000 |
| B01011814-I1-GC | 2024-04-04 | General construction | 360 FURMAN STREET | Interior Non-Load Bearing Partitions for existing apartment#1215. No change of use, egress or occupancy under this application. | $36,000 |
| B01007290-I1-MS | 2024-04-02 | Mechanical / HVAC | 1457 FLATBUSH AVENUE | Installation of new 1 ton split system unit, installation of ductwork for 3 existing HVAC units, bathroom exhaust fans & ductwork | $33,000 |
| Q00994104-I1-MS | 2024-02-08 | Mechanical / HVAC | 133-15 JAMAICA AVENUE | NEW SPLIT SYSTEM HVAC UNITS - CONDENSER @ ROOF 57000 BTU, 2 AIRE HANDLERS @ 1ST FLOOR @ 24,000 & 36,000 BTU, NEW DUCTWORK, NEW BATHROOM VENTILATION, EQUIPMENT CERTIFICATES OF COMPL | $27,000 |
| M00807078-S1-MS | 2023-12-15 | Mechanical / HVAC | 49 WEST 90 STREET | NEW HVAC SYSTEM FOR RESIDENTIAL UNITS PER NYC BC 2022 & MC 2022 CONFORMING TO NYCECC 2020. NO CHANGE IN USE, OCCUPANCY OR EGRESS | $29,000 |
| B00773110-I1-GC | 2023-12-11 | General construction | 160 COLUMBIA HEIGHTS | Minor interior renovation of non-loading partitions for existing Apt#2G. No change of use, egress or occupancy under this application. | $65,500 |
| B00946634-I1-MS | 2023-11-24 | Mechanical / HVAC | 467 86 STREET | INSTALL NEW SPLIT SYSTEM HVAC UNITS CONDENSER @ ROOF -2 AIR HANDLERS @ 1ST FL, NEW BATHROOM EXHAUST FANS & DUCTWORK | $42,000 |
| M00903504-I1-MS | 2023-09-28 | Mechanical / HVAC | 214 SULLIVAN STREET | INSTALL NEW SPLIT SYSTEM HVAC UNITS CONDENSER @ ROOF, AIR HANDLERS @ 1ST FL & CELLAR, NEW EXHAUST FAN AT CELLAR WITH DUCTWORK TO ROOF | $65,000 |
| M00825430-S2-MS | 2023-09-11 | Mechanical / HVAC | 323 BLEECKER STREET | Install commercial kitchen hood ventilation systems. Install bathroom ventilation system | $42,000 |
| X00807356-I1-MS | 2023-06-28 | Mechanical / HVAC | 3462 JEROME AVENUE | Mech work related to reno of existing 1st fl comm space - new 10 ton unit at roof & three new 3 ton units at 1st floor, new bathroom exhaust fans | $52,000 |
| M00825430-I1-GC | 2023-06-05 | General construction | 323 BLEECKER STREET | RENOVATE INTERIOR OF PARTIAL FIRST FLOOR STORE FOR A EATING AND DRINKING ESTABLISHMENT WITH COMMERCIAL KITCHEN AS PER PLANS SUBMITTED HERETO. NO CHANGE IN BULK, USE NOR EGRESS. | $84,500 |
| M00807078-I1-GC | 2023-06-01 | General construction | 49 WEST 90 STREET | Combination & Renov. of BAS. apart. & 1st fl. rear apart. New stair & opening. Minor structural work to reframe new door openings at existing addition. Removal & replacement of in | $84,868 |
| M00666561-I1-MS | 2023-05-03 | Mechanical / HVAC | 221 CENTRE STREET | Propose mechanical modifications at 005 floor apartment 5AB all as per plans herewith filed. No change in use egress or occupancy filed under this application. | $28,000 |
| M00817176-I1-MS | 2023-03-02 | Mechanical / HVAC | 141 WEST 111 STREET | Installation of new split system VRF ai conditioning unit. No change of use, egress, or occupancy under this application. | $10,500 |
| M00816986-I1-GC | 2023-03-02 | General construction | 141 WEST 111 STREET | Combination of apartments 1FE and 1RE. Removal and replacement of interior partitions and finish work. No change of use, egress, or occupancy under this application. | $41,040 |
| M00817282-I1-GC | 2023-03-02 | General construction | 141 WEST 111 STREET | Combination of apartments 1FW and 1RW. Removal and replacement of interior partitions and finish work. No change of use, egress, or occupancy under this application. | $41,040 |
| X08052774-I1-MS | 2023-02-21 | Mechanical / HVAC | 46 EAST 167 STREET | INSTALLATION OF NEW HVAC SYSTEM - NEW 10 TON CONDENSER @ ROOF & NEW EVAPORATORS & DUCTWORK AT 1ST FLOOR, NEW BATHROOM VENTING AT 1ST FLOOR | $52,000 |
| M00633648-I1-GC | 2023-01-16 | General construction | 141 WEST 111 STREET | Combination of apartments 2FE & 2RE with removal and replacement of interior partitions and finish work. No change of use, egress, or occupancy under this application. | $41,040 |
| M00661522-I1-GC | 2022-12-20 | General construction | 32 EAST 57 STREET | MINOR INTERIOR PARTITIONS AND CEILINGS AT 2ND FLOOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $130,000 |
| M00708168-I1-GC | 2022-11-12 | General construction | 141 WEST 111 STREET | Demolition and reconstruction of brick parapets and roofing including substrate and reinforcement of existing wood joist. No change of use, egress, or occupancy under this applicat | $75,000 |
| M08019994-I1-GC | 2022-11-01 | General construction | 894 6 AVENUE | INTERIOR RENOVATION: REMOVAL AND REPLACEMENT OF NON-BEARING PARTITIONS AND LIGHTING, NEW FINISHES THROUGHOUT AS PER PLANS FILED HEREWITH. NO CHANGE IN BULK, USE, EGRESS OR OCCUPANC | $225,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
