COMPANY RECORD · NEW YORK, NY
Green Conversions Inc — permit history in New York, NY
Green Conversions Inc appears on 54 New York permit records from 2019 through 2026, most often general construction (75% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 42 | 75% |
| Mechanical / HVAC | 14 | 25% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 1 |
| 2021 | 5 |
| 2022 | 17 |
| 2023 | 4 |
| 2024 | 7 |
| 2025 | 10 |
| 2026 | 11 |
Busiest year on record: 2022, with 17 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Shaw Mechanical Inc | 4 | 2025-07-31 |
| Testerman Plbg & Htg Inc | 4 | 2023-05-09 |
| Orbit Plbg & Htg Inc | 3 | 2026-05-18 |
| Orbit Sprinkler Corp | 2 | 2026-05-18 |
| Amn Plumbing Corp | 1 | 2026-01-27 |
| Casino Plmbg & Htg Corp | 1 | 2025-09-10 |
| Great Oaks Mechanical Inc | 1 | 2023-09-13 |
7 companies are named alongside Green Conversions Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 295 EAST 8 STREET | 2026-08-12 |
| 515 EAST 89 STREET | 2026-08-05 |
| 109 GREENE STREET | 2026-05-11 |
| 272 LAFAYETTE AVENUE | 2026-03-17 |
| 79 CHRISTOPHER STREET | 2025-10-24 |
| 799 PRESIDENT STREET | 2025-10-22 |
| 129 EAST 69 STREET | 2025-08-22 |
| 104 CHARLTON STREET | 2025-08-15 |
| 45 EAST 85 STREET | 2025-06-17 |
| 305 EAST 85 STREET | 2025-04-02 |
| 90 HUDSON STREET | 2024-06-21 |
| 115 EAST 9 STREET | 2024-06-21 |
| 2144 EAST 73 STREET | 2024-05-23 |
| 155 FRANKLIN STREET | 2024-03-28 |
33 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $5,000 to $1,000,000, median $67,500. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
54 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01413210-S2-MS | 2026-08-12 | Mechanical / HVAC | 295 EAST 8 STREET | PERFORM MECHANICAL, GENERAL CONSTRUCTION & STRUCTURAL WORK INCONJUNCTION WITH UNT#2/3E RENOVATION. REMOVE EXISTING THRU WALL A/C UNITS AND INFILL BRICK. INSTALL NEW HVAC SPLIT SYST | $55,000 |
| M01413210-S2-MS | 2026-08-12 | General construction | 295 EAST 8 STREET | PERFORM MECHANICAL, GENERAL CONSTRUCTION & STRUCTURAL WORK INCONJUNCTION WITH UNT#2/3E RENOVATION. REMOVE EXISTING THRU WALL A/C UNITS AND INFILL BRICK. INSTALL NEW HVAC SPLIT SYST | $55,000 |
| M01413210-S2-ST | 2026-08-11 | General construction | 295 EAST 8 STREET | PERFORM MECHANICAL, GENERAL CONSTRUCTION & STRUCTURAL WORK INCONJUNCTION WITH UNT#2/3E RENOVATION. REMOVE EXISTING THRU WALL A/C UNITS AND INFILL BRICK. INSTALL NEW HVAC SPLIT SYST | $55,000 |
| M01413210-I1-GC | 2026-08-11 | General construction | 295 EAST 8 STREET | PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH UNIT#2/3E RENOVATION. RECONFIGURE KITCHEN & RELOCATE LAUNDRY AREA. INSTALL & MODIFY CLOSETS. INSTALL N | $87,500 |
| M01413210-S2-ST | 2026-08-11 | Mechanical / HVAC | 295 EAST 8 STREET | PERFORM MECHANICAL, GENERAL CONSTRUCTION & STRUCTURAL WORK INCONJUNCTION WITH UNT#2/3E RENOVATION. REMOVE EXISTING THRU WALL A/C UNITS AND INFILL BRICK. INSTALL NEW HVAC SPLIT SYST | $55,000 |
| M01324174-I1-ST | 2026-08-05 | General construction | 515 EAST 89 STREET | PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH APT#3J RENOVATION. REMODEL KITCHEN, CREATE PANTRY AREA & UPGRADE BATHROOM. CREATE NEW MASONRY OPENING | $43,000 |
| M01380090-S1-MS | 2026-05-11 | Mechanical / HVAC | 109 GREENE STREET | PROPOSE MECHANICAL WORK IN CONJUNCTION WITH ARCH#M01380090-I1. | $31,500 |
| M01380090-I1-GC | 2026-05-07 | General construction | 109 GREENE STREET | RENOVATION CONSISTS OF MINOR PARTITIONS AND INTERIOR FINISH WORK AS PER PLAN. | $147,000 |
| M01135304-I1-GC | 2026-04-07 | General construction | 109 GREENE STREET | General construction to include the addition of aluminum pergola and MEP duct enclosure as per plans filed. No change to occupancy, use or egress under this application. | $63,000 |
| B01351856-I1-GC-CX | 2026-03-17 | General construction | 272 LAFAYETTE AVENUE | REDUCE EXISTING BASEMENT FLOOR WALL OPENING. CLOSE EXISTING 2ND FLOOR OPENING FOR AN EXISTING ONE FAMILY HOUSE. | $8,840 |
| M01324174-I1-GC | 2026-01-27 | General construction | 515 EAST 89 STREET | PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION INCONJUNCTION WITH APT#3J RENOVATION. REMODEL KITCHEN, CREATE PANTRY AREA & UPGRADE BATHROOM. CREATE NEW MASONRY OPENING | $43,000 |
| M01286129-I1-GC | 2025-10-24 | General construction | 79 CHRISTOPHER STREET | CONSTRUCTION OF TEMPORARY PENTHOUSE MOCK-UP STRUCTURE ON EXISTING BUILDING ROOF FOR NYC LANDMARKS PRESERVATION COMMISSION REVIEW. ARCHITECTURAL WORK AS PER PLANS. APPLICATION DOES | $30,000 |
| B01143036-I1-MS | 2025-10-22 | Mechanical / HVAC | 799 PRESIDENT STREET | Install 4 ton unit to serve apartment on 2nd /3rd floor Apt 5 | $20,000 |
| M01217097-S3-MS | 2025-08-22 | Mechanical / HVAC | 129 EAST 69 STREET | PERFORM MECHANICAL WORK INCONJUNCTION WITH APT#5C RENOVATION. INSTALL THRU - WALL AC UNITS IN NEW MASONRY OPENINGS. EXTERIOR WORK FOR OPENINGS FILED UNDER SEPARATE APPLICATION. NO | $27,500 |
| M01177173-I1-GC | 2025-08-15 | General construction | 104 CHARLTON STREET | Demolition of non-load-bearing walls. Construction of new non-load-bearing walls. Relocate kitchen and one bathroom. Relocate laundry room. Renovate one bathroom. New closets. Repl | $95,000 |
| M01177173-S1-MS | 2025-08-14 | Mechanical / HVAC | 104 CHARLTON STREET | Replace existing gas fired hydronic heating system and existing AC units with electric heat pumps. | $47,500 |
| M01217097-S2-GC-CX | 2025-08-07 | General construction | 129 EAST 69 STREET | PERFORM MINOR INTERIOR DEMOLITION/CONSTRUCTION AND STUCTURAL WORK INCONJUNCTION WITH APT#5C RENOVATION. CREATION OF FIVE (5) MASONRY OPENINGS FOR THRU - WALL HVAC UNITS INSTALLATIO | $12,500 |
| M01217097-I1-GC | 2025-07-25 | General construction | 129 EAST 69 STREET | PERFORM MINOR INTERIOR DEMOLITION & CONSTRUCTION INCONJUNCTION WITH APT#5C RENOVATION. RECONFIGURE KITCHEN & MODIFY BATHROOMS. INSTALL & MODIFY CLOSETS. INSTALL NEW LIGHTING. EXTER | $135,000 |
| M01212834-I1-GC | 2025-06-17 | General construction | 45 EAST 85 STREET | Interior renovation of existing class A dwelling unit, 2 new masonry openings below existing windows for new ac units. No change in use, egress or occupancy. | $101,440 |
| M01199825-I1-GC | 2025-04-02 | General construction | 305 EAST 85 STREET | HEREBY FILING INTERIOR RENOVATION OF APARTMENT #20A&B. WORK INCLUDES NEW PARTITION WALLS AD RELOCATION OF EXISTING DOORS. NO CHANGE IN USE OCCUPANCY NO EGRESS. | $80,000 |
| B01142516-I1-GC | 2025-02-21 | General construction | 799 PRESIDENT STREET | Renovation of apartment 5 on second and third floor. No change to occupancy use or egress under this application. | $75,000 |
| M01073402-I1-GC | 2024-08-14 | General construction | 305 EAST 85 STREET | HEREBY FILING INTERIOR RENOVATION OF APARTMENT #17A. WORK INCLES NEW FINISHES. NO CHANGE IN USE OCCUPANCY NO EGRESS. | $100,000 |
| M01032850-I1-GC | 2024-06-21 | General construction | 90 HUDSON STREET | RENOVATION OF AN EXISTING APARTMENT #2E. NO CHANGE IN USE, EGRESS AND OCCUPANCY. | $48,600 |
| M01053168-I1-GC | 2024-06-21 | General construction | 115 EAST 9 STREET | GUT RENOVATION OF THE PRIMARY BATHROOM IN APARTMENT 9KLM INCLUDING NEW PLUMBING FIXTURES, FINISHES, AND LIGHTING. LIMITED DEMOLITION OF NON-STRUCTURAL WALLS AND REFRAMING OF INTERI | $99,900 |
| B01006541-S2-MS | 2024-05-23 | Mechanical / HVAC | 2144 EAST 73 STREET | SUBSEQUENT MECHANICAL APPLICATION IN CONJUNTION WITH APPROVED GC # B01006541-I1 | $20,000 |
| B01006541-I1-GC | 2024-04-04 | General construction | 2144 EAST 73 STREET | NEW INTERIOR RENOVATION FOR AN EXISTING TWO STORY TWO FAMILY DWELLING WITH CELLAR .NEW EXTERIOR WORK AND FENESTRATION.MH ,PL AND FN TO BE FILED WITH DOBNOW.NO CHANGE IN USE AND OCC | $250,000 |
| M00992040-I1-GC | 2024-03-28 | General construction | 155 FRANKLIN STREET | IN APT 5S, INSTALL 2 NEW NON-LOAD BEARING PARTITIONS, 2 NEW INTERIOR DOORS. RELOCATE EXST'G TRACK LIGHT POINTS AS REQ'D. NO NEW LIGHTING/ NO CHANGE TO ENERGY USAGE. NO CHANGE IN U | $39,000 |
| M00923404-I1-GC | 2024-01-19 | General construction | 333 EAST 68 STREET | renovation in apt 6C only. no change in use, egress or occupancy. | $15,000 |
| M00952933-I1-MS | 2023-12-20 | Mechanical / HVAC | 109 GREENE STREET | MECHANICAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $85,000 |
| M00952928-I1-GC | 2023-12-04 | General construction | 109 GREENE STREET | INTERIOR RENOVATION OF AN EXISTING DUPLEX APARTMENT, INCLUDING MINOR PARTITION CHANGES. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $411,492 |
| M00862147-I1-GC | 2023-09-11 | General construction | 115 EAST 9 STREET | Combine Apartments 19DE and 19C as per TPPN 3/97. Minor partiton work. Renovate two bathrooms. Remove kitchen in Apt 19C and cap 19C gas line . | $244,500 |
| M00808411-I1-GC | 2023-02-06 | General construction | 115 EAST 9 STREET | Application filed for apartment partition renovation as per drawings filed herewith. no change to use, egress or occupancy as a part of this application. | $133,900 |
| M08027681-I1-GC | 2022-12-05 | General construction | 1035 FIFTH AVENUE | RENOVATION OF APARTMENT 9D ON 9TH FLOOR. NO CHANGE TO OCCUPANCY, USE OR EGRESS. | $349,800 |
| M07997268-I1-GC | 2022-10-24 | General construction | 419 EAST 57 STREET | INTERIOR RENOVATION OF APARTMENT 3C ON THE 3RD FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $72,000 |
| B00730373-I1-MS | 2022-10-07 | Mechanical / HVAC | 296 STERLING PLACE | PROPOSE MECHANICAL WORK FOR APARTMENT #2A FOR RENOVATION IN CONJUNCTION WITH GC FILING # B00730348. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $9,400 |
| B00730348-I1-GC | 2022-09-29 | General construction | 296 STERLING PLACE | PROPOSE TO COMBINE APARTMENTS PURSUANT TPPN#3/97 FOR EXISTING DWELLING CELLAR & 1ST FL WITH INTERIOR RENOVATIONS WORK INCLUDES MINOR PARTITIONS & FINISH WORK AS PER PLAN. NO CHANGE | $80,000 |
| M00704461-I1-GC | 2022-08-03 | General construction | 1050 5 AVENUE | interior renovation of the duplex apartment as shown on plans filed herewith. no change to use, egress or occupancy | $360,500 |
| M00736594-I1-GC | 2022-07-20 | General construction | 330 LAFAYETTE STREET | Minor renovation to the apartment 3B as per plans attached herewith to create den and the closet. No change in use, egress and occupancy. | $15,000 |
| M00712488-I1-GC | 2022-06-29 | General construction | 17 WEST 67 STREET | Filing for minor interior renovation. Remove and install minor interior partition work, finishes etc. | $126,750 |
| M00709194-I1-GC | 2022-06-29 | General construction | 205 EAST 78 STREET | PROPOSE INTERIOR RENOVATION AT EXISTING APT #18C WITH MINOR PARTITIONS AND FINISH WORK AS PER PLAN . OTHER WORK TYPES WILL BE FILED SEPARATELY ON DOBNOW. NO CHANGE IN USE, EGRESS, | $50,500 |
| M00718561-I1-MS | 2022-06-29 | Mechanical / HVAC | 205 EAST 78 STREET | PROPOSE MECHANICAL WORK IN CONJUNCTION WITH ARCH DESIGN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCPANCY. | $13,350 |
| M00705502-I1-GC | 2022-06-16 | General construction | 247 WAVERLY PLACE | Interior renovation of new partitions, doors, floor, wall and ceiling finishes. Non-Structural Demolition Removal and disposal of interior partitions, fixtures, finishes, equipment | $580,475 |
| M00704689-I1-GC | 2022-06-03 | General construction | 330 WEST 72 STREET | AMENDED PLANS FOR NEW CEILING SOFFIT DETAIL AND FLOOR AND WALL REPAIR DETAIL. ADD PROGRESS INSTPECTION FIRE RATED CONSTRUCTION ALL PLAN CHANGES HAVE BEEN BUBBLED | $50,025 |
| M00705731-I1-MS | 2022-06-03 | Mechanical / HVAC | 247 WAVERLY PLACE | HEREWITH FILING MECHANICAL WORK AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $79,200 |
| B00653025-I1-MS | 2022-04-29 | Mechanical / HVAC | 225 MARLBOROUGH ROAD | MODIFCATION OF MECHANICAL DUCTWORK AND INSTALLATION OF AC UNITS. | $50,000 |
| B00652873-I1-GC | 2022-04-29 | General construction | 225 MARLBOROUGH ROAD | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FLOORING AND FINISHES. | $96,000 |
| M00553101-I1-GC | 2022-02-28 | General construction | 222 CENTRAL PARK SOUTH | Partition and related work to combine Apt 20 with already combined apartments 15 & 19 as per plans. Interior renovation to Apt 16 as per plans. No change to use, egress or occupan | $1,000,000 |
| M00669671-I1-GC | 2022-02-09 | General construction | 115 EAST 9 STREET | Combine Apartment 10K and 10L as per TPPN 3/97. Door between units added under application 100933910. Provide new smoke and carbon monoxide detectors as indicated. New enclosure ar | $5,000 |
| M00641846-I1-GC | 2022-01-14 | General construction | 217 CENTRE STREET | PROPOSE INTERIOR RENOVATION AT 4FL OFFICE SPACE, MINOR PARTITIONS, AND FINISH WORK AS PER PLAN. PLUMBING WORK WILL FILE UNDER LAA BY THE PLUMBER. NO CHANGEIN USE, EGRESS, AND OCCU | $160,000 |
| B00561513-I1-GC | 2021-10-29 | General construction | 214 FROST STREET | INTERIOR/EXTERIOR RENOVATION OF AN EXISTING 2-FAMILY HOUSE AS INDICATED ON THE DRAWINGS FILED HEREIN. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $240,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
