COMPANY RECORD · NEW YORK, NY

Gramercy Group, Inc — permit history in New York, NY

Gramercy Group, Inc appears on 35 New York permit records from 2022 through 2026, most often general construction (80% of the record).

Permit categories

CategoryPermitsShare
General construction2880%
Mechanical / HVAC720%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20228
20237
202415
20252
20263

Busiest year on record: 2024, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.

Where they worked

Address in sourceMost recent permit
1132 OAK POINT AVENUE2026-08-24
41 SEAVER WAY2026-07-08
522 WEST 38 STREET2026-01-16
63 FLUSHING AVENUE2025-05-16
417 CANAL STREET2025-03-21
125 WALKER STREET2024-08-01
100 CENTRE STREET2024-07-12
635 WEST 165 STREET2024-07-09
2131 HART STREET2024-07-08
125 WHITE STREET2023-12-19
452 THOMAS S BOYLAND STREET2023-09-08
774 EAST GUN HILL ROAD2023-08-30
71 COMMERCIAL STREET2023-06-15
2421 LAFAYETTE AVENUE2023-04-29

18 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $1,950,000, median $100,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

35 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
X01420239-I1-GC-CX2026-08-24General construction1132 OAK POINT AVENUETHE PLANS ENCLOSED DEPICT THE PARTIAL MASONRY WALL REMOVAL OF THE 2 STORY BUILDING(S) LOCATED AT 1132 OAKPOINT AVENUE, BRONX NEW YORK, 10474. PER PLANS. DEMOLITION BY FULL MECHANIC$40,000
Q01409302-I1-GC2026-07-08General construction41 SEAVER WAYFILING HEREWITH REMOVAL OF SIGNAGE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. FILED UNDER MPP Project-000000254.$60,000
M01250561-I1-GC-CX2026-01-16General construction522 WEST 38 STREETPartial and interior demolition of 11 story building as per plans filed herewith.$1,499,600
B01202563-I1-GC-CX2025-05-16General construction63 FLUSHING AVENUETHE ENCLOSED PLANS ILLUSTRATE THE SCOPE, SEQUENCE, AND MEANS AND METHODS FOR THE COMPLETE DEMOLITION OF THE MASONRY FENCE AND CONCRETE MASONRY GUARD HOUSE LOCATED AT FLUSHING AVENU$150,000
M00849947-I1-MS2025-03-21Mechanical / HVAC417 CANAL STREETProviding exhaust air in the underground electrical vault, interlocked with the light switch, to purge 6 air changes per hour (ACH) upon entry to the vault. Dehumidification and he$80,000
M01030004-I1-GC-CX2024-08-01General construction125 WALKER STREETNon- Structural exterior wall removal and infill as shown on drawings filed herewith. No change in use, egress, or occupancy under this application. Application is in relation to $100,000
M01006848-I1-GC2024-07-12General construction100 CENTRE STREETInfills for windows, doors, and bridges, interior non load bearing removals in cellar as shown on drawings filed herewith. No change in use, egress, or occupancy.$400,000
M00938938-I1-GC2024-07-09General construction635 WEST 165 STREETEYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction throughout floors cellar, 1-9, in the existing building. No change to zoning, use, egress or occupancy.$1,950,000
M00938943-I1-MS2024-07-09Mechanical / HVAC635 WEST 165 STREETEYE INST. INTERIOR DEMO: HVAC removals throughout floors cellar, 1-9, in the existing building. No change to zoning, use, egress or occupancy.$200,000
X01033977-I1-GC2024-07-08General construction2131 HART STREETFiling for removal of interior finishes, wood and shingle, roof systems, wood framing, and stairs and the protection and salvage of select building systems and components. (This is$1,844,797
M00920932-I1-GC2024-03-28General construction635 WEST 165 STREETEYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on floors 4-8 of Eye Research, in the existing building. No change to use, egress or occupancy.$750,000
M00938734-I1-MS2024-03-28Mechanical / HVAC635 WEST 165 STREETEYE INST. INTERIOR DEMO: HVAC ductwork removals on floors 4-8 of Eye Research, in the existing building. No change to use, egress or occupancy.$25,000
M00938877-I1-MS2024-03-28Mechanical / HVAC635 WEST 165 STREETEYE INST. INTERIOR DEMO: HVAC ductwork removals on 4th floor of Eye Institute, in the existing hospital building. No change to zoning, use, egress or occupancy.$20,000
M00921008-I1-GC2024-03-28General construction635 WEST 165 STREETEYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 4th floor of Eye Institute, in the existing hospital building. No change to zoning, use, egress or occu$225,000
M00938927-I1-MS2024-03-06Mechanical / HVAC635 WEST 165 STREETEYE INST. INTERIOR DEMO: HVAC removals on 8th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.$15,000
M00938909-I1-MS2024-03-06Mechanical / HVAC635 WEST 165 STREETEYE INST. INTERIOR DEMO: HVAC removals on 7th & 9th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.$25,000
M00921057-I1-GC2024-03-05General construction635 WEST 165 STREETEYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 8th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.$150,000
M00921035-I1-GC2024-03-05General construction635 WEST 165 STREETEYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 6th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.$225,000
M00921047-I1-GC2024-03-05General construction635 WEST 165 STREETEYE INST. INTERIOR DEMO: Demolition of all non-load bearing construction on 7th & 9th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupan$300,000
M00938894-I1-MS2024-03-05Mechanical / HVAC635 WEST 165 STREETEYE INST. INTERIOR DEMO; HVAC removals on 6th floor of Eye Institute, in the existing building. No change to zoning, use, egress or occupancy.$20,000
M00947399-I1-GC2023-12-19General construction125 WHITE STREETSoft interior demo to prepare for full building demolition. Removal of no-load bearing partition walls, doors, fixtures and millwork as shown on drawings filed herewith. No change $700,000
B00910547-I1-GC2023-09-08General construction452 THOMAS S BOYLAND STREETTHE PLANS ENCLOSED DEPICT THE EXTENT, SEQUENCE AND MEANS AND METHOD FOR THE INTERIOR REMOVALS OF NON STRUCTURAL ELEMENTS BY HAND HELD MEANS WITH MECHANICAL ASSISTANCE AS SHOWN ON P$75,000
X00872994-I1-GC-CX2023-08-30General construction774 EAST GUN HILL ROADFILING PLANS FOR SEQUENCE AND MEANS AND METHOD FOR PROPOSED PARTIAL DEMOLITION OF EXISTING STEEL BLEACHERS. NO CHANGE IN USE EGRESS OR OCCUPANCY$40,000
B00879656-I1-GC2023-06-15General construction71 COMMERCIAL STREETRemoval of parapet and upper exterior brick, as per plans filed herewith.$9,990
X00631080-I1-GC-CX2023-04-29General construction2421 LAFAYETTE AVENUEDemolition and reconstruction of the top-level (roof) and the subfloors of the pumping station structure. Work also includes replacement stair bulkhead, crane structure, and misce$1,483,020
X00618365-I1-GC-CX2023-04-28General construction2421 LAFAYETTE AVENUEConstruction of three (3) new unenclosed adjacent elevated concrete platforms supported by concrete columns on individual pile caps. The platforms are an accessory to the Electrica$800,000
X00485343-I1-GC-CX2023-04-27General construction2421 LAFAYETTE AVENUELEGALIZATION OF THE EXISTING BULKHEAD ON THE GROUND LEVEL AND THE EXISTING PUMPING STATION AT SUB-FLOOR LEVELS$0
M08004411-I1-GC2022-12-08General construction124 WHITE STREETSoft interior demo to prepare for full building demolition. Removal of no-load bearing partition walls, doors, fixtures and millwork as shown on drawings filed herewith. No change $800,000
M00760639-I1-GC2022-07-20General construction124 WHITE STREETPartial dismantle of the north tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-structural walls, planter, etc., $100,000
M00760589-I1-GC2022-07-20General construction125 WHITE STREETPartial dismantle of the south tower 2nd floor pedestrian bridge, remove art work on columns, and plaza area hardscaping work to remove vents, non-structural walls, planter, etc., $100,000
M00737075-I1-GC2022-07-20General construction100 CENTRE STREETGC work for interim sally port as shown on drawings filed herewith. No change in use, egress or occupancy under this application.$1,250,000
M00698550-I1-GC2022-03-23General construction100 CENTRE STREETRemoval and installation of non-load bearing partition walls, doors, etc. for court house improvement work as shown on drawings filed herewith. No change in use, egress, or occupan$1,200,000
M00658294-I1-GC2022-01-25General construction14 WEST 57 STREETInterior demolition to remove all non-structural partition walls, drop ceilings, and flooring for entire structure from cellar to 12th floor$10,000
M00658666-I1-GC2022-01-25General construction6 WEST 57 STREETInterior demolition of existing partition walls, drop ceiling, and floor finishing in cellar and on floors 001 thru 011 as per drawings$10,000
M00658290-I1-GC2022-01-25General construction10 WEST 57 STREETInterior demolition to remove all non-structural partition walls, drop ceilings, and flooring for entire structure from cellar to 10th floor$10,000

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →