COMPANY RECORD · NEW YORK, NY
G.P. Mechanical Corp — permit history in New York, NY
G.P. Mechanical Corp appears on 104 New York permit records from 2019 through 2026, most often plumbing (75% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 84 | 75% |
| General construction | 15 | 13.4% |
| Mechanical / HVAC | 8 | 7.1% |
| Fire protection | 5 | 4.5% |
4 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 5 |
| 2020 | 15 |
| 2021 | 21 |
| 2022 | 13 |
| 2023 | 17 |
| 2024 | 15 |
| 2025 | 17 |
| 2026 | 9 |
Busiest year on record: 2021, with 21 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| R G Contracting Ny LLC | 9 | 2026-07-01 |
| Celatech Construction Cor | 3 | 2026-08-25 |
| Titan Realty & Constructi | 3 | 2024-05-16 |
| Bnl Construction Corp | 1 | 2024-04-01 |
| Build-Source Corp | 1 | 2025-06-25 |
| Done Right LLC | 1 | 2023-10-10 |
| Titan Builders & Constr | 1 | 2024-05-16 |
| Tomak Group Inc | 1 | 2025-11-17 |
| Vegas Renovations Corp | 1 | 2024-09-19 |
9 companies are named alongside G.P. Mechanical Corp on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 11-08 MAIN AVENUE | 2026-08-25 |
| 11 PARK PLACE | 2026-07-01 |
| 57 WEST 57 STREET | 2026-06-22 |
| 2167 36 STREET | 2026-04-22 |
| 717 MANHATTAN AVENUE | 2026-04-08 |
| 132 WEST 14 STREET | 2026-02-13 |
| 52 GREENE STREET | 2026-01-14 |
| 79-09B NORTHERN BOULEVARD | 2025-12-02 |
| 38 EAST 32 STREET | 2025-11-17 |
| 70 EAST 10 STREET | 2025-11-17 |
| 11-08 30 AVENUE | 2025-10-30 |
| 779 FLATBUSH AVENUE | 2025-06-25 |
| 23-18 21 STREET | 2025-05-20 |
| 24-54 28 STREET | 2025-05-20 |
70 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $651,000, median $25,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
104 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01081356-S8-PL | 2026-08-25 | Plumbing | 11-08 MAIN AVENUE | Herewith filing for plumbing systems for proposed 5-Story mixed-use building. Filed in conjunction with New Building #Q01081356-I1. | $0 |
| M01398477-S2-PL | 2026-07-01 | Plumbing | 11 PARK PLACE | Plumbing work as shown on plans filed herewith. | $0 |
| M01396299-S2-PL | 2026-06-22 | Plumbing | 57 WEST 57 STREET | APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 16TH FLOOR (SUITE 1602) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $3,000 |
| M01379963-S1-PL | 2026-04-29 | Plumbing | 11 PARK PLACE | Interior demo of plumbing fixtures & related piping for existing office space. No change in use, egress or occupancy. | $0 |
| Q01015780-I1-PL | 2026-04-22 | Plumbing | 2167 36 STREET | APPLICATION TO INSTALL SPRINKLER SYSTEM FOR EXISTING RESIDENTIAL BUILDING. | $20,000 |
| B01345488-I1-GC | 2026-04-08 | General construction | 717 MANHATTAN AVENUE | REPLACE EXISTING STOREFRONT WITH NEW, INTERIOR ALTERATION ON THE FIRST FLOOR RETAIL SPACE. | $150,000 |
| M01353315-S2-PL | 2026-03-03 | Plumbing | 57 WEST 57 STREET | SUBSEQUENT APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 11TH FL (SUITE 1109 - NOSOVA) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $4,000 |
| M00733171-I1-PL | 2026-02-13 | Plumbing | 132 WEST 14 STREET | Plumbing work as per plans | $70,000 |
| M01124484-I1-PL | 2026-01-14 | Plumbing | 52 GREENE STREET | Plumbing modifications to the Cel, 1st-5th Floors, Penthouse and Roof as plans filed herewith. No change in use, egress, or occupancy. | $104,420 |
| Q01322128-I1-MS | 2025-12-02 | Mechanical / HVAC | 79-09B NORTHERN BOULEVARD | REPLACEMENT OF HVAC UNIT AT ROOF | $25,000 |
| M01302844-S2-PL | 2025-11-17 | Plumbing | 38 EAST 32 STREET | APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 10TH FLOOR (SUITE 1001) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $11,500 |
| M01267560-S2-PL | 2025-11-17 | Plumbing | 70 EAST 10 STREET | HEREBY FILING FOR THE RELOCATION AND INSTALLATION OF FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS. | $12,150 |
| M01079539-S1-PL | 2025-11-06 | Plumbing | 11 PARK PLACE | Plumbing work as shown on plans | $7,000 |
| Q01124085-S1-MS | 2025-10-30 | Mechanical / HVAC | 11-08 30 AVENUE | REPLACEMENTS OF SPACE HEATERS (GAS) AT FIRST FLOOR | $60,000 |
| M01226935-S1-PL | 2025-09-03 | Plumbing | 38 EAST 32 STREET | APPLICATION FILED FOR PLUMBING ADDITIONS/MODIFICATIONS ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $67,500 |
| B01142443-S2-PL | 2025-06-25 | Plumbing | 779 FLATBUSH AVENUE | Plumbing plans filed herewith to show interior office renovations. No change to use, egress, or occupancy. | $24,000 |
| Q00774462-S2-PL | 2025-05-20 | Plumbing | 23-18 21 STREET | PLUMBING WORK TO INCLUDE REMOVAL OF EXISTING AND INSTALLATION OF NEW PLUMBING FIXTURES FOR CELLAR, 1ST, 2ND & 3RD FLOORS, INCLUDING TWO (2) NEW COMBI-BOILERS IN CELLAR AND PIPE INS | $15,000 |
| Q01205128-S1-PL | 2025-05-20 | Plumbing | 24-54 28 STREET | PLUMBING WORK IN CONJUCTION WITH INTERIOR RENOVATION OF APT 2A. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $12,600 |
| M01161548-S2-PL | 2025-05-06 | Plumbing | 57 WEST 57 STREET | APPLICATION FILED FOR PLUMBING REMOVAL/MODIFICATIONS ON THE 10TH FL (SUITE 1007) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $3,000 |
| X01131606-I1-PL | 2025-04-16 | Plumbing | 1650 GRAND CONCOURSE | At 2nd Floor, Plumbing to be extended to new sinks. Install new Fixtures | $2,000 |
| Q01045477-I1-GC | 2025-04-11 | General construction | 47-44 44 STREET | ALTERATION AT CELLAR. REMOVE PARTITIONS AND PLUMBING FIXTURES TO CORRECT ECB VIOLATION 35476658H. | $2,600 |
| Q00405921-I1-PL | 2025-03-26 | Plumbing | 47-44 44 STREET | ALTERATION AT CELLAR. REMOVAL OF SHOWER, TOILET AND LAVATORY AND INSTALLATION OF SLOP SINK. TO CORRECT ECB VIOLATION # 35476658H | $6,000 |
| Q00841590-I1-GC | 2025-02-28 | General construction | 105-13 MARTENSE AVENUE | RENOVATION OF APARTMENT 1F | $66,350 |
| X01105555-I1-PL | 2025-02-24 | Plumbing | 1650 SELWYN AVENUE | Plumbing to be extended to new sinks. | $330,000 |
| X00916097-I1-PL | 2025-02-21 | Plumbing | 2741 3 AVENUE | Existing BATHROOM TO BE RENOVATED AND NEW BATHROOM | $25,000 |
| Q01138566-I1-PL | 2025-02-13 | Plumbing | 25-06 BROADWAY | PROPOSED PLUMBING WORK @ 25-06 BROADWAY AS PER PLANS. NO CHNAGE IN USE, EGRESS OR OCCUPANCY. IN CONJUNCTION WITH DOB NOW Q01126021 | $75,000 |
| X01130928-I1-PL | 2024-11-13 | Plumbing | 1921 LURTING AVENUE | INSTALLATION OF NEW BOILER, AND ASSOCIATED GAS PIPING, NEW GAS DRYER AND GAS METER. RELOCATION OF EXISTING GAS METER AT OPEN SPACE. | $10,000 |
| Q01126021-I1-GC | 2024-10-21 | General construction | 25-06 BROADWAY | PROPOSED INTERIOR NON-STRUCTURAL DEMOLITION ON 2ND FLOOR @ 25-06 BROADWAY AS PER PLANS. NO CHANGE IN USE OR EGRESS UNDER THIS APPLICATION. | $21,400 |
| Q01124085-I1-PL | 2024-10-18 | Plumbing | 11-08 30 AVENUE | REMOVAL OF EXISTING BOILER AND INSTALLATION OF NEW GAS SPACE HEATERS, GAS PIPING AND GAS METER. | $39,000 |
| B01095283-S1-PL | 2024-09-19 | Plumbing | 69 SUMMIT STREET | Apt 60-1: renovate existing bathroom, renovate existing kitchen, renovate existing laundry room, filed in conjunction with general construction | $16,000 |
| B00694660-I1-MS | 2024-09-13 | General construction | 322 QUINCY STREET | Renovation of single family residence remove & install non bearing partitions, install exhaust fan at roof, replace interior stair case, enlarge opening at rear facade and install | $223,200 |
| B00694660-I1-ST | 2024-09-13 | Mechanical / HVAC | 322 QUINCY STREET | Renovation of single family residence remove & install non bearing partitions, install exhaust fan at roof, replace interior stair case, enlarge opening at rear facade and install | $223,200 |
| B00694660-I1-MS | 2024-09-13 | Mechanical / HVAC | 322 QUINCY STREET | Renovation of single family residence remove & install non bearing partitions, install exhaust fan at roof, replace interior stair case, enlarge opening at rear facade and install | $223,200 |
| B00694660-I1-ST | 2024-09-13 | General construction | 322 QUINCY STREET | Renovation of single family residence remove & install non bearing partitions, install exhaust fan at roof, replace interior stair case, enlarge opening at rear facade and install | $223,200 |
| B00919409-I1-PL | 2024-09-09 | Plumbing | 111 TRUXTON STREET | Interior plumbing wok as per plan. No change in use, egress or occupancy. | $30,000 |
| B01020753-S1-PL | 2024-05-16 | Plumbing | 7 REWE STREET | PLUMBING WORK ASSOCIATED WITH ALTERATION B01020753-I1 FOR INSTALLATION OF NEW BATHROOMS AND ADDITIONAL GAS-FIRED HEATING TUBES AT LOADING BAY DOORS. | $10,000 |
| Q01033995-I1-GC | 2024-04-24 | General construction | 23-64 CRESCENT STREET | EXTERIOR MASONRY REPAIR AT FRONT FACADE OF EXISTING 2 STORY HOUSE. | $16,720 |
| Q00914318-S6-PL | 2024-04-18 | Plumbing | 143-06 135 AVENUE | NEW PLUMBING WORK AS PER PLANS FILED, REMOVAL OF EXISTING PLUMBING SYSTEMS AS PER PLANS FILED, FOR FLOORS 5-8. | $1,000 |
| Q01028332-I1-PL | 2024-04-16 | Plumbing | 25-31 43 STREET | REMOVE AND REPLACE EXISTING OIL BOILER WITH TWO NEW GAS COMBINATION UNITS (HEAT & HW COIL) | $22,000 |
| M00990720-S1-PL | 2024-04-01 | Plumbing | 45 SUTTON PLACE SOUTH | Interior bathroom, powder room, kitchen and laundry plumbing fixture installation. | $18,000 |
| M00886023-I1-PL | 2024-02-06 | Plumbing | 230 EAST 50 STREET | COMBINATION AND INTERIOR RENOVATION OF 2 EXISTING APARTMENTS OCCUPYING PART OF THE 10TH FL. REMOVING, REPLACING, RELOCATING AND INSTALLING NEW PLUMBING FIXTURES AS PER PLANS FILED | $24,000 |
| M00960641-S2-PL | 2023-12-12 | Plumbing | 11 PARK PLACE | Plumbing work as shown on plans (Suite 1212 Renovation). | $10,000 |
| Q00897669-S1-PL | 2023-10-10 | Plumbing | 15-27 149 STREET | PLUMBING APPLICATION HEREWITH FILED IN CONJUNCTION WITH GUT-REHAB OF EXISTING (2) STORES & (1) APARTMENT. NO CHANGE IN EGRESS, USE, BULK, OR OCCUPANCY. | $25,500 |
| B00894506-I1-PL | 2023-10-06 | Plumbing | 465 PACIFIC STREET | Herewith filing for removal and installation of fixtures, as per plans submitted. | $8,500 |
| Q00858820-I1-PL | 2023-07-26 | Plumbing | 23-02 23 AVENUE | PLUMBING WORK IN CONJUNCTION WITH DOB NOW APPLICATION# | $15,000 |
| M00684505-I1-PL | 2023-07-05 | Plumbing | 344 WEST 89 STREET | REPLACEMENT OF KITCHEN GAS APPLIANCE WITH ELECTRIC. REPLACEMENT AND RELOCATION OF BATHROOM FIXTURES PER PLANS | $25,000 |
| M00873733-I1-PL | 2023-06-23 | Fire protection | 57 WEST 57 STREET | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE PARTIAL 6TH FL (SUITE 607 - ITALIAN SISTERS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUP | $41,400 |
| M00873733-I1-PL | 2023-06-23 | Plumbing | 57 WEST 57 STREET | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE PARTIAL 6TH FL (SUITE 607 - ITALIAN SISTERS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUP | $41,400 |
| M08004655-I1-GC | 2023-05-19 | General construction | 360 WEST 22 STREET | INTERIOR RENOVATIONS TO EXISTING APARTMENT #16A. WORK TO INCLUDE NON-STRUCTURAL DEMOLITION, GENERAL CONSTRUCTION AND PLUMBING FIXTURE INSTALLATION. | $1,250 |
| Q00858813-I1-GC | 2023-05-15 | General construction | 23-02 23 AVENUE | INTERIOR RENOVATION OF AN EXISTING ONE FAMILY DWELLING | $80,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
