COMPANY RECORD · NEW YORK, NY
F1 Mechanical Inc — permit history in New York, NY
F1 Mechanical Inc appears on 65 New York permit records from 2019 through 2026, most often plumbing (98.5% of the record).
Licence on record
| Number as published by the authority | Permits filed under it |
|---|---|
| 002242 | 66 |
The number is reproduced as New York published it. A licence appearing on a permit does not prove it is current: check status and expiry with the issuing authority before acting.
Business record held by the regulator
| Name as registered | F1 MECHANICAL INC |
|---|---|
| Business address on file | 4748 BRONX BLVD BR NY 10470 |
| Business phone on file | (212) 564-0126 |
| Licence number | 2242 |
| Licence type | MASTER PLUMBER |
| Status in the register | ACTIVE |
Read from DOB License Info, published by the NYC Department of Buildings; our copy is from 2026-10-31. The name, address and phone are those the company filed with the regulator, reproduced as published. A permit shows the licence was on file the day it was filed. These rows show what the regulator holds now. The record is matched to F1 Mechanical Inc by company name, and only where that name resolves to exactly one licence in the register — a rule measured at 99.4% correct against permits whose licence number we already know. Verify with the authority before acting on it.
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 65 | 98.5% |
| Fire protection | 1 | 1.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 9 |
| 2021 | 16 |
| 2022 | 8 |
| 2023 | 10 |
| 2024 | 8 |
| 2025 | 4 |
| 2026 | 10 |
Busiest year on record: 2021, with 16 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Barry Fishelberg Co., Inc | 4 | 2026-05-14 |
| Eb Eliot Builders Inc | 2 | 2023-07-03 |
| Jap Restoration Inc | 2 | 2026-10-06 |
| The Line Construction Inc | 2 | 2022-04-29 |
| Interstate Interiors Inc | 2 | 2026-09-11 |
| Brooklyn Home Restoration | 1 | 2026-06-18 |
| Greenlane Inc | 1 | 2024-07-24 |
| Empire General Contractin | 1 | 2025-06-24 |
| Dfe Contractor LLC | 1 | 2021-11-05 |
| High Quality Construction | 1 | 2021-07-19 |
| Kurti Construction Corp | 1 | 2026-09-01 |
| Mksskr Consulting Service | 1 | 2024-01-26 |
14 companies are named alongside F1 Mechanical Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 219 WEST 81 STREET | 2026-10-06 |
| 22 WEST 19 STREET | 2026-09-11 |
| 390 RIVERSIDE DRIVE | 2026-09-01 |
| 1070 PARK AVENUE | 2026-08-12 |
| 900 5 AVENUE | 2026-07-08 |
| 96 BUTLER STREET | 2026-06-18 |
| 12265 FLATLANDS AVENUE | 2026-06-15 |
| 39 WEST 67 STREET | 2026-05-14 |
| 300 EAST 93 STREET | 2026-03-13 |
| 75-68 187 STREET | 2025-06-24 |
| 333 HART STREET | 2025-05-29 |
| 225 PARK PLACE | 2025-02-26 |
| 9 PROSPECT PARK WEST | 2024-11-07 |
| 105-20 LIVERPOOL STREET | 2024-10-07 |
56 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $449,900, median $20,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Also named on permits at the same addresses
| Company | Shared addresses | Years |
|---|---|---|
| Orbit Plbg & Htg Inc | 4 | 2020–2026 |
| Devo Fire Protection Inc | 4 | 2020–2026 |
| Hydrokinetic Plbg & Htg I | 4 | 2020–2026 |
| Gallery Restoration Ltd | 3 | 2020–2026 |
| Hamilton Air Company, Inc | 3 | 2021–2025 |
| Nice Plumbing Corp | 3 | 2020–2026 |
| Craine Air Conditioning I | 2 | 2025–2026 |
| Crossfield Plbg.&Htg | 2 | 2020–2026 |
Companies that also appear in New York permit records at addresses where F1 Mechanical Inc filed, in any year. Sharing an address is a documented co-appearance, not proof that they worked on the same project or with each other.
Permits on record
65 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01410366-S1-PL | 2026-10-06 | Plumbing | 219 WEST 81 STREET | PLUMBING WORK TYPE FOR A INTERIOR RENOVATION OF A BATHROOM ON UNIT 4A. AS PER PLANS SUBMITTED HEREWITH NO CHANGE IN USE, EGRESS OR OCCUPANCY GROUP. | $40,000 |
| M01442069-S2-PL | 2026-09-11 | Plumbing | 22 WEST 19 STREET | HEREWITH FILING PLUMBING MODIFICATIONS AS PER APPROVED PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY. | $65,000 |
| M01440864-S1-PL | 2026-09-01 | Plumbing | 390 RIVERSIDE DRIVE | Installation of plumbing fixtures. In apartment 5G, no change of use, egress, or occupancy under this application. | $18,500 |
| M01411373-S1-PL | 2026-08-12 | Plumbing | 1070 PARK AVENUE | Remove and cap 2 sinks, replace 1 sink on existing rough, remove 1 sink and convert to indirect condensate, replace existing bathroom fixtures on exit rough, remove slop sink and a | $14,000 |
| M01402034-S1-PL | 2026-07-08 | Plumbing | 900 5 AVENUE | REPLACE LAVATORIES, REMOVE BIDET, ENLARGE SHOWER. REPLACE WASHER/DRYER. NO CHANGES TO USE, EXTERIOR, ENERGY, EGRESS, OR OCCUPANCY. PRIOR TO 1968 CODE. | $0 |
| B01394923-S1-PL | 2026-06-18 | Plumbing | 96 BUTLER STREET | INSTALLATION OF NEW PLUMBING FIXTURES FOR A HALF BATHROOM IN THE BASEMENT AS PER THE DRAWINGS FILED HEREIN. | $12,000 |
| B01396732-S1-PL | 2026-06-15 | Plumbing | 12265 FLATLANDS AVENUE | HEREWITH FILING REMOVAL AND REPLACEMENT OF EXISTING PACKAGED ROOFTOP UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $9,200 |
| M01332682-S2-PL | 2026-06-11 | Plumbing | 22 WEST 19 STREET | REMOVAL OF PLUMBING FIXTURES AS PER PLANS FILED HEREIWTH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $3,000 |
| M01383720-S1-PL | 2026-05-14 | Plumbing | 39 WEST 67 STREET | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 1204 ON THE 11TH AND 12TH FLOORS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $28,000 |
| M01227514-S1-PL | 2026-03-13 | Plumbing | 300 EAST 93 STREET | Alteration will include removing and adding new partitions and bathroom renovations | $23,499 |
| Q01228498-S2-PL | 2025-06-24 | Plumbing | 75-68 187 STREET | NYPQ - Vascular and OBGYN Expansion - PLUMBING MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $80,000 |
| B00881107-I1-PL | 2025-05-29 | Plumbing | 333 HART STREET | Connecting new gas fired unit heaters and duct furnace. No change in use, occupancy or egress under this application. | $11,000 |
| B01169629-I1-PL | 2025-02-26 | Plumbing | 225 PARK PLACE | #2400 - Apt 2J - Plumbing modifications for kitchen. No change in egress, use, or occupancy. | $6,000 |
| M01081890-S1-PL | 2025-01-22 | Plumbing | 300 EAST 93 STREET | IN 8D KITCHEN CAP WATER LINE, CAP GAS VALVE AT EXISTING LOCATION OWING TO REMOVAL OF THIS 8D KITCHEN. IN 8D BATHROOM INSTALL NEW TUB, SHOWER FIXTURE AND TRIM, LAVATORY AND WATER CL | $20,900 |
| B01033661-I1-PL | 2024-11-07 | Plumbing | 9 PROSPECT PARK WEST | PROPOSE TO RENOVATE EXISTING APARTMENT #8B: NEW KITCHEN, BATHROOMS, BEDROOMS, LAUNDRY CLOSET WITH MINOR PARTITIONS INTERIOR FINISHED WORKS PER PLAN. NO CHANGE IN USE, EGRESS, AND O | $38,000 |
| Q01113471-S1-PL | 2024-10-07 | Plumbing | 105-20 LIVERPOOL STREET | GAS CONNECTION ONLY ON DIRECT REPLACEMENT GAS-FIRED MAKE-UP AIR ROOFTOP UNIT | $5,000 |
| X00564580-I1-PL | 2024-08-08 | Plumbing | 5449 SYLVAN AVENUE | Legalize 3 piece bathroom in cellar. | $0 |
| M01073939-S1-PL | 2024-07-24 | Plumbing | 200 EAST 84 STREET | plumbing work type filed in conjunction with interior renovation of apartment 11c. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $25,000 |
| B00898660-I1-PL | 2024-07-16 | Plumbing | 118 8 AVENUE | PROPOSED PLUMBING WORKS IN CONJUCTION WITH ARCHITECTURAL FILING. NO CHANGE IN USE, EGRESS AND OCCUPANCY. | $31,000 |
| Q01043081-S1-PL | 2024-05-15 | Plumbing | 40-15 58 STREET | GAS CONNECTION ONLY, FOR DIRECTREPLACEMENT OF HVAC PACKAGE ROOFTOP UNIT | $3,500 |
| M00968661-S1-PL | 2024-01-26 | Plumbing | 300 EAST 54 STREET | PLUMBING SCOPE OF WORK FILED FOR MINOR RENO OF APARTMENT 18JKL. NO CHANGE TO USE, EGRESS OR OCCUPANCY | $18,000 |
| M00906736-I1-PL | 2024-01-10 | Plumbing | 235 EAST 60 STREET | Plumbing work to at apts #3R & #3F at the 3rd floor indicated on drawings filed herewith No change in Use Egress or Occupancy under this application | $4,500 |
| Q00977224-S1-PL | 2023-12-21 | Plumbing | 14-45 REAR 143 STREET | GAS CONNECTION ONLY FOR DIRECT REPLACEMENT OF TWO (2) GAS-FIRED HOT WATER BOILERS IN CHURCH. | $3,000 |
| X00857361-I1-PL | 2023-12-20 | Plumbing | 6141 BROADWAY | PLUMBING FIXTURES TO BE REMOVED AND REPLACED IN CONJUNCTION WITH APARTMENT RENOVATION FILED UNDER APPLICATION #X00857305. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $10,000 |
| M00836862-I1-PL | 2023-12-05 | Plumbing | 2001 BROADWAY | installation of plumbing fixtures including commercial gas burners as per plans filed herewith. no change to use egress or occupancy. | $449,900 |
| M00836898-I1-PL | 2023-12-05 | Plumbing | 2001 BROADWAY | proposed drainage for the marquee as per plans filed herewith. No change to use, egress or occupancy | $1,000 |
| M00894720-S1-PL | 2023-10-23 | Plumbing | 428 WEST 23 STREET | Remove (2) tubs, install (2) new showers, direct replacement of (2) toilets and (2) lavatories | $10,000 |
| M00802595-I1-PL | 2023-08-11 | Plumbing | 145 WEST 13 STREET | PROPOSE PLUMBING WORK FILED IN CONJUNCTION WITH GC JOB #M08051797-I1 FOR INTERIOR RENOVATION WORK OF EXISTING 2-STORY DUPLEX APARTMENT # 103. WORK INCLUDES RENOVATING KITCHEN AND A | $36,000 |
| M00818913-S1-PL | 2023-07-03 | Fire protection | 104 WOOSTER STREET | PROPOSED TO RELOCATE AND REPLACE EXISTING PLUMBING FIXTURES, AND RELOCATE EXISTING SPRINKLER HEAD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $14,500 |
| M00818913-S1-PL | 2023-07-03 | Plumbing | 104 WOOSTER STREET | PROPOSED TO RELOCATE AND REPLACE EXISTING PLUMBING FIXTURES, AND RELOCATE EXISTING SPRINKLER HEAD. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $14,500 |
| X00878198-I1-PL | 2023-06-02 | Plumbing | 2511 MARION AVENUE | Filing for the installation of plumbing fixtures and related piping. | $30,000 |
| Q00854968-I1-PL | 2023-04-14 | Plumbing | 61-21 71 STREET | Gas Connection only for Direct Replacement of Package Rooftop HVAC Unit above the Cafeteria | $6,700 |
| Q00772850-I1-PL | 2022-11-09 | Plumbing | 135-28 37 AVENUE | Modification to the existing Plumbing System | $25,000 |
| M08008910-I1-PL | 2022-11-09 | Plumbing | 71 WEST 23 STREET | Herewith filing for modifications to existing plumbing systems and fixtures on the cellar (North Wing) floor as indicated on plans. No change in use, occupancy, or egress. | $25,000 |
| M00713680-I1-PL | 2022-10-04 | Plumbing | 115 WOOSTER STREET | HEREWITH FILING FOR PLUMBING WORK RELATED TO 6TH FLOOR APARTMENT RENOVATIONS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $90,000 |
| Q00740097-I1-PL | 2022-09-29 | Plumbing | 52-40 39 DRIVE | PLUMBING WORK IN CONJUNCTION WITH JOB #Q00709468 | $1,000 |
| M00704351-I1-PL | 2022-09-03 | Plumbing | 333 EAST 68 STREET | additions/ modifications to existing plumbing system as per plans filed herewith. No change in use egress or occupancy. | $11,002 |
| M00725978-I1-PL | 2022-07-01 | Plumbing | 99 PARK AVENUE | AT 14TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING PLUBMING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS. | $20,000 |
| M00698494-I1-PL | 2022-06-15 | Plumbing | 875 3 AVENUE | AT 4TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS. | $60,000 |
| M00624982-S1-PL | 2022-04-29 | Plumbing | 222 WEST 14 STREET | PLUMBING FIXTURES IN APT 13DE ON THE 13TH FLOOR FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $25,000 |
| M00627534-I1-PL | 2021-12-20 | Plumbing | 410 PARK AVENUE | AT 15TH FLOOR TENANT SPACE #1510, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS. | $10,000 |
| M00627514-I1-PL | 2021-12-20 | Plumbing | 410 PARK AVENUE | AT 9TH FLOOR TENANT SPACE #930, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS. | $10,000 |
| M00555014-I1-PL | 2021-11-18 | Plumbing | 1250 BROADWAY | AT 16TH FLOOR PUBLIC BATHROOMS, NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $80,000 |
| M00551023-I1-PL | 2021-11-18 | Plumbing | 1250 BROADWAY | AT 31ST FLOOR PUBLIC BATHROOMS, NEW PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $80,000 |
| M00546970-S1-PL | 2021-11-05 | Plumbing | 315 EAST 68 STREET | REPLACE EXISTING GAS STOVE,, REPLACE AND RELOCATE KITCHEN SINK ON EXISTING ROUGHING, INSTALL NEW WASHERDISH WASHER, & DRYER TO CONNECT TO EXISTING ROUGHING. NO CHANGE IN USE EGRES | $20,000 |
| M00586963-I1-PL | 2021-11-05 | Plumbing | 875 3 AVENUE | AT 21ST FLOOR SOUTH TENANT SPACE, MODIFICATIONS TO EXISTING PLUMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS. | $50,000 |
| M00509776-S1-PL | 2021-08-19 | Plumbing | 252 WEST 30 STREET | NEW AND RELOCATED FIXTURES PER PLANS | $15,000 |
| M00471083-I1-PL | 2021-07-23 | Plumbing | 184 NAGLE AVENUE | PLUMBING PLANS HEREBY FILED IN CONJUNCTION WITH JOB# M00451722. | $8,000 |
| M00549849-S1-PL | 2021-07-19 | Plumbing | 201 AMSTERDAM AVENUE | 1. Install six plumbing Fixtures and one Water Heater (Non-Gas); 2. Install one Gas meter, Gas pipe and four Gas cooking equipment (Non-Residential). | $34,500 |
| M00456596-I1-PL | 2021-06-24 | Plumbing | 1230 PARK AVENUE | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF EXISTING APARTMENT ON THE PENTHOUSE LEVEL OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. ENER | $25,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Search these records
The 65 permits above are a static record through 2026. Select a year above to open that year’s records, or search F1 Mechanical Inc in New York, NY by address, trade or date range.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
Is this your company? Show this public permit record on your website with a free badge.
