COMPANY RECORD · NEW YORK, NY
Eastman Cooke & Associate — permit history in New York, NY
Eastman Cooke & Associate appears on 62 New York permit records from 2020 through 2026, most often mechanical / hvac (51.6% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 32 | 51.6% |
| General construction | 30 | 48.4% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 3 |
| 2021 | 5 |
| 2022 | 8 |
| 2023 | 9 |
| 2024 | 18 |
| 2025 | 10 |
| 2026 | 9 |
Busiest year on record: 2024, with 18 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Advanced Plbg LLC | 4 | 2024-10-29 |
| Bedrock Plbg. & Htg., Inc | 3 | 2026-01-12 |
| Full Capacity Fire Corp | 3 | 2026-02-18 |
| Real Plumbing Corp | 2 | 2026-02-04 |
4 companies are named alongside Eastman Cooke & Associate on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 543 WEST 42 STREET | 2026-08-12 |
| 1733 EASTCHESTER ROAD | 2026-06-23 |
| 865 WALTON AVENUE | 2026-05-05 |
| 505 EAST 116 STREET | 2026-01-28 |
| 666 BROADWAY | 2026-01-27 |
| 510 SACKETT STREET | 2025-10-06 |
| 96 SPRING STREET | 2025-06-04 |
| 71 ARDEN STREET | 2025-05-05 |
| 23-20 JACKSON AVENUE | 2025-04-24 |
| 434 BROADWAY | 2025-02-11 |
| 608 EAST 139 STREET | 2024-11-01 |
| 125 MONTAGUE STREET | 2024-08-12 |
| 35-39 9 STREET | 2024-07-17 |
| 8 EAST 41 STREET | 2024-02-14 |
31 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $1,500,000, median $149,967. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
62 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01414691-S1-MS | 2026-08-12 | Mechanical / HVAC | 543 WEST 42 STREET | SUBSEQUENT APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS IN THE CELLAR, 1ST FL AND 1ST FL MEZZ. OF EXISTING THEATRE/OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE I | $80,000 |
| M01414691-I1-GC | 2026-08-11 | General construction | 543 WEST 42 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE CELLAR, 1ST FL AND 1ST FL MEZZ. OF EXISTING THEATRE/OFFICE SPACE AS PER PLAN | $680,175 |
| X01244013-S6-MS | 2026-06-23 | Mechanical / HVAC | 1733 EASTCHESTER ROAD | REMOVAL AND INSTALLATION OF ELECTRICAL SYSTEMS, SUB-BASE FUEL OIL STORAGE, AND GENERATOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $75,000 |
| X01304442-I1-MS | 2026-05-05 | Mechanical / HVAC | 865 WALTON AVENUE | HEREWITH FILING MECHANICAL MODIFICATIONS FOR 1ST FLR RETAIL RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $27,000 |
| M01263181-I1-GC | 2026-01-28 | General construction | 505 EAST 116 STREET | INTERIOR OFFICE RENOVATION AT 4TH FLOOR. NO CHANGE TO USE, EGRESS, NOR OCCUPANCY. | $200,000 |
| M01333211-I1-MS | 2026-01-27 | Mechanical / HVAC | 666 BROADWAY | HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY | $150,000 |
| X01244013-S1-MS | 2026-01-26 | Mechanical / HVAC | 1733 EASTCHESTER ROAD | REMOVAL AND INSTALLATION OF A/C, DUCTWORK, DIFFUSERS, FANS, AND RELATED MECHANICAL PIPING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $865,000 |
| X01244013-I1-GC | 2026-01-15 | General construction | 1733 EASTCHESTER ROAD | INTERIOR RENOVATION OF EXISTING BUSINESS SPACE WITHIN THE EXISTING 1ST FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $499,980 |
| M01263181-S1-MS | 2026-01-09 | Mechanical / HVAC | 505 EAST 116 STREET | MECHANICAL SCOPE ASSOCIATED WITH OFFICE RENOVATION. | $16,998 |
| B01184133-I1-MS | 2025-10-06 | Mechanical / HVAC | 510 SACKETT STREET | Mechanical work associated with veterinary clinic fit-out | $125,000 |
| B01181699-I1-GC | 2025-09-22 | General construction | 510 SACKETT STREET | Interior alterations for a veterinary clinic, including new partitions and ceilings. | $800,000 |
| M01195317-I1-MS | 2025-06-04 | Mechanical / HVAC | 96 SPRING STREET | mechanical modifications on 7th and 8th floors as per plans filed herewith. no changes in use, egress or occupancy. | $25,020 |
| M01195312-I1-GC | 2025-05-14 | General construction | 96 SPRING STREET | general construction on 7th and 8th floors as per plans filed herewith. no changes in use, egress or occupancy. | $180,000 |
| M01141841-I1-MS | 2025-05-05 | Mechanical / HVAC | 71 ARDEN STREET | Herewith filing for modifications to existing mechanical systems on the 2nd, 3rd, 4th floors, and roof as indicated on plans. No change in use, occupancy, or egress. | $87,726 |
| M01141756-I1-GC | 2025-04-28 | General construction | 71 ARDEN STREET | Herewith filing for interior renovations on the 3rd and 4th floors and roof as indicated on plans. No change in use, occupancy, or egress. | $1,500,000 |
| Q01173065-I1-GC | 2025-04-24 | General construction | 23-20 JACKSON AVENUE | PROPOSED INT. RENO. OF EXISTING OFFICE SPACE @ 2ND FLOOR INCL. REARRANGEMENT & RECONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, INT. WALL, FLOOR AND CEILING FINISHES. ELECTRICAL | $95,850 |
| Q01173065-S1-MS | 2025-04-24 | Mechanical / HVAC | 23-20 JACKSON AVENUE | Fit-out of existing space utilizing existing air conditioning units and reconfiguration of ductwork to suit new architectural layout. | $24,000 |
| M01153579-I1-MS | 2025-02-11 | Mechanical / HVAC | 434 BROADWAY | Herewith filing for modifications to existing mechanical systems on the 5th floor as indicated on plans. No change in use, occupancy, or egress. | $18,000 |
| M01151198-I1-GC | 2025-02-11 | General construction | 434 BROADWAY | Herewith filing for minor interior renovations on the 5th floor as indicated on plans. No change in use, occupancy, or egress. | $160,000 |
| X01097697-I1-GC | 2024-11-01 | General construction | 608 EAST 139 STREET | HEREWITH FILING DEMO & CONSTRUCTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $575,000 |
| X01076279-I1-GC | 2024-09-13 | General construction | 865 WALTON AVENUE | HEREWITH FILING RENOVATIONS FOR RETAIL SPACE COMBINATION ON THE 1ST FLOOR PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $162,500 |
| X01076279-S1-MS | 2024-09-13 | Mechanical / HVAC | 865 WALTON AVENUE | HEREWITH FILING MECHANICAL MODIFICATIONS IN CONJUNCTION WITH 1ST FLR RETAIL COMBINATION PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $162,500 |
| B00928995-S1-MS | 2024-08-12 | Mechanical / HVAC | 125 MONTAGUE STREET | GOOD VETS-- REMOVAL AND INSTALLATION OF NEW RTU IN CONJUCTION WITH OFFICE BUILD-OUT. | $125,000 |
| B00928995-I1-GC | 2024-08-12 | General construction | 125 MONTAGUE STREET | GOOD VETS-- GENERAL CONSTRUCTION FOR COMMERICAL BUILD-OUT AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $700,000 |
| B01071192-I1-MS | 2024-07-29 | Mechanical / HVAC | 125 MONTAGUE STREET | Mechanical systems application to remove one (1) of two (2) existing gas fired HVAC units and install a new one, along with replacement of existing ducts and piping a per plans fil | $50,000 |
| B01035879-I1-GC | 2024-07-29 | General construction | 125 MONTAGUE STREET | General construction for Storefront and Ramp work as per plans filed herewith. No change to use, egress or occupancy. | $50,000 |
| Q01031670-I1-GC | 2024-07-17 | General construction | 35-39 9 STREET | Construction of 3,136 SF accessory open parking lot for use by office tenant within the existing office building (certificate of occupancy #Q122386 issued on 05/05/1958). | $50,000 |
| M01043534-I1-MS | 2024-06-14 | Mechanical / HVAC | 71 ARDEN STREET | Herewith filing for modifications to existing mechanical systems on the 1st and 2nd floor as indicated on plans. | $203,205 |
| M01037698-I1-GC | 2024-06-14 | General construction | 71 ARDEN STREET | Herewith filing for interior renovations and removals on the cellar, 1st and 2nd floors as indicated on plans. No change in use, occupancy, or egress. | $407,556 |
| M01021915-I1-MS | 2024-05-21 | Mechanical / HVAC | 96 SPRING STREET | mechanical modifications on 3rd floor as per plans filed herewith. no changes in use, egress or occupancy. | $50,018 |
| M01021829-I1-GC | 2024-05-20 | General construction | 96 SPRING STREET | General construction on 3rd floor as per plans filed herewith. No changes in use, egress or occupancy. | $65,028 |
| B00995533-I1-GC | 2024-05-06 | General construction | 125 MONTAGUE STREET | General Construction involving demolition and renovation of interior commercial space. No change to use, egress or occupancy. | $50,000 |
| M00947662-S1-MS | 2024-02-14 | Mechanical / HVAC | 8 EAST 41 STREET | mechanical equipment and electrical work for new tenant space. no change in use, egress or occupancy under this application. | $60,000 |
| M00947662-I1-GC | 2024-02-13 | General construction | 8 EAST 41 STREET | interior renovation of existing office space for Prima Health. New nonbearing partitions, finishes, doors and replacement of ceiling, plumbing, electrical and mechanical filed unde | $188,290 |
| X00947916-I1-MS | 2024-01-31 | Mechanical / HVAC | 871 WESTCHESTER AVENUE | MECHANICAL FILING FOR HEATING, COOLING AND ALL RELATED MECHANICAL WORK AS PER PLANS, NO CHANGES TO USE, EGRESS, OR OCCUPANCY. | $115,016 |
| X00947911-I1-GC | 2024-01-31 | General construction | 871 WESTCHESTER AVENUE | Interior renovation as per plans. No change to use, egress, or occupancy. | $470,008 |
| Q08031977-I1-GC | 2024-01-31 | General construction | 11-38 FOAM PLACE | FILING HEREWITH CIVIL LANDSCAPING PLANS. CIVIL MINOR GRADING OF SOIL AND NEW CHAINLINK FENCE | $150,000 |
| Q00663839-I1-GC | 2023-10-26 | General construction | 121-20 SPRINGFIELD BOULEVARD | Propose to extend the BSA variance. | $1,000 |
| M00896688-I1-GC | 2023-08-14 | General construction | 332 WEST 43 STREET | FILING HEREWITH FOR GC WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION. | $156,998 |
| M00837043-I1-MS | 2023-08-08 | Mechanical / HVAC | 75 SPRING STREET | MODIFICATIONS TO HVAC PIPING, DUCTWORK AND EQUIPMENT TO ACCOMMODATE THE MELISSA WOOD HEALTH IMPROVEMENT PROJECT IN THE EXISTING BUILDING. | $43,800 |
| M00857799-I1-GC | 2023-08-04 | General construction | 75 SPRING STREET | MODIFICATION TO INTERIOR PARTITIONS AND FINISHES TO ACCOMMODATE THE MELISSA WOOD HEALTH IMPROVEMENT PROJECT IN THE EXISTING BUILDING. | $175,200 |
| Q00530225-I1-GC | 2023-07-10 | General construction | 121-90 PRINGFIELD BOULEVARD | Filing alteration type 1 application to: create new grave site area with access path, establish new zoning use group I: cemetery and obtain new certificate of occupancy for grave s | $1,000,000 |
| B08032877-I1-MS | 2023-04-29 | Mechanical / HVAC | 5521 8 AVENUE | Mechanical system modification as per plans. No change in use egress or occupancy. | $500,000 |
| B08018656-I1-GC | 2023-04-29 | General construction | 5521 8 AVENUE | INTERIOR RENOVATION TO 2 THRU 4 FLOORS AS PER PLANS, MINOR ROOF REPAIRS TO BE INCLUDED. | $565,000 |
| Q08024530-I1-MS | 2023-01-05 | Mechanical / HVAC | 47-25 34 STREET | INSTALLATION NEW HVAC UNIT, LOUVERS, REPLACE EXIST. EXHAUST FAN ON ROOF WITH NEW, RELOCATE UNIT HEATER RELATED TO DCAS RENOVATION. | $323,888 |
| Q08020761-I1-GC | 2023-01-05 | General construction | 47-25 34 STREET | REMOVE AND INSTALL INTERIOR NON LOAD BEARING PARTITIONS, HUNG CEILINGS AND NEW CMU WALL RELATED TO DCAS RENOVATION. | $399,993 |
| B00797443-I1-MS | 2022-10-28 | Mechanical / HVAC | 1134 FULTON STREET | HVAC modifications and associated ductwork as per plans filed herewith. There will be no change in use, egress, of occupancy. | $50,000 |
| B00797432-I1-GC | 2022-10-26 | General construction | 1134 FULTON STREET | Removal and installation of interior non-load bearing partitions for interior tenant (Bondvet) fit-out. There will be no change in use, egress, or occupancy. | $499,987 |
| M00797490-I1-MS | 2022-10-11 | Mechanical / HVAC | 200 CHAMBERS STREET | Modification to mechanical systems, modifying the existing ductwork to accommodate new veterinary clinic, all as per plans filed herewith. no change to use, egress or occupancy. | $72,000 |
| M00797458-I1-GC | 2022-10-10 | General construction | 200 CHAMBERS STREET | RENOVATION OF EXISTING 1ST FLOOR COMMERCIAL SPACE (YOUR VET 1) INTERIOR PARTITIONS & FINISHES, NEW SUSPENDED CEILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $469,686 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
