COMPANY RECORD · NEW YORK, NY
E. C. Provini Co., Inc — permit history in New York, NY
E. C. Provini Co., Inc appears on 72 New York permit records from 2019 through 2026, most often general construction (65.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 47 | 65.3% |
| Mechanical / HVAC | 25 | 34.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2021 | 3 |
| 2022 | 21 |
| 2023 | 13 |
| 2024 | 4 |
| 2025 | 17 |
| 2026 | 13 |
Busiest year on record: 2022, with 21 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Aaron Plbg And Mech Syst | 10 | 2026-08-13 |
| Par Plumbing Co., Inc | 7 | 2026-06-22 |
| Par Fire Protection LLC | 6 | 2026-06-22 |
| Sirina Fire Prot Corp | 4 | 2024-08-29 |
| Pace Plumbing Corp | 1 | 2022-06-17 |
5 companies are named alongside E. C. Provini Co., Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 100 RICHMOND HILL ROAD | 2026-06-24 |
| 90-15 QUEENS BOULEVARD | 2026-06-01 |
| 10 COLUMBUS CIRCLE | 2026-05-28 |
| 200 BAYCHESTER AVENUE | 2026-05-15 |
| 500 BROADWAY | 2026-04-17 |
| 470 GATEWAY DRIVE | 2026-02-23 |
| 5100 KINGS PLAZA | 2025-10-22 |
| 131-07 40 ROAD | 2025-07-21 |
| 40-28 COLLEGE POINT BOULEVARD | 2025-03-21 |
| COLLEGE POINT BOULEVARD | 2025-03-17 |
| 2655 RICHMOND AVENUE | 2025-02-12 |
| 276 BEDFORD AVENUE | 2024-12-20 |
| 215-20 JAMAICA AVENUE | 2024-10-07 |
| 505 5 AVENUE | 2024-06-26 |
21 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $4,496,000, median $171,710. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
72 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| S01391476-S1-MS | 2026-06-24 | Mechanical / HVAC | 100 RICHMOND HILL ROAD | Mechanical work associated with partial interior remodel of retail space: new ducts and terminations | $56,848 |
| S01391476-I1-GC | 2026-06-12 | General construction | 100 RICHMOND HILL ROAD | Partial interior renovation of retail space | $68,933 |
| Q01352393-S1-MS | 2026-06-01 | Mechanical / HVAC | 90-15 QUEENS BOULEVARD | Demoing existing ductwork in space 3009. | $20,000 |
| Q01352393-I1-GC | 2026-05-29 | General construction | 90-15 QUEENS BOULEVARD | Landlord obligations for new tenant (adidas) by dividing former 'footlocker' space 3009 into two proposed spaces (3011) | $215,000 |
| M01282550-I1-GC | 2026-05-28 | General construction | 10 COLUMBUS CIRCLE | Interior renovation of existing demised retail tenant, new non-load bearing partitions, ceilings and finishes on 2nd & 3rd Floor Marketing/3rd & 4th Floor Construction as shown on | $1,000,000 |
| X01381092-I1-GC | 2026-05-15 | General construction | 200 BAYCHESTER AVENUE | INTERIOR ALTERATION OF EXISTING JOURNEYS RETAIL SPACE INCLUDING MAINTENANCE REPAIR, PATCH/PAINT, AND FLOORING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $100,000 |
| X01381092-S1-GC | 2026-05-14 | General construction | 200 BAYCHESTER AVENUE | INTERIOR ALTERATION OF EXISTING SPACE INCLUDING NEW LIGHTING PACKAGE, RENOVATION OF CASH WRAP SYSTEM, AND NEW FIXTURES. | $8,386 |
| Q01340908-S2-MS | 2026-04-30 | Mechanical / HVAC | 90-15 QUEENS BOULEVARD | Ductwork and mechanical units related to landlord obligations for demolition and redemising of spaces 2054, 2048, 2046 | $425,000 |
| Q01340908-I1-GC | 2026-04-30 | General construction | 90-15 QUEENS BOULEVARD | Landlord obligations for future retail tenant in space 2054, 2048, 2046. Areas to be demolished and re-demised with additional collateral work demo/reconstruct of adjacent mall com | $2,300,000 |
| M01381308-I1-GC | 2026-04-17 | General construction | 500 BROADWAY | Minor interior renovation to accommodate pop up store for VS PINK. No change in egress, use or occupancy as per plans filed herewith. | $85,150 |
| Q01266006-S1-MS | 2026-04-07 | Mechanical / HVAC | 90-15 QUEENS BOULEVARD | MECHANICAL MODIFICATIONS (CROC Store - Space 1072) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $59,000 |
| B01351449-I1-MS | 2026-02-23 | Mechanical / HVAC | 470 GATEWAY DRIVE | Space # L1.4. Modification to existing mechanical system to accommodate new layout for Bath and Body work per plans filed wherewith. No change in egress, use or occupancy. | $45,000 |
| B01351410-I1-GC | 2026-02-20 | General construction | 470 GATEWAY DRIVE | Space # L1.4 - Remodel and expansion of existing Bath and Body works. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures and entry doors per pla | $168,420 |
| Q01328202-I1-GC | 2025-12-22 | General construction | 90-15 QUEENS BOULEVARD | Renovation of existing mall concourse level, level 2 and level 3 family rooms, mens and womens restrooms. GWB substrate and tile finish to be removed and refinished. | $950,000 |
| Q01266006-I1-GC | 2025-10-24 | General construction | 90-15 QUEENS BOULEVARD | Interior Renovations (CROCS Store -space 1072) work to include new partition walls, floors, finishes, fixturing throughout sales area, stock room. No change in use egress or occupa | $636,000 |
| B01276993-I1-GC | 2025-10-22 | General construction | 5100 KINGS PLAZA | Interior partitions to divide former lease area of 'H&M' Space 01146/02238, remove connecting open stair | $175,000 |
| B01187662-S2-GC-CX | 2025-10-10 | General construction | 5100 KINGS PLAZA | Foundation work for new elevator pits, grease traps. Structural framing for closing openings from removed escalators within best buy retail area | $1,100,000 |
| Q01240890-I1-GC | 2025-07-21 | General construction | 131-07 40 ROAD | IT IS PROPOSED TO REMOVE ALL UTILITIES, INTERIOR NON-LOAD BEARING PARTITIONS AND FINISHES AND INSTALL NEW INTERIOR PARTITION AS SHOWN ON PLANS. APPLICATION FILED IN CONJUNCTION WIT | $408,000 |
| Q01240890-S2-MS | 2025-07-18 | Mechanical / HVAC | 131-07 40 ROAD | INSTALL NEW TOILET EXHAUST & SUPPPLY AIR DUCTWORK INCL. FRESH AIR AS SHOWN ON PLANS. INSTALL NEW PACKAGE WATER COOLED AC UNIT. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APP FILED IN C | $539,000 |
| B01187662-I1-GC | 2025-07-17 | General construction | 5100 KINGS PLAZA | Renovation of existing best buy store space to divide first floor tenant spaces into multiple food service and retail spaces. Divide second floor tenant spaces into retail space a | $4,200,000 |
| B01187662-S1-MS | 2025-07-16 | Mechanical / HVAC | 5100 KINGS PLAZA | HVAC work related to redeveloptment of existing 2 story best buy in mall into multiple tenant spaces. | $700,000 |
| Q01146791-S2-MS | 2025-03-21 | Mechanical / HVAC | 40-28 COLLEGE POINT BOULEVARD | INSTALL NEW TOILET EXHAUST AND SUPPLY AIR DUCTWORK INCLUDING FRESH AIR AS SHOWN ON PLANS. INSTALL A NEW PACKAGE WATER COOLED AC UNIT. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICA | $2,000,000 |
| Q01146791-I1-GC | 2025-03-17 | General construction | COLLEGE POINT BOULEVARD | REMOVE ALL UTILITIES, INTERIOR NON-LOAD BEARING PARTITIONS AND FINISHES AND INSTALL NEW INTERIOR PARTITIONS AS SHOWN ON PLANS. APPLICATION FILED IN CONJUNCTION WITH Q01146791-S1 (S | $1,500,000 |
| B01173356-S1-MS | 2025-03-07 | Mechanical / HVAC | 5100 KINGS PLAZA | MECHANICAL FILING IN CONJUNCTION WITH APPLICATION#B01173356-I1, VICTORIA SECRET STORE SPACE#0116A. | $9,000 |
| B01158128-S1-MS | 2025-02-25 | Mechanical / HVAC | 5100 KINGS PLAZA | Demolition of existing hvac equipment, hydronic piping and ductwork within the best buy retail space | $25,000 |
| B01158128-I1-GC | 2025-02-21 | General construction | 5100 KINGS PLAZA | Alterations and selective demolition to the former bestbuy retail space. Future work to be submitted under separate permit. Removal of Tenant improvements on first floor, second f | $950,000 |
| B01173356-I1-GC | 2025-02-21 | General construction | 5100 KINGS PLAZA | REMODEL OF EXISTING VICTORIA SECRET STORE SPACE#0116A. CONSISTING OF NEW INTERIOR FINISHES AND NEW FREE STANDING FLOOR FIXTURES. | $200,000 |
| S01164344-I1-MS | 2025-02-12 | Mechanical / HVAC | 2655 RICHMOND AVENUE | SPACE * 1120 - VICTORIA'S SECRET - Mechanical work to include new HVAC units in conjunction with renovation to existing retail space to be occupied by Victoria's Secret. No change | $45,000 |
| S01164259-I1-GC | 2025-02-12 | General construction | 2655 RICHMOND AVENUE | SPACE # 1120 - VICTORIA'S SECRET. Remove/install non load bearing partitions, floor, ceilings, finishes, reconfiguration of storefront per plans field herewith. No change in egre | $259,450 |
| Q01008006-I1-GC | 2025-01-13 | General construction | 131-07 40 ROAD | Installation of bridges from parking structure to towers 6. 7, 8; new stairs as per plans filed herewith. No change to use, egress or occupancy. Related NB job # is 402191711 | $210,000 |
| B01134762-I1-MS | 2024-12-20 | Mechanical / HVAC | 276 BEDFORD AVENUE | Mechanical work associated with new tenant build out for 'Aescape per plans filed herewith. No change in egress, use or occupancy | $15,000 |
| B01134709-I1-GC | 2024-12-20 | General construction | 276 BEDFORD AVENUE | New Tenant Build out for Aescape. Remove/install non load bearing partitions, flooring, finished and fixtures per plans filed herewith. No change in egress use or occupancy. | $152,670 |
| Q00986076-I1-GC-CX | 2024-10-07 | General construction | 215-20 JAMAICA AVENUE | ADDITION OF NEW STEEL BEAM AND POSTS TO SUPPORTEXISTING WOOD JOISTS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. | $44,500 |
| M01039498-I1-GC | 2024-06-26 | General construction | 505 5 AVENUE | Removal and installing interior fixtures, Flooring, interior podiums/walls. Exterior Radiators grilles to be painted. REMOVE EXISTING FITTING ROOM INTERIOR PANELS, FIXTURING, DOORS | $599,965 |
| Q00889454-S1-MS | 2023-12-14 | Mechanical / HVAC | 90-15 QUEENS BOULEVARD | Installation of smoke purge fan to upgrade retail space that was not included in the system install during the 2000 renovation. | $150,000 |
| Q00889454-I1-GC | 2023-12-14 | General construction | 90-15 QUEENS BOULEVARD | Mechanical system upgrade to add post fire smoke purge for cellar premises that is currently not connected to the system | $150,000 |
| M00905722-I1-MS | 2023-09-07 | Mechanical / HVAC | 591 BROADWAY | H&M-- INSTALLATION OF NEW ROOF CHILLER, MECHANCIAL EQUIPMENT, NEW DISTRIBUTION FOR RETAIL RENOVATION. | $425,000 |
| M00903583-I1-GC | 2023-09-07 | General construction | 591 BROADWAY | H&M-- General construction inclusive of installation of interior partitions for retail renovation. No change in use, egress, or occupancy. | $1,275,000 |
| Q00875941-I1-GC | 2023-06-15 | General construction | 40-28 COLLEGE POINT BOULEVARD | It is proposed to remove interior non-load bearing partitions and finishes and install new demising partition as shown on plans. Application filed in conjunction with subsequent fi | $110,099 |
| Q00875941-S1-MS | 2023-06-15 | Mechanical / HVAC | 40-28 COLLEGE POINT BOULEVARD | Install outside air and exhaust ductwork, Install condenser and hot water supply and return for future, install new FSD/AD as shown on plans. Application filed in conjunction with | $35,000 |
| M00859129-I1-GC | 2023-05-15 | General construction | 591 BROADWAY | H&M--INTERIOR NON-STRUCTURAL DEMOLITION INCLUSIVE OF PARTITIONS AND MECHANICAL REMOVALS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $75,000 |
| X00813159-I1-MS | 2023-04-25 | Mechanical / HVAC | 2100 BARTOW AVENUE | Bath and Body work Space # 230. Mechanical work to accommodate new tenant build out as per plans filed herewith. No change in egress use or occupancy. | $60,000 |
| X00813149-I1-GC | 2023-04-25 | General construction | 2100 BARTOW AVENUE | Bath and Body work Sp # 230. Tenant build out in vacant retail space. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures. Modify storefront as | $144,300 |
| M00813673-I1-GC | 2023-03-30 | General construction | 781 MADISON AVENUE | General Construction work as shown on plans filed herewith. No change in use, egress or occupancy. | $54,999 |
| Q08019876-S4-GC-CX | 2023-02-23 | General construction | 90-15 QUEENS BOULEVARD | Landlord obligations for vertical transportation (1 future escalator and two passenger elevators). | $840,000 |
| Q08044276-I1-MS | 2023-01-25 | Mechanical / HVAC | 90-15 QUEENS BOULEVARD | Space 2033 (Victoria's Secret) renovation to an existing retail space. | $68,000 |
| Q08043996-I1-GC | 2023-01-25 | General construction | 90-15 QUEENS BOULEVARD | Space # 2033 (Victoria's Secret) Renovation to an existing retail space. Work includes demolition, architectural, mechanical, electrical, plumbing and structural work only. No cha | $1,000,000 |
| Q08014662-S1-GC | 2022-12-21 | General construction | 90-15 QUEENS BOULEVARD | demolish and prepare for new tenant the forever 21 retail store, Modell's retail store, Dollar Party retail store & Back of House takeback area. | $4,496,000 |
| Q08014662-S5-GC-CX | 2022-12-20 | General construction | 90-15 QUEENS BOULEVARD | Structural work related to demolition of former Forever 21 Retail Store, Modell's, & Dollar Party. 2 New service elevators and one passanger. | $1,900,000 |
| Q08014662-S2-MS | 2022-12-20 | Mechanical / HVAC | 90-15 QUEENS BOULEVARD | Installation of new duct risers from tenant premises to the roof including; outdoor air / smoke purge; toilet exhaust, supplemental exhaust. Ductwork stubs for future connections | $295,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
