COMPANY RECORD · NEW YORK, NY
Dp Flynn Plbg & Htg Inc — permit history in New York, NY
Dp Flynn Plbg & Htg Inc appears on 36 New York permit records from 2021 through 2026, most often plumbing (97.3% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 36 | 97.3% |
| Fire protection | 1 | 2.7% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 3 |
| 2022 | 10 |
| 2023 | 5 |
| 2024 | 5 |
| 2025 | 8 |
| 2026 | 6 |
Busiest year on record: 2022, with 10 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Calcoe Associates Inc | 7 | 2026-03-09 |
| Sjb Interiors Inc | 3 | 2026-07-17 |
| M&M Construction Spec | 2 | 2026-08-27 |
| Vdj Construction Corp | 2 | 2025-10-24 |
| Dennis O'leary Constructi | 1 | 2026-01-26 |
| K.J. Remodeling Of Ny Co | 1 | 2023-05-01 |
| Martany Tile Corp | 1 | 2024-09-16 |
| Ultan Interiors Inc | 1 | 2026-05-15 |
8 companies are named alongside Dp Flynn Plbg & Htg Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 25 FIFTH AVENUE | 2026-08-27 |
| 20 EAST 35 STREET | 2026-07-17 |
| 2109 BROADWAY | 2026-05-15 |
| 103 EAST 75 STREET | 2026-03-09 |
| 310 WEST 72 STREET | 2026-01-26 |
| 30 EAST 10 STREET | 2026-01-23 |
| 325 RIVERSIDE DRIVE | 2025-10-24 |
| 2 HORATIO STREET | 2025-08-13 |
| 300 WEST 108 STREET | 2025-07-09 |
| 160 RIVERSIDE DRIVE | 2025-06-10 |
| 370 RIVERSIDE DRIVE | 2025-05-19 |
| 239 CENTRAL PARK WEST | 2025-04-24 |
| 360 EAST 72 STREET | 2025-04-14 |
| 69 3 STREET | 2025-01-09 |
34 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $2,500 to $62,699, median $25,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
36 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01431711-S1-PL | 2026-08-27 | Plumbing | 25 FIFTH AVENUE | Interior work related to the installation of an electric non-venting washer and dryer on the 5th floor in Apt 5G. The work includes General Construction, Plumbing, cosmetic upgrad | $19,920 |
| M01383616-S1-PL | 2026-07-17 | Plumbing | 20 EAST 35 STREET | interior renovation of residential unit on the 6th floor. no change to use, occupancy, or egress. | $50,000 |
| M01327187-S1-PL | 2026-05-15 | Plumbing | 2109 BROADWAY | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 1120 ON THE 11TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $25,000 |
| M01335242-S2-PL | 2026-03-09 | Plumbing | 103 EAST 75 STREET | PLUMBING WORK FOR RENOVATION IN APARTMENT 4/5RE | $48,000 |
| M01302597-S1-PL | 2026-01-26 | Plumbing | 310 WEST 72 STREET | REPLACE CONDENSATE LINES OF EXISTING SPLIT UNITS TO A FUNNEL DRAIN CONNECTION | $10,000 |
| M01305361-S1-PL | 2026-01-23 | Plumbing | 30 EAST 10 STREET | REMOVE AND INSTALL PLUMBING FIXTURES APT # 9N/10N , AS PER PLANS SUBMITTED HEREWITH. | $35,000 |
| M01280752-S1-PL | 2025-10-24 | Plumbing | 325 RIVERSIDE DRIVE | Proposed interior alterations to dwelling unit 122 on the 12th floor. Proposed plumbing work in existing bathroom, kitchen, staff bathroom and adjacent staff room as per plans file | $25,000 |
| M01172717-I1-PL | 2025-08-13 | Plumbing | 2 HORATIO STREET | Remove and install plumbing fixtures in apartment 10G, on 10th floor. as per plans submitted herewith. General const. filed under separate application . | $6,000 |
| M01116685-I1-PL | 2025-07-09 | Plumbing | 300 WEST 108 STREET | RENOVATION OF 2 EXISTING BATHROOMS AND KITCHEN, RELOCATE LAUNDRY AND REMOVE OF ONE BATHROOM INCONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT 2A. NO CHANGE IN USE OCCUPANCY OR EG | $30,000 |
| M01200747-S1-PL | 2025-06-10 | Plumbing | 160 RIVERSIDE DRIVE | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 2B ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $60,000 |
| M01197229-I1-PL | 2025-05-19 | Plumbing | 370 RIVERSIDE DRIVE | Plumbing work filed in conjunction with the renovation of an existing dwelling unit as per plans. Architectural and mechanical work filed under separate applications. No change of | $62,699 |
| M01187782-S1-PL | 2025-04-24 | Plumbing | 239 CENTRAL PARK WEST | RENOVATION OF KITCHEN & RELOCATION OF (2) BATHROOMS. RELOCATION OF WASHER/DRYER. | $49,000 |
| M01116405-I1-PL | 2025-04-14 | Plumbing | 360 EAST 72 STREET | REMOVE AND REPLACE PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH. | $3,000 |
| B01105127-S1-PL | 2025-01-09 | Plumbing | 69 3 STREET | COMBINATION OF APTS FILED UNDER TPPN 3/97. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $32,500 |
| M01027810-S2-PL | 2024-09-16 | Plumbing | 333 CENTRAL PARK WEST | THE SCOPE OF WORK CONSIST OF THE INSTALLATION OF THE NEW NATURAL GAS, SANITARY, SANITARY VENT, AND WATER DISTRIBUTION PIPING FOR THE RENOVATION OF AN EXISTING APARTMENT | $45,600 |
| M01062256-I1-PL | 2024-08-22 | Plumbing | 350 BLEECKER STREET | remove existing bathroom: lav, tub and toilet as noted in the drawing. Install new bathroom: Lav, tub , and toilet as noted in the proposed drawing. Install new Washer as noted in | $15,000 |
| M01055618-I1-PL | 2024-07-22 | Plumbing | 170 WEST 76 STREET | REPLACE AND RELOCATE NEW PLUMBING FIXTURES IN CONJUNCTION WITH THE RENOVATION OF UNIT 302/402 ON THE 3RD AND 4TH FLOOR . G.C. WAS FILED UNDER APPLICATION M01053886 | $35,000 |
| M00947785-S1-PL | 2024-01-30 | Plumbing | 7 LEXINGTON AVENUE | PLUMBING FIXTURES IN 4CD FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $30,000 |
| M00969295-S1-PL | 2024-01-05 | Plumbing | 875 WEST END AVENUE | Proposed Plumbing work within unit 11B on the 11th floor. Replacement, relocation and proposed plumbing fixtures. No change to use, egress of Occupancy | $32,500 |
| M00783281-I1-PL | 2023-05-04 | Plumbing | 333 CENTRAL PARK WEST | Plumbing fixture work in apartment 71/72 at 7th floor. No change to use, egress or occupancy. | $12,500 |
| M00853867-S1-PL | 2023-05-01 | Plumbing | 360 EAST 72 STREET | PLUMBING WORK ASSOCIATED WITH APT COMBINATION of 1104 and 1105 AS PER PLANS FILED HEREWITH. | $8,000 |
| M08054754-S1-PL | 2023-04-11 | Plumbing | 644 BROADWAY | PLUMBING FIXTURES IN APT 8W FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $10,000 |
| M08052582-I1-PL | 2023-03-21 | Plumbing | 7 WEST 92 STREET | Plumbing work at 2nd floor apartment #25 to accommodate renovation. No change to use egress or occupancy. | $23,500 |
| M07995791-S1-PL | 2023-01-03 | Plumbing | 500 GRAND STREET | PLUMBING FIXTURES IN BUILDING A APT 9A. NO CHANGE TO USE, OCCUPANCT OR EGRESS | $12,500 |
| M00643435-I1-PL | 2022-12-16 | Plumbing | 211 CENTRAL PARK WEST | PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $52,008 |
| M00580446-S1-PL | 2022-10-06 | Plumbing | 175 WEST 73 STREET | PLUMBING FIXTURES IN APT 5G FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $2,500 |
| M00760709-I1-PL | 2022-09-08 | Fire protection | 2150 BROADWAY | REPLACEMENT OF ONE-SHOWER, THREE-LAV, TWO-WC ONE-TUB, ONE-SINK-RES, ONE-DISHWASHER AND ONE-COOKING EQUIP-RES. RELOCATION OF THREE SPRINKLER HEADS. | $29,999 |
| M00760709-I1-PL | 2022-09-08 | Plumbing | 2150 BROADWAY | REPLACEMENT OF ONE-SHOWER, THREE-LAV, TWO-WC ONE-TUB, ONE-SINK-RES, ONE-DISHWASHER AND ONE-COOKING EQUIP-RES. RELOCATION OF THREE SPRINKLER HEADS. | $29,999 |
| M00701693-I1-PL | 2022-09-01 | Plumbing | 470 WEST 24 STREET | Plumbing Work as per Construction Drawings. | $5,800 |
| B00505239-I1-PL | 2022-06-21 | Plumbing | 712 MONROE STREET | PLUMBING MODIFICATION AS PER PLANS FILED HEREWITH | $10,000 |
| M00608396-I1-PL | 2022-05-04 | Plumbing | 1155 PARK AVENUE | Installation and modification of plumbing fixtures at existing residence 6N on floor 007. Plumbing work. there is to be no change of use, occupancy, or egress. | $14,000 |
| M00670455-S1-PL | 2022-04-06 | Plumbing | 77 BLEECKER STREET | PLUMBING FIXTURES AND COMBINATION OF APTS W211 & 212 FILED UNDER TPPN3/97 IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $10,000 |
| M00623134-I1-PL | 2022-02-01 | Plumbing | 201 WEST 70 STREET | REPLACE SINK, REMOVE AND CAP GAS STOVE. | $6,000 |
| M00566545-I1-PL | 2022-01-25 | Plumbing | 1 SUTTON PLACE SOUTH | Filing plumbing work in conjunction with interior renovation application. No change to use, egress or occupancy | $28,000 |
| M00549399-I1-PL | 2021-11-29 | Plumbing | 46 WEST 71 STREET | REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES IN CONJUNCTION WITH RENOVATION OF MULTI-DWELLING COOPERATIVE DWELLING AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, | $21,000 |
| M00552086-I1-PL | 2021-09-13 | Plumbing | 1199 PARK AVENUE | INSTALL, REPLACE AND RELOCATE PLUMBING FIXTURES IN APARTMENT 18D ON THE 18 FLOOR. IN CONJUNCTION WITH THE INTERIOR RENOVATION FILED UNDER APPLICATION #M00534288-I1. ALL AS PER PLAN | $27,000 |
| M00498242-I1-PL | 2021-08-02 | Plumbing | 930 PARK AVENUE | PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $14,300 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
