COMPANY RECORD · NEW YORK, NY
Dgc Capital Contracting C — permit history in New York, NY
Dgc Capital Contracting C appears on 97 New York permit records from 2019 through 2026, most often general construction (56.9% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 58 | 56.9% |
| Mechanical / HVAC | 44 | 43.1% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 3 |
| 2021 | 11 |
| 2022 | 20 |
| 2023 | 20 |
| 2024 | 28 |
| 2025 | 14 |
| 2026 | 5 |
Busiest year on record: 2024, with 28 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Bluewater Plbg& Htg Inc | 2 | 2024-06-14 |
| I.M.P. Plbg. & Htg. Corp | 2 | 2025-12-08 |
| A & M Warshaw Plbg & Htg | 1 | 2024-05-30 |
| A + Sprinkler Corp | 1 | 2023-12-20 |
| Armon Mechanical Inc | 1 | 2024-08-16 |
| Bluewater P&H, Inc | 1 | 2026-07-28 |
| Denair HVAC Inc | 1 | 2024-08-09 |
| Five Boro Associates Inc | 1 | 2024-05-31 |
| Ignite Plumbing & Heating | 1 | 2026-02-17 |
| L & N Plumbing, Inc | 1 | 2026-07-28 |
| M&T Plbg And Htg Co., Inc | 1 | 2024-02-27 |
| Plumbing Works Corp | 1 | 2024-04-24 |
12 companies are named alongside Dgc Capital Contracting C on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 66-26 METROPOLITAN AVENUE | 2026-08-06 |
| 1 ROCKEFELLER PLAZA | 2026-04-09 |
| 1998 BRUCKNER BOULEVARD | 2026-01-21 |
| 312 WEST 43 STREET | 2025-11-19 |
| 1951 ADAM CLAYTON POWELL JR BOULEVARD | 2025-10-17 |
| 55-15 GRAND AVENUE | 2025-09-23 |
| 1185 AVENUE OF THE AMERICAS | 2025-08-22 |
| 870 BROADWAY | 2025-06-25 |
| 523 FULTON STREET | 2025-04-04 |
| 296 WYTHE AVENUE | 2025-03-17 |
| 655 WEST 34 STREET | 2025-02-19 |
| 156-01 CROSS BAY BOULEVARD | 2025-01-14 |
| 723 MANHATTAN AVENUE | 2025-01-10 |
| 76 ST MARKS AVENUE | 2024-12-31 |
54 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $8,260,000, median $150,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
97 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01343775-S1-MS | 2026-08-06 | Mechanical / HVAC | 66-26 METROPOLITAN AVENUE | Application herewith filed for Mechanical work, as per plans. | $98,000 |
| Q01343775-I1-GC | 2026-07-02 | General construction | 66-26 METROPOLITAN AVENUE | The work is an interior remodel and reset of fixtures and departmental spaces. Relocated BOPIC, Optical and Member Services Desk and Lock Up at the front end of the store. New ser | $950,000 |
| M01367771-I1-GC | 2026-04-09 | General construction | 1 ROCKEFELLER PLAZA | Demolition and general construction on retail on 1st and 2nd floors as per plans. No change to use, egress or occupancy. | $63,000 |
| M01367996-I1-MS | 2026-04-09 | Mechanical / HVAC | 1 ROCKEFELLER PLAZA | Alterations to mechanical system on 1st and 2nd floor as plans. No change to use, egress or occupancy. | $35,000 |
| X01296331-I1-GC | 2026-01-21 | General construction | 1998 BRUCKNER BOULEVARD | Tenant infill of existing building; first floor and partial second floor. | $4,000,000 |
| M01266578-S1-MS | 2025-11-19 | Mechanical / HVAC | 312 WEST 43 STREET | FILING HEREWITH MECHANICAL WORK ASSOCIATED WITH INTERIOR RENOVATION OF EXISTING RETAIL SPACE AS PE PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $200,000 |
| M01266578-I1-GC | 2025-11-17 | General construction | 312 WEST 43 STREET | FILING HEREWITH INTERIOR RENOVATION OF EXISTING RETAIL SPACE AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY, | $2,125,000 |
| M01273839-I1-GC-CX | 2025-10-17 | General construction | 1951 ADAM CLAYTON POWELL JR BOULEVARD | APPLICATION IS FILED FOR THE INTERIOR FIT-OUT FOR A NEWTENANT, INCLUDING NEW NON-LOAD BEARING PARTITIONS, FINISHES,LIGHTING, AHU UNIT, DUCTWORK AND ALL OTHER RELATED WORK ASPER PLA | $108,625 |
| M01273839-I1-GC-CX | 2025-10-17 | Mechanical / HVAC | 1951 ADAM CLAYTON POWELL JR BOULEVARD | APPLICATION IS FILED FOR THE INTERIOR FIT-OUT FOR A NEWTENANT, INCLUDING NEW NON-LOAD BEARING PARTITIONS, FINISHES,LIGHTING, AHU UNIT, DUCTWORK AND ALL OTHER RELATED WORK ASPER PLA | $108,625 |
| Q01146786-I1-GC-CX | 2025-09-23 | General construction | 55-15 GRAND AVENUE | FILING GC/ST FOR THE INSTALLATION OF AN AVI SYSTEM AND ASSOCIATED ELECTRICAL GEAR WITH BOLLARD AND COLUMN PROTECTION, STRIPING, AND SIGNAGE IMPROVEMENTS | $215,000 |
| M01212121-I1-GC | 2025-08-22 | General construction | 1185 AVENUE OF THE AMERICAS | Minor demolition with installation of new partitions, doors, ceilings and finishes on the 1st floor (Joe & the Juice) as per plans. No change to use, egress or occupancy. | $219,981 |
| M01212143-I1-MS | 2025-08-12 | Mechanical / HVAC | 1185 AVENUE OF THE AMERICAS | Installation of a new HVAC system on the 1st floor (Joe & the Juice) as per plans. No change to use, egress or occupancy. | $99,986 |
| M01180600-I1-GC | 2025-06-25 | General construction | 870 BROADWAY | #8927 - Interior renovations of existing Use Group 6 space for Sweetgreen. No change in egress, use, or occupancy. | $405,000 |
| M01180633-I1-MS | 2025-06-25 | Mechanical / HVAC | 870 BROADWAY | #8927 - Mechanical and Lighting modifications in Sweetgreen space. No change in egress, use or occupancy. | $263,000 |
| B01044719-I1-GC | 2025-04-04 | General construction | 523 FULTON STREET | Filed herewith renovation of retail space to construct a supermarket. No change of use, occupancy or egress under this application.. | $1,357,844 |
| B01176849-I1-GC | 2025-03-17 | General construction | 296 WYTHE AVENUE | #8908 - Interior renovation of existing Use Group 6 space for Joe & The Juice. No change in egress, use, or occupancy. | $250,000 |
| M01172929-I1-GC | 2025-02-19 | General construction | 655 WEST 34 STREET | Interior renovation of an existing Starbucks Kiosk within the Javits Center (2nd floor Taxi Level). | $110,000 |
| Q01152443-I1-GC | 2025-01-14 | General construction | 156-01 CROSS BAY BOULEVARD | Stop & Shop: Interior Alteration to construct rated closet to enclose existing Automatic Transfer Switch. | $1,000 |
| B01033499-I1-MS | 2025-01-10 | Mechanical / HVAC | 723 MANHATTAN AVENUE | Mechanical modification as per plans filed herewith | $116,003 |
| B07995708-I1-MS | 2024-12-31 | Mechanical / HVAC | 76 ST MARKS AVENUE | FILING HEREWITH MECHANICAL SYSTEMS APPLICATION AS PER PLANS SUBMITTED. | $97,400 |
| B07995586-I1-GC | 2024-12-17 | General construction | 76 ST MARKS AVENUE | Filing herewith application for interior renovations as per plans submitted. | $300,000 |
| Q01063085-I1-GC | 2024-12-16 | General construction | 106-24 71 AVENUE | OT-GC Cosmetic Work as per plans filed herewith. No change in use, Egress or Occupancy under this ALT2 application. | $475,023 |
| M01140867-I1-GC | 2024-12-13 | General construction | 30 ROCKEFELLER PLAZA | GENERAL CONSTRUCTION FOR COMMERCIAL TENANT FIT OUT RENOVATIONS AT CELLAR (RINK LEVEL) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $750,000 |
| M01140887-I1-MS | 2024-12-13 | Mechanical / HVAC | 30 ROCKEFELLER PLAZA | MECHANICAL WORK ASSOCIATED WITH COMMERCIAL TENANT FIT OUT RENOVATIONS AT CELLAR (RINK LEVEL) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $150,000 |
| M00954229-I1-MS | 2024-12-10 | Mechanical / HVAC | 30 ROCKEFELLER PLAZA | Alterations in commercial kitchen and ventilation systems on cellar as per plans. No change to use, egress or occupancy. | $35,000 |
| M01078924-I1-GC | 2024-12-10 | General construction | 30 ROCKEFELLER PLAZA | General construction work on cellar as per plans. No change to use, egress or occupancy. | $55,000 |
| M01097423-I1-GC-CX | 2024-12-02 | Mechanical / HVAC | 30 ROCKEFELLER PLAZA | APPLICATION FILED FOR THE INTERIOR FIT OUT OF A RETAIL SPACE, INCLUDING NEW NONLOAD BEARING PARTITIONS, FINISHES, LIGHTING, RELOCATION OF DIFFUSERS & DUCTWORK, AND ALL OTHER ASSOCI | $381,000 |
| M01097423-I1-GC-CX | 2024-12-02 | General construction | 30 ROCKEFELLER PLAZA | APPLICATION FILED FOR THE INTERIOR FIT OUT OF A RETAIL SPACE, INCLUDING NEW NONLOAD BEARING PARTITIONS, FINISHES, LIGHTING, RELOCATION OF DIFFUSERS & DUCTWORK, AND ALL OTHER ASSOCI | $381,000 |
| M01078923-I1-GC | 2024-11-29 | General construction | 30 ROCKEFELLER PLAZA | Demolition and construction work on cellar (concourse) as per plans. No change to use, egress or occupancy. | $815,000 |
| M01109855-I1-MS | 2024-11-29 | Mechanical / HVAC | 30 ROCKEFELLER PLAZA | Installation of commercial cooking kitchen and/or hood and duct system in in cellar (concourse) for Lobel's restaurant as per plans. No change to use, egress or occupancy. | $296,700 |
| M01118934-I1-GC | 2024-10-28 | General construction | 67 WALL STREET | #8903 - INTERIOR FITOUT FOR SWEETGREEN AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $55,000 |
| S01015761-I1-GC | 2024-09-30 | General construction | 85 BRICKTOWN WAY | Change of occupancy for new single mercantile BJs Wholesale Club occupancy of previous three (3) tenant occupied building. Work to include new windows and doors as per plans and | $5,071,000 |
| Q01072443-I1-GC | 2024-08-15 | General construction | 8900 SUTPHIN BOULEVARD | RENOVATION OF A STARBUCKS COFFEE SHOP. NEW INTERIOR PARTITIONS, WALL AND CEILING FINISHES. NEW STOREFRONT WALK UP WINDOW. NO CHANGE TO OCCUPANCY USE OR EGRESS. | $107,650 |
| Q01072443-S1-MS | 2024-08-15 | Mechanical / HVAC | 8900 SUTPHIN BOULEVARD | MODIFICATIONS TO EXISTING MECHANICAL DUCTWORK SYSTEM. NO CHANGE TO OCCUPANCY USE OR EGRESS. | $10,000 |
| S01073853-S1-MS | 2024-08-06 | Mechanical / HVAC | 85 BRICKTOWN WAY | INSTALL TWO EMERGENCY DEISEL GENERATORS. | $305,000 |
| M01015330-I1-GC | 2024-07-10 | General construction | 494 8 AVENUE | APPLICATION FILED FOR AN ALTERATION OF AN EXISTING RETAIL SPACE INCLUDING NEW NONLOAD BEARING PARTITIONS, FINISHES, LIGHTING, SIGNAGE, AND ALL OTHER RELATED WORK AS PER PLANS. NO C | $140,000 |
| M01048176-I1-GC | 2024-06-04 | General construction | 7 PENN PLAZA | OT-GC work as per plans filed herewith. No change in use, egress or occupancy. | $55,000 |
| S01022806-I1-GC | 2024-05-24 | General construction | 85 BRICKTOWN WAY | Herewith file for Interior renovation, work to include interior non-bearing partitions, doors, roof replacement on exist. rigid insulation to remain and work as per plans and obtai | $1,957,302 |
| M00796108-I1-GC | 2024-05-17 | General construction | 230 PARK AVENUE | General construction modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy | $916,006 |
| M00796112-I1-MS | 2024-05-17 | Mechanical / HVAC | 230 PARK AVENUE | Mechanical modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy | $160,012 |
| B01033446-I1-GC | 2024-05-15 | General construction | 723 MANHATTAN AVENUE | Interior Cosmetic work as per plans filed herewith. No change in use, egress or occupancy under our application | $323,138 |
| S01014758-I1-GC | 2024-04-10 | General construction | 85 BRICKTOWN WAY | Herewith file for Interior Demolition of existing interior non-bearing partitions as per plans and obtain Letter of Completion. | $299,032 |
| M00958029-I1-MS | 2024-03-07 | Mechanical / HVAC | 511 LEXINGTON AVENUE | Filing herewith Mechanical work as per plans filed herewith. No change to use, egress or occupancy. | $150,000 |
| M00957972-I1-GC | 2024-03-06 | General construction | 511 LEXINGTON AVENUE | Filing herewith renovation to an existing Starbucks location as per plans filed herewith. No change to use, egress or occupancy. | $299,995 |
| M00976648-I1-GC | 2024-02-27 | General construction | 655 WEST 34 STREET | Interior renovation of an existing Starbucks Kiosk within the Javits Center (Level 3). | $41,250 |
| M00959429-I1-MS | 2024-01-05 | Mechanical / HVAC | 30 ROCKEFELLER PLAZA | Alterations / modifications to existing ducts and associated piping. All other existing mechanical systems to remain. No change in use, occupancy, or egress. | $98,375 |
| M00956777-I1-GC | 2024-01-05 | General construction | 30 ROCKEFELLER PLAZA | Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. No change in use, egress, or occupancy. | $1,059,233 |
| M00884154-S2-MS | 2023-12-01 | Mechanical / HVAC | 1 LIBERTY PLAZA | Mechanical work for tenant space at 1st floor. | $28,006 |
| M00884154-I1-GC | 2023-11-27 | General construction | 1 LIBERTY PLAZA | Interior renovation for tenant space at 1st floor. No change in use, egress, or occupancy. | $438,033 |
| M08049583-I1-GC | 2023-09-08 | General construction | 140 WEST STREET | Interior Renovation of an existing 1,445 SF White Box Space. Scope includes construction of New Interior non-load bearing partitions and all associated floor, wall, ceiling finishe | $242,746 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
