COMPANY RECORD · NEW YORK, NY
D'onofrio General Contrac — permit history in New York, NY
D'onofrio General Contrac appears on 40 New York permit records from 2021 through 2026, most often general construction (87.8% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 36 | 87.8% |
| Mechanical / HVAC | 5 | 12.2% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 7 |
| 2022 | 5 |
| 2023 | 9 |
| 2024 | 4 |
| 2025 | 11 |
| 2026 | 5 |
Busiest year on record: 2025, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Fire Zone Ventilation & S | 1 | 2022-05-04 |
1 companies are named alongside D'onofrio General Contrac on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1562 UNIONPORT ROAD | 2026-08-07 |
| 506 EAST 75 STREET | 2026-07-02 |
| 320 4 AVENUE | 2026-02-13 |
| 1938 80 STREET | 2026-01-08 |
| 1602 BATH AVENUE | 2025-12-17 |
| 31-01 20 AVENUE | 2025-10-27 |
| 99 27 STREET | 2025-10-22 |
| 850 12 AVENUE | 2025-09-25 |
| 179-25 BRINKERHOFF AVENUE | 2025-08-05 |
| 801 EAST 14 STREET | 2025-06-10 |
| 343 24 STREET | 2024-07-30 |
| 1 DAVIS AVENUE | 2024-06-11 |
| 35-08 VERNON BOULEVARD | 2023-03-16 |
| 321 EAST 63 STREET | 2023-03-07 |
21 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $13,706,000, median $340,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
40 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| X01437474-S1-MS | 2026-08-07 | Mechanical / HVAC | 1562 UNIONPORT ROAD | Contain leaking steam piping, remove existing steam piping and install new steam piping in place.Contain leaking steam piping, remove existing steam piping and install new steam pi | $20,000 |
| X01437474-I1-GC-CX | 2026-08-07 | General construction | 1562 UNIONPORT ROAD | Trench to required depth to expose existing steam piping, coordinate with manholes, restore trench to finished grade elevation. | $45,000 |
| M00929600-I1-GC-CX | 2026-07-02 | General construction | 506 EAST 75 STREET | Facade Repairs for Con Edison's East 74th Street Generating Station. No change to use, occupancy or egress. | $1,468,136 |
| B01305940-I1-GC | 2026-02-13 | General construction | 320 4 AVENUE | remove concrete pads in Consolidated Edison of NY Utility yard as per plans . No change to egress occupancy or use involved in this application | $10,000 |
| B01339889-I1-GC | 2026-01-08 | General construction | 1938 80 STREET | RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:REPAINTING WALL, CEILING AND RESURFACE FLOOR AS PER PLAN; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS AP | $100,000 |
| B00690793-I1-GC | 2025-12-17 | Mechanical / HVAC | 1602 BATH AVENUE | PROPOSE TO REPLACE EXISTING KITCHEN EXHAUST DUCT AND FAN AT ROOF AS INDICATED ON PLANS. REMEDY ECB VIOLATION NUMBER 3456205Z. | $7,500 |
| B00690793-I1-GC | 2025-12-17 | General construction | 1602 BATH AVENUE | PROPOSE TO REPLACE EXISTING KITCHEN EXHAUST DUCT AND FAN AT ROOF AS INDICATED ON PLANS. REMEDY ECB VIOLATION NUMBER 3456205Z. | $7,500 |
| Q01238068-I1-GC-CX | 2025-10-27 | General construction | 31-01 20 AVENUE | INSTALLATION OF MICRO PILES, CIVIL WORK, AND STRUCTURAL WORK FOR COMPRESSOR ENCLOSURE AND PIPE RACK. | $9,800,000 |
| B01201849-I1-GC-CX | 2025-10-22 | General construction | 99 27 STREET | CONCRETE FOUNDATIONS FOR ELECTRICAL EQUIPMENT (I.E. FEEDER TERMINATION STRUCTURE, DISCONNECT SWITCH STRUCTURES, BUS SUPPORTS, CCVT SUPPORTS, TRANSFORMER, PAR & LIGHTNING MAST); SEC | $8,345,480 |
| M00940438-I1-GC | 2025-09-25 | General construction | 850 12 AVENUE | Con Edison's 59th Street Station - SWARMP (GC work type) Facade Repairs. ......PAA - The asbestos documentation originally required for this application (V5) has changed, (An ACP-5 | $2,294,000 |
| Q01258149-I1-GC | 2025-08-05 | General construction | 179-25 BRINKERHOFF AVENUE | PARTIAL DEMOLITION OF REMAINING BUILDING FOUNDATION AS PER PLANS FILED HEREWITH. | $275,000 |
| B01227886-I1-GC-CX | 2025-07-28 | General construction | 99 27 STREET | INSTALLATION OF CONCRETE FOUNDATIONS ON PILES FOR PLACEMENT OF ELECTRICAL EQUIPMENT; AT CON EDISON'S GOWANUS SUBSTATION. | $3,065,083 |
| M00952096-I1-GC | 2025-06-10 | General construction | 801 EAST 14 STREET | ER MAIN SWARMP ARCH - Facade repairs proposed at Con Edison's East River Gen Station. Work depicted on drawing #s: T-001.00, G-001.00, thru G-004.00, A-101.00 thru A-105.00, A-201. | $214,000 |
| M00961603-I1-GC | 2025-06-10 | General construction | 801 EAST 14 STREET | Con Edison's East River Main Gen Station - Perform architectural facade repairs considered UNSAFE; and depicted on drawing #s: T-001.00, G-001.00, G-002.00, G-003.00, G-004.00, A-1 | $1,338,000 |
| Q01092842-I1-GC-CX | 2025-04-23 | General construction | 179-25 BRINKERHOFF AVENUE | CONSTRUCTION OF A TEMPORARY SUBSTATION. SUBSTATION TO INCLUDE CONCRETE AND TIMBER FOUNDATIONS, CMU FIRE WALL AND MISCELLANEOUS STEEL SUPPORTING STRUCTURES. | $7,657,407 |
| M00997556-I1-GC-CX | 2025-03-12 | General construction | 506 EAST 75 STREET | Remove and replace roofing material in the areas noted on the drawings being submitted with this application, R - 25. Make additional associated repairs as required. | $340,000 |
| Q00448235-S2-MS | 2024-09-27 | Mechanical / HVAC | 31-01 20 AVENUE | Relocate and replace exhaust fan, extend duct to new location. | $21,573 |
| B01010642-I1-GC-CX | 2024-07-30 | General construction | 343 24 STREET | INSTALLATION OF NEW FOUNDATIONS FOR ELECTRICAL EQUIPMENT HF-19, POTHEAD, AND BREAKER 4S/4X LCC PAD AT CON EDISONS GREENWOOD SUBSTATION. | $327,746 |
| S00935830-I1-GC-CX | 2024-06-11 | General construction | 1 DAVIS AVENUE | BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC | $1,600,000 |
| B00965237-I1-GC-CX | 2024-04-05 | General construction | 99 27 STREET | INSTALLATION OF FOUNDATIONS FOR ELECTRICAL EQUIPMENT; FEEDER TERMINATIONS, DISCON SWITCH, BUS SUPPORTS, CCVT SUPPORTS, SURGE ARRESTOR SUPPORTS, TRANSFORMER AND PAR, AND LIGHTNING M | $6,825,278 |
| S00802201-I1-GC | 2023-12-19 | General construction | 1 DAVIS AVENUE | Interior renovations on the 1st floor, as shown on the plans. No Change in use, occupancy or egress. | $20,000 |
| S00921780-I1-GC-CX | 2023-10-23 | General construction | 1 DAVIS AVENUE | BUILDING FACADE UPGRADES WHICH INCLUDE: BRICK VENEER REPAIRS/REPLACEMENT, BRICK REPOINTING AND CRACK REPAIRS, STEEL LINTEL REPLACEMENT/REPAIR, CLEAN/PAINT EXISTING STEEL, COSMETIC | $1,090,000 |
| M08034135-I1-GC-CX | 2023-09-05 | General construction | 850 12 AVENUE | Facade Repairs at Con Edison's 59th Street Gen Station. Landmark approval to perform work has been received, CNE-23-02145. (Cycle 9A) | $565,000 |
| M00745860-I1-GC-CX | 2023-04-17 | General construction | 506 EAST 75 STREET | Con Edison's 74th Street Station facade repairs - as per drawings being submitted: T-001.00, T-002.00, G-001.00, G-002.00, G-003.00, A-101.00, A-102.00, A-202.00, A-201.00, A-203.0 | $400,000 |
| Q00820791-I1-GC | 2023-03-16 | General construction | 35-08 VERNON BOULEVARD | INSTALL NEW CONCRETE FOUNDATION FOR LIGHTNING MAST AT CON EDISON'S RAINEY SUBSTATION. | $95,000 |
| Q00820791-I1-FO | 2023-03-16 | General construction | 35-08 VERNON BOULEVARD | INSTALL NEW CONCRETE FOUNDATION FOR LIGHTNING MAST AT CON EDISON'S RAINEY SUBSTATION. | $95,000 |
| Q00712285-I1-GC-CX | 2023-03-16 | General construction | 31-01 20 AVENUE | CIVIL WORK ONLY TO OPEN SPACE - REMOVE, REPLACE, INSTALL NEW STORM DRAINAGE TO EXISTING OUTFALL B. STRUCTURAL WORK - REPLACE EXISTING RETAINING WALL. INSTALL NEW CONCRETE PAVING. D | $13,706,000 |
| M08035702-I1-GC-CX | 2023-03-07 | General construction | 321 EAST 63 STREET | Replacement of Transformer #2 at Con Edison's East 63rd Street Substation. Work includes modification of concrete structural support, installation of new steel framing for equipmen | $860,000 |
| X00598506-I1-MS | 2023-02-14 | Mechanical / HVAC | 1610 MATTHEWS AVENUE | AC UNITS INSTALLATION AND ASSCOCIATED DUCT WORK FOR CON ED SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $1,021,092 |
| B00774054-I1-GC-CX | 2022-08-31 | General construction | 29 HUDSON AVENUE | Perform Facade Repairs for Con Edison's Hudson Avenue Fan House Building at the parapet & operating floor locations. Repairs represented by the following drawings: T-001.00, G-001. | $75,000 |
| M00676643-I1-GC | 2022-05-11 | General construction | 850 12 AVENUE | Make general repairs to roof R10 and R11 at Con Edison's 59th Street Generating Station. | $196,000 |
| X00598474-I1-GC | 2022-03-02 | General construction | 1610 MATTHEWS AVENUE | CON ED OFFICE SPACE RENOVATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $4,578,304 |
| B00619935-I1-GC-CX | 2022-02-14 | General construction | 1278 MCDONALD AVENUE | Installation of SPCC (Spill Prevention Controls & Counter-measures) improvements at Con Edison's Bensonhurst Substation. for transformer #1. | $503,000 |
| B00598115-I1-GC | 2022-01-05 | General construction | 8413 18 AVENUE | MODIFY THE EXISTING STOREFRONT. NO CHANGE IN USE, EXIST OR OCCUPANCY. | $20,000 |
| Q00615875-I1-GC-CX | 2021-12-13 | General construction | 35-08 VERNON BOULEVARD | Installation of new 12' high retaining wall at Con Edison's Rainey Substation. | $789,599 |
| B00559273-I1-GC | 2021-12-06 | General construction | 170 VAN SICKLEN STREET | Proposed legalizations of paved concrete slab patio in open space to rear of existing building and temporary storage shed height to be corrected . | $0 |
| Q00586861-I1-GC-CX | 2021-11-03 | General construction | 31-01 20 AVENUE | Expand Con Edison's Astoria Yard spare storage capabilities by constructing new transformer equipment pads; this project also proposes Spill Prevention Control and Counter-measure | $1,900,000 |
| Q00448235-I1-GC | 2021-06-09 | General construction | 31-01 20 AVENUE | CON ED- BDG 138-ASTORIA STAIR REPLACEMENT-REPLACEMENT OF ACONVENIENCE STAIR AND STAIR CANOPY WITH NEW STEEL STAIR ANDRAILING, INCLUDING NEW PERFORATED METAL TREADS WITH SLIPRESISTA | $135,875 |
| B00508438-I1-GC | 2021-05-12 | General construction | 8024 13 AVENUE | MINOR INTERIOR RENOVATION OF EXISTING APARTMENT UNIT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $46,900 |
| M00490351-I1-GC-CX | 2021-04-30 | General construction | 801 EAST 14 STREET | Steel repairs throughout Con Ed's East Riv Gen Station. Repairs to include: Replace roof between colum E35, E36 and the F line. Rem. terra. wall along col. E betw col 35 and 102, a | $1,700,000 |
| B00230287-I1-MS | 2021-02-12 | Mechanical / HVAC | 1443 BAY RIDGE PARKWAY | HEREBY FILING MECHANICAL EQUIPMENT INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $20,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
