COMPANY RECORD · NEW YORK, NY
Construction Management — permit history in New York, NY
Construction Management appears on 96 New York permit records from 2020 through 2026, most often mechanical / hvac (51.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 50 | 51.5% |
| General construction | 47 | 48.5% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 6 |
| 2021 | 8 |
| 2022 | 18 |
| 2023 | 10 |
| 2024 | 23 |
| 2025 | 18 |
| 2026 | 14 |
Busiest year on record: 2024, with 23 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Bluewater Plbg& Htg Inc | 7 | 2026-08-10 |
| J. Caiazzo Plbg & Htg Cor | 6 | 2025-09-30 |
| Plumbing Works Corp | 5 | 2024-09-11 |
| A Plus Plumbing Corp | 4 | 2026-03-20 |
| Copper Plumbing Inc | 3 | 2025-01-28 |
| Capitol Fire Sprinkler Co | 2 | 2026-07-10 |
| Sean Coakley P & H Inc | 2 | 2026-03-03 |
| Abco-Peerless Sprklr Corp | 1 | 2025-01-30 |
| Allstate Sprinkler LLC | 1 | 2025-07-29 |
| M&T Plbg And Htg Co., Inc | 1 | 2024-09-17 |
10 companies are named alongside Construction Management on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1224 FLUSHING AVENUE | 2026-08-10 |
| 2252 BROADWAY | 2026-08-07 |
| 182 SMITH STREET | 2026-07-21 |
| 96 SOUTH STREET | 2026-06-22 |
| 885 2 AVENUE | 2026-06-03 |
| 225 LIBERTY STREET | 2026-03-04 |
| 225 VARICK STREET | 2025-10-07 |
| 1175 THIRD AVENUE | 2025-10-07 |
| 1122 LEXINGTON AVENUE | 2025-09-24 |
| 43 WEST 23 STREET | 2025-06-24 |
| 24 UNION SQUARE EAST | 2025-06-17 |
| 23 WEST 23 STREET | 2025-05-19 |
| 2530 HYLAN BOULEVARD | 2025-04-25 |
| 1175 3 AVENUE | 2025-01-13 |
48 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $8,600,000, median $336,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
96 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B01421983-S1-MS | 2026-08-10 | Mechanical / HVAC | 1224 FLUSHING AVENUE | FILING HEREWITH MECHANICAL WORK AS PER PLANS SUBMITTED. NO CHANGE TO USE, EGRESS AND OCCUPANCY. | $510,000 |
| B01421983-I1-GC | 2026-08-10 | General construction | 1224 FLUSHING AVENUE | Interior renovation of retail space in the cellar, 1st fl, & Roof, including tenant improvement, interior metal stud framing, interior finishes, and interior partitions. Related St | $3,600,000 |
| M01415254-I1-GC-CX | 2026-08-07 | General construction | 2252 BROADWAY | Remove interior finishes, door, sidelite on vestibule, & partitions. Install New walls, modify ceiling soffit, new flooring, casework, F&F equipment, reuse equipment, data device, | $263,450 |
| M01415254-I1-GC-CX | 2026-08-07 | Mechanical / HVAC | 2252 BROADWAY | Remove interior finishes, door, sidelite on vestibule, & partitions. Install New walls, modify ceiling soffit, new flooring, casework, F&F equipment, reuse equipment, data device, | $263,450 |
| B01358596-S1-MS | 2026-07-21 | Mechanical / HVAC | 182 SMITH STREET | Mechanical work in the Cellar, 1st floor and the Roof. No change in occupancy, use or egress. | $1,118,000 |
| B01358596-I1-GC | 2026-06-23 | General construction | 182 SMITH STREET | Interior renovation in the Cellar and 1st floor commercial space (Whole Foods Market). No change in occupancy, use or egress. | $1,170,000 |
| M01378756-I1-GC | 2026-06-22 | General construction | 96 SOUTH STREET | GENERAL CONSTRUCTION TAKING PLACE ON THE 1ST, MEZZ 1, 2ND, AND MEZZ 2 FLOORS AND ON THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,250,000 |
| M01378761-I1-MS | 2026-06-17 | Mechanical / HVAC | 96 SOUTH STREET | MECHANICAL WORK TAKING PLACE ON THE 1ST, MEZZ 1, 2ND, AND MEZZ 2 FLOORS AND ON THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $150,000 |
| M01242807-S3-MS | 2026-06-03 | Mechanical / HVAC | 885 2 AVENUE | Modifications to the Mechanical system on the 1st floor retail space for Whole Food Market. No change in occupancy, use or egress. | $500,000 |
| M01363305-I1-MS | 2026-05-11 | Mechanical / HVAC | 96 SOUTH STREET | MECHANICAL DEMOLITION TAKING PLACE ON THE 1ST, MEZZ, 2ND, AND 3RD FLOORS AND ON THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $250,000 |
| M01363288-I1-GC | 2026-03-31 | General construction | 96 SOUTH STREET | DEMOLITION TAKING PLACE ON THE 1ST, MEZZ, 2ND, AND 3RD FLOORS AND ON THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $1,250,000 |
| M01324908-S2-MS | 2026-03-04 | Mechanical / HVAC | 225 LIBERTY STREET | Removal and modification of mechanical system in a retail space. | $10,000 |
| M01242807-S2-GC | 2026-02-12 | General construction | 885 2 AVENUE | General Construction for Interior renovation for retail space Whole Foods Market on the First floor. No change to occupancy, use or egress. | $1,595,000 |
| M01324908-I1-GC | 2026-01-27 | General construction | 225 LIBERTY STREET | Renovations to existing retail space. General construction, inclusive of demolition, carpentry/drywall. | $180,000 |
| M01292533-S1-MS | 2025-10-07 | Mechanical / HVAC | 225 VARICK STREET | HVAC MODIFICATIONS FOR 3RD FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. | $65,000 |
| M01254638-I1-GC | 2025-10-07 | General construction | 1175 THIRD AVENUE | Interior renovations to create a Boiler room on the Mezz level for tenant space (Whole Food Market). No change in occupancy, use or egress. | $95,630 |
| M01292533-I1-GC | 2025-10-02 | General construction | 225 VARICK STREET | INTERIOR RENOVATION OF 3RD FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $120,000 |
| M01254638-S1-MS | 2025-10-01 | Mechanical / HVAC | 1175 THIRD AVENUE | Installation of new Electric Boilers on Mezzanine tenant space (Whole Foods Market). No change in occupancy, use or egress. | $12,800 |
| M01193821-S1-MS | 2025-09-24 | Mechanical / HVAC | 1122 LEXINGTON AVENUE | EATALY-- INSTALLATION OF NEW HVAC AND DISTRIBUTION FOR CAFE BUILD-OUT PER PLANS FILED. | $330,000 |
| M01193821-I1-GC | 2025-08-12 | General construction | 1122 LEXINGTON AVENUE | EATALY CAFFE-- General construction inclusive of partitions work for cafe build-out as per plans filed. No change to use, egress, or occupancy. | $750,000 |
| M01236419-I1-MS | 2025-06-24 | Mechanical / HVAC | 43 WEST 23 STREET | Proposed modification of mechanical duct work on the 8th floor, all as per plans. No change of use, occupancy, or use. | $25,000 |
| M01235746-I1-GC | 2025-06-24 | General construction | 43 WEST 23 STREET | Proposed minor interior alteration for the 8th floor, all as per plan. No change to egress or occupancy, or use. | $100,000 |
| M01209218-I1-GC | 2025-06-17 | General construction | 24 UNION SQUARE EAST | INTERIOR RENOVATIONS FOR GAMING FACILITY FITOUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-CO# M01194051-I1. | $1,038,481 |
| M01206673-I1-MS | 2025-06-17 | Mechanical / HVAC | 24 UNION SQUARE EAST | MODIFICATIONS TO HVAC SYSTEM FOR GAMING FACILITY FITOUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FILED IN CONJUNCTION WITH ALT-CO# M01194051-I1. | $230,863 |
| M01217116-I1-GC | 2025-05-19 | General construction | 23 WEST 23 STREET | GENERAL CONSTRUCTION ON THE 1ST FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $300,000 |
| S01178835-S1-MS | 2025-04-25 | Mechanical / HVAC | 2530 HYLAN BOULEVARD | FILING HEREWITH MECHANICAL WORK INCLUDING THE INSTALLATION OF TYPE I HOOD AND KITCHEN EXHAUST AT 1ST FLOOR. | $178,500 |
| S01178835-I1-GC | 2025-04-25 | General construction | 2530 HYLAN BOULEVARD | FILING HEREWITH RENOVATION OF EXISTING SPACE AS PER PLANS. | $821,100 |
| M01146489-S2-MS | 2025-01-13 | Mechanical / HVAC | 1175 3 AVENUE | Mechanical work in conjunction with interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings filed herewith. No change to occupancy, use, or egr | $20,000 |
| M01146489-I1-GC | 2025-01-13 | General construction | 1175 3 AVENUE | Interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings filed herewith. No change to occupancy, use, or egress. | $309,052 |
| M01144188-I1-GC | 2025-01-10 | General construction | 30 ROCKEFELLER PLAZA | INTERIOR RENOVATION OF CELLAR RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $765,555 |
| M01085805-S1-MS | 2025-01-10 | Mechanical / HVAC | 409 EAST 14 STREET | Mechanical work on the 1st floor. No change in occupancy, use or egress. | $750,000 |
| M01144188-S2-MS | 2025-01-07 | Mechanical / HVAC | 30 ROCKEFELLER PLAZA | MODIFICATIONS TO HVAC DUCT, COMMERCIAL COOKING AND VENTILATION SYSTEM @ SPACE CO03 SHAKE SHACK RESTAURANT. | $166,425 |
| X01128491-I1-GC | 2024-11-25 | General construction | 5520 BROADWAY | INTERIOR RENOVATION OF GROUND FLOOR RETAIL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $811,440 |
| X01128491-S2-MS | 2024-11-25 | Mechanical / HVAC | 5520 BROADWAY | HVAC MODIFICATIONS FOR GROUND FLOOR RETAIL SPACE AS PER PLANS FILED HEREWITH. | $176,400 |
| M01085805-I1-GC | 2024-11-18 | General construction | 409 EAST 14 STREET | Interior renovations on the 1st floor. No change in occupancy, use or egress. | $2,750,000 |
| M01085732-S1-MS | 2024-11-08 | Mechanical / HVAC | 301 WEST 50 STREET | Mechanical work on the 1st floor. No change in occupancy, use or egress. | $750,000 |
| M01085732-I1-GC | 2024-11-01 | General construction | 301 WEST 50 STREET | Interior renovations on the 1st floor. No change in occupancy use, or egress. | $2,750,000 |
| M01027173-I1-GC | 2024-08-14 | General construction | 270 GREENWICH STREET | General Construction including interior framing and finishes as per plans filed herewith. No changes to egress, occupancy or use. | $272,000 |
| B01050314-I1-GC | 2024-08-13 | General construction | 490 FULTON STREET | THIS PROJECT INCLUDES TENANT FIT OUT ON GROUND AND SECOND FLOOR, EXTERIOR WORK AND ROOF PENETRATION WORK AS PER PLAN FILED HEREWITH. RELATED MECHANICAL, PLUMBING, SPRINKLER/STANDP | $1,566,000 |
| B01050314-S5-MS | 2024-08-08 | Mechanical / HVAC | 490 FULTON STREET | Installation of refrigeration system related work for the tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050233 filed at | $700,000 |
| B01050314-S4-MS | 2024-08-08 | Mechanical / HVAC | 490 FULTON STREET | Mechanical work related to tenant fit out at 490 Fulton St as per plans filed herewith. This application is related to application B01050233 filed at 25 Elm Place and B01050278 fil | $394,500 |
| B01050278-I1-GC | 2024-08-01 | General construction | 484 FULTON STREET | THIS PROJECT INCLUDES TENANT FIT OUT ON GROUND AND SECOND FLOOR, EXTERIOR WORK AND ROOF PENETRATION WORK AS PER PLAN FILED HEREWITH. RELATED MECHANICAL, PLUMBING, SPRINKLER/STANDP | $234,000 |
| B01050233-S4-MS | 2024-08-01 | Mechanical / HVAC | 25 ELM PLACE | Mechanical work related to tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050278 filed at 484 Fulton St and B01050314 fil | $618,500 |
| B01050233-I1-GC | 2024-08-01 | General construction | 25 ELM PLACE | THIS PROJECT INCLUDES TENANT FIT OUT ON GROUND AND SECOND FLOOR, EXTERIOR WORK AND ROOF PENETRATION WORK AS PER PLAN FILED HEREWITH. RELATED MECHANICAL, PLUMBING, SPRINKLER/STANDP | $1,200,000 |
| B01050233-S5-MS | 2024-08-01 | Mechanical / HVAC | 25 ELM PLACE | Installation of refrigeration system related work for the tenant fit out at 25 Elm Place as per plans filed herewith. This application is related to application B01050278 filed at | $700,000 |
| M01027173-S1-MS | 2024-06-11 | Mechanical / HVAC | 270 GREENWICH STREET | Mechanical work for the demo of existing piping and installation of new piping as per plans filed herewith. No changes to use, egress or occupancy. | $875,000 |
| Q00972537-S1-MS | 2024-05-15 | Mechanical / HVAC | 46-20 QUEENS BOULEVARD | HVAC MODIFICATIONS FOR GROUND FLOOR EXISTING RETAIL SPACE AS PER PLANS FILED HEREWITH. | $131,000 |
| Q00972537-I1-GC | 2024-05-14 | General construction | 46-20 QUEENS BOULEVARD | INTERIOR RENOVATION OF GROUND FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $587,000 |
| M01014168-S2-MS | 2024-05-02 | Mechanical / HVAC | 1175 3 AVENUE | Installation of mechanical devices and ductwork is shown on the drawings filed herewith change in occupancy use or egress. | $452,500 |
| M01014168-I1-GC | 2024-05-02 | General construction | 1175 3 AVENUE | Interior renovation to include partitions, ceiling, doors, and finishes as shown on drawings. No change to occupancy, use, or egress. | $1,544,229 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
