Coast To Coast Permitsllc appears on 51 New York permit records from 2021 through 2026, all of them general construction.
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 51 | 100% |
Activity by year
| Year | Permits issued |
|---|---|
| 2021 | 2 |
| 2022 | 4 |
| 2023 | 12 |
| 2024 | 13 |
| 2025 | 12 |
| 2026 | 8 |
Busiest year on record: 2024, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 1 MANHATTAN PLAZA | 2026-08-26 |
| 848 WASHINGTON STREET | 2026-07-13 |
| 1 PIER 16 | 2026-07-02 |
| 410 LAFAYETTE STREET | 2026-06-05 |
| 146 FURMAN STREET | 2025-09-23 |
| 1568 AIR BROADWAY | 2024-11-01 |
| 11 FRANKLIN STREET | 2023-09-01 |
| 413 WEST 14 STREET | 2023-07-17 |
| 318 LAFAYETTE STREET | 2022-04-25 |
9 distinct addresses on record. Declared value on record runs from $4,950 to $20,500, median $5,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
51 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01433976-I1-GC | 2026-08-26 | General construction | 1 MANHATTAN PLAZA | Temporary installations to be used on a temporary event LAIKA Wildwood Portal Tour. All installations are to be removed upon completion of the event. | $5,000 |
| M01441298-I1-GC | 2026-08-11 | General construction | 1 MANHATTAN PLAZA | Temporary Installations to be used on a temporary event Floatie Kings. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01428626-I1-GC | 2026-07-20 | General construction | 1 MANHATTAN PLAZA | Temporary Installations to be used on a temporary event FIFA Ultra High Line. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01427959-I1-GC | 2026-07-13 | General construction | 848 WASHINGTON STREET | Temporary Installations to be used on a temporary event Standard Hotel. All the Installations are to be removed upon completion of the event | $5,000 |
| M01427960-I1-GC | 2026-07-13 | General construction | 1 MANHATTAN PLAZA | Temporary Installations to be used on a temporary event Standard Hotel. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01423775-I1-GC | 2026-07-02 | General construction | 1 PIER 16 | Temporary tent to be used on a temporary event. The Tent is to be removed upon completion of the event. | $5,000 |
| M01404620-I1-GC | 2026-06-05 | General construction | 410 LAFAYETTE STREET | Temporary Installation to be used on a temporary event Advil World Cup. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01409100-I1-GC | 2026-06-01 | General construction | 1 MANHATTAN PLAZA | Temporary Installation to be used on a temporary event Fox Box. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01335053-I1-GC | 2025-12-23 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP SPEAKER TOWERS FOR TIMES SQUARE NEW YEARS EVE 2026 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #905936. PRODUCER | $5,500 |
| M01331850-I1-GC | 2025-12-23 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP STAGING STRUCTURES & CAR DISPLAY FOR TSQ NEW YEARS EVE 2026 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #905936. | $20,500 |
| M01335061-I1-GC | 2025-12-23 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP CABLE CAMERA LINE W. SUPPORTING TOWERS FOR NEW YEARS EVE 2026 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. SAPO PERMIT #905936. PRODUCER RESPONS | $8,000 |
| M01335058-I1-GC | 2025-12-23 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP TENT STRUCTURE FOR TIMES SQUARE NEW YEARS EVE 2026 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #905936. PRODUCER | $10,000 |
| M01318670-I1-GC | 2025-11-17 | General construction | 1 MANHATTAN PLAZA | Temporary Installation to be used on a temporary event. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01292442-I1-GC | 2025-09-26 | General construction | 1 MANHATTAN PLAZA | Temporary Installation to be used on a temporary event NordVPN. All the Installations are to be removed upon completion of the event. | $5,000 |
| B01288811-I1-GC | 2025-09-23 | General construction | 146 FURMAN STREET | Temporary Installations to be used on a temporary event Brooklyn Bridge Park LED WALL. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01286595-I1-GC | 2025-09-16 | General construction | 1 MANHATTAN PLAZA | Temporary Installations to be used for temporary event Grasshopper 2025. All installations are to be removed upon completion of the event. | $5,000 |
| M01275314-I1-GC | 2025-08-26 | General construction | 1 MANHATTAN PLAZA | The scope of work to include temporary structure located at Washington Street closure (between W 13th Street and W 14th Street) for Breitling event schedule on 8/27/25. All tempora | $5,000 |
| M01239262-I1-GC | 2025-06-20 | General construction | 1 MANHATTAN PLAZA | Temporary Installations to be used for a temporary event Heaven Book Launch. All installations are to be removed upon completion of the event. | $5,000 |
| M01193083-I1-GC | 2025-03-20 | General construction | 1 MANHATTAN PLAZA | Temporary Installations to be used on a temporary event Grounded in the Stars. all the Installations are to be removed upon completion of the event. | $5,000 |
| M01177559-I1-GC | 2025-02-11 | General construction | 1 MANHATTAN PLAZA | Temporary Installation to be used on a temporary event. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01155963-S1-GC | 2024-12-20 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP SPEAKER TOWERS FOR TIMES SQUARE NEW YEARS EVE 2025 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #825733. PRODUCER | $5,500 |
| M01155963-S2-GC | 2024-12-20 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP TENT STRUCTURE FOR TIMES SQUARE NEW YEARS EVE 2025 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #825733. PRODUCER | $10,000 |
| M01155963-S3-GC | 2024-12-20 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP CABLE CAMERA LINE W. SUPPORTING TOWERS FOR NEW YEARS EVE 2025 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. SAPO PERMIT #825733. PRODUCER RESPONS | $8,000 |
| M01155963-I1-GC | 2024-12-20 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP STAGING STRUCTURES & CAR DISPLAY FOR TSQ NEW YEARS EVE 2025 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #825733. | $20,500 |
| M01155963-S4-GC | 2024-12-19 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP VIDEO TOWER FOR NEW YEARS EVE 2025 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. SAPO PERMIT #825733. PRODUCER RESPONSIBLE TO MONITOR EVENT WEATH | $5,000 |
| M01132357-I1-GC | 2024-11-01 | General construction | 1568 AIR BROADWAY | Temporary Installations to be used on a temporary even KILN event. All installation shall be removed upon completion of the event, | $5,000 |
| M01132082-I1-GC | 2024-10-28 | General construction | 1 MANHATTAN PLAZA | Temporary Installations to be used on a temporary event KLIN. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01125964-I1-GC | 2024-10-22 | General construction | 1 MANHATTAN PLAZA | Temporary structure installation for MLS Trophy event. All installation shall be removed upon completion of the event. | $5,000 |
| M01072707-I1-GC | 2024-07-02 | General construction | 1 MANHATTAN PLAZA | Temporary Installation, to be used on a temporary event Jack Links. All the Installations are to be removed upon completion of the event. | $5,000 |
| M01046480-I1-GC | 2024-05-08 | General construction | 1 MANHATTAN PLAZA | Temporary Installation, to be used on a temporary event. All the temporary constructions are to be removed upon completion of the event. | $5,000 |
| M01025450-I1-GC | 2024-04-09 | General construction | 1 MANHATTAN PLAZA | Temporary structure installation for WORLD'S LARGEST HOTDOG. All installation shall be removed upon completion of the event. | $5,000 |
| M01015694-I1-GC | 2024-03-13 | General construction | 1 MANHATTAN PLAZA | Temporary structure installation for event. All installation shall be removed upon completion of the event. | $5,000 |
| M00994157-I1-GC | 2024-01-25 | General construction | 410 LAFAYETTE STREET | Temporary structure installation for Mr + Mrs Smith event. All installation shall be removed upon completion of the event. | $5,000 |
| M00971305-S1-GC | 2023-12-22 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP SPEAKER TOWERS FOR TIMES SQUARE NEW YEARS EVE 2024 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #745943. PRODUCER | $5,500 |
| M00971305-I1-GC | 2023-12-22 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP STAGING STRUCTURES & CAR DISPLAY FOR TSQ NEW YEARS EVE 2024 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #745943. | $20,500 |
| M00971305-S3-GC | 2023-12-22 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP CABLE CAMERA LINE W. SUPPORTING TOWERS FOR NEW YEARS EVE 2024 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. SAPO PERMIT #745943. PRODUCER RESPONS | $8,000 |
| M00971305-S2-GC | 2023-12-22 | General construction | 1 MANHATTAN PLAZA | INSTALL & REMOVE TEMP TENT STRUCTURE FOR TIMES SQUARE NEW YEARS EVE 2024 PLAZA PARTNER EVENT, NO ALTERATION TO EXISTING STRUCTURES. TPA NOT REQUIRED. SAPO PERMIT #745943. PRODUCER | $10,000 |
| M00950443-I1-GC | 2023-10-23 | General construction | 1 MANHATTAN PLAZA | Temporary Installation to be used on a temporary event Vestis Bell Ringing. All the Installations are to be removed upon completion of the event. | $5,000 |
| M00947235-I1-GC | 2023-10-17 | General construction | 1 MANHATTAN PLAZA | Temporary Installation to be used on a temporary event TSX Hilton. All the Installations are to be removed upon completion of the event. | $5,000 |
| M00943557-I1-GC | 2023-10-06 | General construction | 410 LAFAYETTE STREET | Temporary Installation to be used on a temporary event Birkenstock. All the Installations are to be removed upon completion of the event. | $5,000 |
| B00921367-I1-GC | 2023-09-01 | General construction | 11 FRANKLIN STREET | Temporary Installation to be used on a temporary event NBA 2K24. All the Installations are to be removed upon completion of the event. | $5,000 |
| M00900211-I1-GC | 2023-07-17 | General construction | 413 WEST 14 STREET | Temporary Installation to be used on a temporary event TMNT- Teenage Mutant Ninja Turtles. All the Installations are to be removed upon completion of the event. | $5,000 |
| M00897224-I1-GC | 2023-06-30 | General construction | 1 MANHATTAN PLAZA | Temporary Installation to be used on a temporary event CIROC. All the Installations are to be removed upon completion of the event. | $5,000 |
| M00890601-I1-GC | 2023-06-20 | General construction | 1 MANHATTAN PLAZA | TEMPORARY INSTALLATION TO BE USED FOR A TEMPORARY EVENT. NETFLIX NYC, LOCATED ON SIDEWALK, AMC LINCOLN 1998 BROADWAY. INSTALLATIONS ARE TO BE REMOVED UPON COMPELETION OF THE EVENT. | $5,000 |
| M00862755-I1-GC | 2023-05-05 | General construction | 1 MANHATTAN PLAZA | Temporary structure installation for the movie Transformers. All installations are to be removed upon completion of the event. | $5,000 |
| M07999620-I1-GC | 2022-09-13 | General construction | 1 MANHATTAN PLAZA | Temporary tent structure located at open space in Battery Park for GMR Marketing. All installation shall be removed upon completion of the event. | $5,000 |
| M00771281-I1-GC | 2022-07-12 | General construction | 1 MANHATTAN PLAZA | Temporary structure for the roots event. All the structures are to be removed upon completion of the event. | $5,000 |
| M00732181-I1-GC | 2022-05-06 | General construction | 1 MANHATTAN PLAZA | Temporary construction / riser (28'w x 14'd x 8h) for London mayor press event. Structure to be removed upon completion of the event. | $5,000 |
| M00723969-I1-GC | 2022-04-25 | General construction | 318 LAFAYETTE STREET | Scope of work to include installation of temporary flower wall structure for Fenty perfume event scheduled between 04/29/22 to 05/02/22 | $5,000 |
| M00595215-I1-GC | 2021-10-06 | General construction | 1 MANHATTAN PLAZA | Temporary fountain structure to be located at Duffy Square, New York. All installation shall be removed upon completion of event. | $5,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →