COMPANY RECORD · NEW YORK, NY
City Gas Htg Svc Co Inc — permit history in New York, NY
City Gas Htg Svc Co Inc appears on 73 New York permit records from 2019 through 2026, most often plumbing (89.5% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Plumbing | 68 | 89.5% |
| Mechanical / HVAC | 5 | 6.6% |
| Fire protection | 3 | 3.9% |
3 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 4 |
| 2020 | 9 |
| 2021 | 10 |
| 2022 | 11 |
| 2023 | 9 |
| 2024 | 12 |
| 2025 | 11 |
| 2026 | 10 |
Busiest year on record: 2024, with 12 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Hoxha Construction LLC | 14 | 2024-03-14 |
| Crossland Construction C | 9 | 2026-08-07 |
| The Cloone Group Inc | 6 | 2026-01-12 |
| Adn Contracting LLC | 3 | 2024-04-17 |
| Dutchess Cabinets Of Ny | 3 | 2026-01-21 |
| Everlast Solutions Corp | 1 | 2022-10-28 |
| Hotline Mechanical Inc | 1 | 2023-03-31 |
7 companies are named alongside City Gas Htg Svc Co Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 25 DOWNING STREET | 2026-08-07 |
| 627 9 AVENUE | 2026-07-15 |
| 506 WEST 170 STREET | 2026-07-06 |
| 510 WEST 170 STREET | 2026-07-06 |
| 259 BLEECKER STREET | 2026-02-20 |
| 565 WEST 173 STREET | 2026-02-05 |
| 44 EAST 67 STREET | 2026-01-21 |
| 107-30 71 ROAD | 2026-01-12 |
| 660 FT WASHINGTON AVENUE | 2025-09-24 |
| 243 EAST 17 STREET | 2025-08-07 |
| 765 GREENWICH STREET | 2025-07-11 |
| 16 DESBROSSES STREET | 2025-05-20 |
| 176 WEST HOUSTON STREET | 2025-04-01 |
| 37A BEDFORD STREET | 2025-03-31 |
58 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $60,000, median $12,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
73 permits; open the 50 most recent
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| M01429800-S1-PL | 2026-08-07 | Plumbing | 25 DOWNING STREET | interior renovation of existing apartment | $40,000 |
| M01390675-I1-PL | 2026-07-15 | Plumbing | 627 9 AVENUE | REMOVAL OF GAS BOILER AND REPLACE WITH WATER HEATER. | $3,500 |
| M01383522-I1-MS | 2026-07-15 | Mechanical / HVAC | 627 9 AVENUE | REGISTER HVAC UNITS. | $36,000 |
| M01359247-S1-PL | 2026-07-06 | Plumbing | 506 WEST 170 STREET | replacement of plumbing fixtures and the installation of new plumbing fixtures | $30,000 |
| M01359266-S1-PL | 2026-07-06 | Plumbing | 510 WEST 170 STREET | replace existing plumbing fixtures and add new plumbing fixtures | $30,000 |
| M01256889-S1-PL | 2026-02-20 | Plumbing | 259 BLEECKER STREET | Interior renovation of apt# 20, no change in use, egress or occupancy | $36,000 |
| M01344519-S1-PL | 2026-02-05 | Plumbing | 565 WEST 173 STREET | interior renovation of apartment- replace and add new plumbing's fixtures | $30,000 |
| M01264447-S1-PL | 2026-01-21 | Plumbing | 44 EAST 67 STREET | PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 3A ON THE 003 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $34,195 |
| Q01324216-S2-PL | 2026-01-12 | Fire protection | 107-30 71 ROAD | Filing to modify Plumbing and Sprinkler systems at 2nd floor as per plans. | $50,100 |
| Q01324216-S2-PL | 2026-01-12 | Plumbing | 107-30 71 ROAD | Filing to modify Plumbing and Sprinkler systems at 2nd floor as per plans. | $50,100 |
| M01218692-I1-PL | 2025-09-24 | Plumbing | 660 FT WASHINGTON AVENUE | REPLACE HOT WATER BOILER WITH HOT WATER HEATER AND REFILING OF APPLICATON NUMBERS M00998994-S1 AND 120939887 FOR NEW GAS PIPING AND INSTALLATION OF STORAGE TANKS. | $14,500 |
| M01222159-S1-MS | 2025-08-07 | Mechanical / HVAC | 243 EAST 17 STREET | INSTALL TWO (2) NEW EXHAUST VENTS FOR TWO (2) REPLACEMENT DIRECT-VENT BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $4,000 |
| M00887532-I1-PL | 2025-07-11 | Plumbing | 765 GREENWICH STREET | INSTALL REPLACEMENT GAS PIPING FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,000 |
| M01222159-I1-PL | 2025-07-10 | Plumbing | 243 EAST 17 STREET | INSTALL REPLACEMENT GAS PIPING FOR TWO (2) REPLACEMENT DIRECT-VENT GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $7,000 |
| M01197259-S1-PL | 2025-05-20 | Plumbing | 16 DESBROSSES STREET | PLUMBING WORK FOR GENERAL CONSTRUCTION FILING DOB NOW #M01197259-I1 INTERIOR RENOVATION AT APT. #3C4S LOCATED ON THE 3RD FLOOR. | $10,500 |
| M01157872-S1-PL | 2025-04-01 | Plumbing | 176 WEST HOUSTON STREET | interior renovation of apt # 15, all as per plans | $20,000 |
| M00989689-S1-PL | 2025-03-31 | Plumbing | 37A BEDFORD STREET | INTERIOR RENOVATION IN APARTMENT 51. ALL AS PER DOB PAPERWORK, PLANS AND APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $40,000 |
| M01113151-S2-PL | 2025-02-18 | Plumbing | 160 WEST 24 STREET | PL work as per plans filed. No change in use, occupancy or egress. | $16,800 |
| M01113151-S2-PL | 2025-02-18 | Fire protection | 160 WEST 24 STREET | PL work as per plans filed. No change in use, occupancy or egress. | $16,800 |
| M01113153-S2-PL | 2025-02-18 | Plumbing | 167 WEST 23 STREET | PL work as per plans filed. No change in use, occupancy or egress. | $8,500 |
| M01113153-S2-PL | 2025-02-18 | Fire protection | 167 WEST 23 STREET | PL work as per plans filed. No change in use, occupancy or egress. | $8,500 |
| M01075418-S1-PL | 2024-11-08 | Plumbing | 983 PARK AVENUE | Plumbing work in conjunction with interior renovations at existing apartment Unit 15C as per plans. No Change in Use, Egress or Occupancy under this application. | $10,000 |
| M01012485-S1-PL | 2024-10-21 | Plumbing | 500 WEST 165 STREET | interior renovation of apt # 5W | $15,000 |
| M01084034-I1-MS | 2024-09-30 | Mechanical / HVAC | 225 EAST 43 STREET | INSTALL TWO (2) NEW SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $40,000 |
| M01027513-I1-PL | 2024-05-30 | Plumbing | 171 EAST 84 STREET | PLUMBING WORK IN APARTMENT 21D IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN DOB NOW UNDER JOB# M01027435. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $24,000 |
| M00972117-S1-PL | 2024-04-17 | Plumbing | 238 MADISON AVENUE | FILING TO CAP EXISTING GAS AND MODIFY EXISTING GREASE TRAPS AND PLUMBING FIXTURES. | $26,500 |
| M00879744-I1-PL | 2024-04-05 | Plumbing | 332 WEST 19 STREET | CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS-FIRED BOILER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,000 |
| M01009874-S1-PL | 2024-03-26 | Plumbing | 227 10 AVENUE | GAS CONNECTION FOR REPLACEMENT GAS BOILER. | $1,000 |
| M00928965-S2-PL | 2024-03-19 | Plumbing | 135 EAST 74 STREET | Plumbing work in relation to interior renovation of apt 2b. No change in use, egress, or occupancy this application. | $41,800 |
| M00998994-S1-PL | 2024-03-14 | Plumbing | 660 FT WASHINGTON AVENUE | REFILING OF APPLICATION NO. 120939887 FOR THE INSTALLATION OF NEW GAS PIPING AND STORAGE TANKS. | $2,500 |
| M00997762-S1-PL | 2024-03-14 | Plumbing | 640 FT WASHINGTON AVENUE | REFILING OF APPLICATION NO. 120939878 TO INSTALL NEW GAS SERVICE, METER AND PIPING AND HOT WATER STORAGE TANKS. | $2,500 |
| M00979092-S1-PL | 2024-01-06 | Plumbing | 330 EAST 52 STREET | REPLACEMENT / RELOCATION OF PLUMBING FIXTURES AT APT#53 (5TH FLOOR). NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,000 |
| M00977378-S1-PL | 2024-01-02 | Plumbing | 615 FORT WASHINGTON AVENUE | REPLACE AND RELOCATE PLUMBING FIXTURES IN APT 5G (5TH FLOOR). NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,000 |
| M00929268-S1-PL | 2023-10-27 | Plumbing | 379 THIRD AVENUE | TEST AND REPAIR GAS LINE AS REQUIRED. | $5,000 |
| M00926348-I1-PL | 2023-10-23 | Plumbing | 417 WEST 47 STREET | PROPOSE TO INSTALL WATER HEATER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $5,000 |
| M00319258-I1-MS | 2023-08-07 | Mechanical / HVAC | 105 EAST 37 STREET | INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $1,000 |
| M00839448-I1-PL | 2023-06-14 | Plumbing | 127 WEST 85 STREET | CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS-FIRED BOILER. REPLACE INDIRECT HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,000 |
| M00726543-I1-PL | 2023-06-14 | Plumbing | 148 WEST 77 STREET | CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,000 |
| M00842564-I1-PL | 2023-06-01 | Plumbing | 157 EAST 75 STREET | Replace bathroom and kitchen fixtures as part of apartment renovation as per plans filed herwith. No change to use, egress or occupancy. | $14,000 |
| M08006386-S1-PL | 2023-03-31 | Plumbing | 400 WEST END AVENUE | PLUMBING UPDATES WITHING AN INTERIOR RENOVATION OF APARTMENT 17CD. NEW FIXTURES AND FITTING. | $60,000 |
| M00725908-S1-PL | 2023-02-15 | Plumbing | 509 WEST 110 STREET | REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES AT COMBINED APT 12BC. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,000 |
| M08038025-I1-PL | 2023-01-25 | Plumbing | 307 WEST BROADWAY | GAS REPIPE AS PER PLANS. | $30,000 |
| M00728253-I1-PL | 2022-12-29 | Plumbing | 410 EAST 13 STREET | Cap & remove 1 shower, relocate 1 lav, 1 wc | $3,000 |
| M00509354-I1-PL | 2022-10-28 | Plumbing | 40 PRINCE STREET | Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No | $36,000 |
| M00789464-S1-PL | 2022-10-25 | Plumbing | 515 WEST 110 STREET | REPLACEMENT OF PLUMBING FIXTURES AT APT 4C (4TH FLOOR). NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $18,000 |
| M00742490-I1-PL | 2022-09-16 | Plumbing | 130 WEST 3 STREET | CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT BOILER AND GAS BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $2,000 |
| M00761966-I1-PL | 2022-08-09 | Plumbing | 150 WEST 87 STREET | PLUMBING WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $12,000 |
| M00702390-S1-PL | 2022-07-25 | Plumbing | 259 BLEECKER STREET | INTERIOR RENOVATIONS IN APT. # 6,9 & 21 | $15,042 |
| M00681058-I1-PL | 2022-06-10 | Plumbing | 97 CROSBY STREET | CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS-FIRED BOILER ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $1,000 |
| M00580667-S1-PL | 2022-04-14 | Plumbing | 515 WEST 110 STREET | REPLACE, RELOCATE, NEW PLUMBING FIXTURES AT APTS 6C AND 6F (6TH FLOOR). NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $39,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
