COMPANY RECORD · NEW YORK, NY
Champion International Co — permit history in New York, NY
Champion International Co appears on 44 New York permit records from 2019 through 2026, most often general construction (59.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 26 | 59.1% |
| Mechanical / HVAC | 18 | 40.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 5 |
| 2022 | 8 |
| 2023 | 11 |
| 2024 | 5 |
| 2025 | 11 |
| 2026 | 1 |
Busiest year on record: 2023, with 11 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| Sean Coakley P & H Inc | 4 | 2025-08-19 |
| Fine Mechanical Corp | 3 | 2025-01-17 |
| Charles J. Dehart Jr P&H | 2 | 2025-05-16 |
| Mpc Plumbing & Heating In | 2 | 2024-05-21 |
4 companies are named alongside Champion International Co on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 30 WALES PLACE | 2026-01-21 |
| 208-01 NORTHERN BOULEVARD | 2025-11-06 |
| 570 LEXINGTON AVENUE | 2025-08-29 |
| 1 DONGAN AVENUE | 2025-07-15 |
| 261 5 AVENUE | 2025-05-16 |
| 2708 SNYDER AVENUE | 2025-04-15 |
| 166 NEWEL STREET | 2025-04-01 |
| 1161 VICTORY BOULEVARD | 2025-02-21 |
| 217 19 STREET | 2025-02-14 |
| 45 UNIVERSITY PLACE | 2024-09-18 |
| 350 WEST 31 STREET | 2024-07-02 |
| 394 CRAIG AVENUE | 2024-05-09 |
| 2911 86 STREET | 2023-11-17 |
| 2156 VICTORY BOULEVARD | 2023-10-02 |
23 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $396,450, median $60,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
44 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| S01113476-I1-GC | 2026-01-21 | General construction | 30 WALES PLACE | Proposed two story building. filed for an ADMINISTRATIVE PERMIT TO OBTAIN CERTIFICATE OF OCCUPANCY ONLY for application # 5P0008722 & ALT 349-88 | $0 |
| Q01308727-I1-MS | 2025-11-06 | Mechanical / HVAC | 208-01 NORTHERN BOULEVARD | Herewith filing to add exhaust fan to second floor soil room. No change in Use, Egress of Occupancy. | $900 |
| M01157856-I1-GC | 2025-08-29 | General construction | 570 LEXINGTON AVENUE | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | $124,948 |
| S01117053-I1-GC | 2025-07-15 | General construction | 1 DONGAN AVENUE | APPLICATION FILED HEREWITH TO INSTALL TWO NEW 18' X 8' PARKING PADS AT EXISTING RESIDENCE. | $10,000 |
| M01196808-I1-GC | 2025-05-16 | General construction | 261 5 AVENUE | Interior renovation to include demolition of existing and construction of new partitions in suite 510 and 515 for existing office space. no change in use, egress, or occupancy. | $164,923 |
| B01180242-I1-GC | 2025-04-15 | General construction | 2708 SNYDER AVENUE | minor interior renovation for 2nd floor community facility. update CO for 2nd floor only. | $253,575 |
| B01180242-S2-MS | 2025-04-11 | Mechanical / HVAC | 2708 SNYDER AVENUE | mechanical work including kitchen rangehood for 2nd floor community facility as shown on plans filed herewith | $175,000 |
| B00934866-I1-FO | 2025-04-01 | General construction | 166 NEWEL STREET | Interior cellar alterations. Lower cellar floor level. Lower crawlspace floor level. New rear steel deck and stairs. New areaway and stair. New enlarged openings. New cellar bathro | $60,000 |
| B00934866-I1-GC-CX | 2025-03-21 | General construction | 166 NEWEL STREET | Interior cellar alterations. Lower cellar floor level. Lower crawlspace floor level. New rear steel deck and stairs. New areaway and stair. New enlarged openings. New cellar bathro | $60,000 |
| S01173427-I1-MS | 2025-02-21 | Mechanical / HVAC | 1161 VICTORY BOULEVARD | INSTALLATION OF TWO MINI-SPLIT HEAT PUMPS. 24K AND 18K BTU | $9,000 |
| B01020143-I1-GC | 2025-02-14 | General construction | 217 19 STREET | CONSTRUCT FOUR STORY BUILDING WITH CELLAR. | $0 |
| B01020143-S2-MS | 2025-02-07 | Mechanical / HVAC | 217 19 STREET | HVAC APPLICATION/PLANS FILED IN CONJUNCTION WITH NB FOR NEW BUILDING. | $0 |
| S00908462-I1-ST | 2024-09-18 | General construction | 45 UNIVERSITY PLACE | Conversion of 2-family residence to a one family residence. Reconfiguration of interior partitions on 2nd floor & installation of new staircase on 1st fl. | $258,550 |
| M01028655-I1-GC | 2024-07-02 | General construction | 350 WEST 31 STREET | APPLICATION FILED FOR FACADE REPAIR (LOCAL LAW 11 of 1998 CYCLE #9) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $62,125 |
| M00990018-S1-MS | 2024-05-29 | Mechanical / HVAC | 261 5 AVENUE | Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy. | $75,480 |
| M00990018-I1-GC | 2024-05-29 | General construction | 261 5 AVENUE | Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy. | $121,812 |
| S01047417-I1-GC | 2024-05-09 | General construction | 394 CRAIG AVENUE | LEGALIZATOIN OF LANDSCAPE WALLS AND PAVERS IN FRONT YARD IN RESPONSE TO VIOLATION VI024-00810. NO CHANGE TO EXISTING BUILDING. | $0 |
| B00905365-I1-GC | 2023-11-17 | General construction | 2911 86 STREET | CONSTRUCTION OF ADA COMPLIANT ACCESSIBLITY RAMP. NO CHANGE IN USE AND OCCUPANCY, NO INCREASE IN BULK AND FAR | $5,000 |
| S08007865-I1-GC-CX | 2023-10-02 | General construction | 2156 VICTORY BOULEVARD | Removal of existing masonry stair and foundation at the front entry of the residence and replacement of a new foundation and stair at front entry. | $15,000 |
| S00878227-S2-MS | 2023-09-15 | Mechanical / HVAC | 211 RICHMOND HILL ROAD | PLANS AND DOCUMENTS FILED HEREWITH FOR INSTALLATION OF DUCTLESS HVAC SYSTEM | $4,500 |
| M08018697-I1-GC | 2023-08-30 | General construction | 350 WEST 31 STREET | APPLICATION FILED FOR A CHANGE IN USE AND OCCUPANCY ON THE 1ST FLOOR. WORK INCLUDES INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES FOR NEW ADA BATHROO | $11,250 |
| S00908462-I1-GC | 2023-08-29 | General construction | 45 UNIVERSITY PLACE | Conversion of 2-family residence to a one family residence. Reconfiguration of interior partitions on 2nd floor & installation of new staircase on 1st fl. | $258,550 |
| M00848322-I1-MS | 2023-08-25 | Mechanical / HVAC | 853 BROADWAY | Additions/Modifications to existing mechanical system. No change to use, egress, and occupancy. | $174,000 |
| M00848283-I1-GC | 2023-08-25 | General construction | 853 BROADWAY | Interior renovations as per plans herewith. No change to use, egress, and occupancy. | $124,000 |
| M08012677-I1-GC | 2023-08-23 | General construction | 350 WEST 31 STREET | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANC | $258,120 |
| M08012695-I1-MS | 2023-08-23 | Mechanical / HVAC | 350 WEST 31 STREET | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | $43,500 |
| S00878227-I1-GC-CX | 2023-07-21 | General construction | 211 RICHMOND HILL ROAD | PLANS AND DOCUMENTS FILED HEREWITH FOR INTERIOR RENOVATION OF TENANT SPACE AT CELLAR FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $71,000 |
| S00723922-I1-GC | 2023-04-02 | General construction | 257 POTTER AVENUE | APPLICATION FILED HEREWITH FOR A HORIZONTAL AND VERTICAL EXTENSION TO AN EXISTING ONE FAMILY DWELLING CONSISTING OF GENERAL CONSTRUCTION, AS PER PLANS. | $281,376 |
| M00763511-I1-GC | 2022-11-12 | General construction | 853 BROADWAY | Interior renovations as per plans filed herewith. No change in use, egress or occupancy. | $35,000 |
| M00763519-I1-MS | 2022-11-12 | Mechanical / HVAC | 853 BROADWAY | Repair and/or replacement of indicated mechanical system items as described in plans herewith. No change to use, egress, or occupancy. | $74,000 |
| M00281455-I1-MS | 2022-09-20 | Mechanical / HVAC | 853 BROADWAY | Installation of HVAC system in existing office space as per plan filed herewith. No change in use, egress, and occupancy. | $62,825 |
| M00705942-I1-GC | 2022-08-18 | General construction | 853 BROADWAY | Interior Renovations as per drawings filed here with. No change to use egress or occupancy. | $125,072 |
| M00671612-I1-MS | 2022-08-18 | Mechanical / HVAC | 853 BROADWAY | additions/modifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy. | $37,880 |
| M00674138-I1-GC | 2022-04-23 | General construction | 570 LEXINGTON AVENUE | Interior renovations filed herewith as shown on plans. No change in use, egress or occupancy. | $6,998 |
| S00636243-S1-MS | 2022-04-20 | Mechanical / HVAC | 1289 FOREST AVENUE | INSTALLATION OF ACCESSORY/VOLUNTARY AUTOMATIC STANDBY GENERATOR, TRANSFER SWITCH & RELATED EQUIPMENT IN OSP. | $1 |
| S00507853-I1-GC | 2022-01-13 | General construction | 32 MARGARETTA COURT | Horizontal and vertical enlargement to the existing 1-family detached residence including the addition of a 3rd story. | $396,450 |
| S00646548-I1-MS | 2021-12-29 | Mechanical / HVAC | 1161 VICTORY BOULEVARD | INSTALLATION OF MECHANICAL SYSTEMS IN CONJUNCTION WITH 520332934 DOC 04 | $50,000 |
| S00581124-I1-GC | 2021-09-23 | General construction | 101 TYRELLAN AVENUE | PROPOSED TENANT BUILD OUT FOR A DOCTOR'S OFFICE WITHIN THE 2ND FLOOR OF AN EXISTING 3-STORYBUILDING. | $88,426 |
| S00568445-I1-MS | 2021-09-23 | Mechanical / HVAC | 101 TYRELLAN AVENUE | MECHANICAL DUCT DISTRIBUTION IN TENANT BUILD OUT FOR A DOCTOR'S OFFICE WITHIN THE 2ND FLOOR OF AN EXISTING 3-STORYBUILDING. | $38,396 |
| S00378283-I1-MS | 2021-07-09 | Mechanical / HVAC | 657 CASTLETON AVENUE | PROPOSED MINOR INTERIOR RENOVATIONS TO EXISTING OFFICE SPACE. ALL AS PER PLAN FILED HERE WITH. | $8,000 |
| S00487997-I1-GC | 2021-04-15 | General construction | 669 CASTLETON AVENUE | PAA for 669 Castleton Ave. to revise layout of existing toilets on first floor and remove 6 doors to create arched opening in office suite. | $38,500 |
| S00301070-I1-MS | 2020-12-22 | Mechanical / HVAC | 1130 SOUTH AVENUE | PROPOSE INTERIOR RENOVATION OF 2ND FLOOR. ALL AS PER PLANS FILED HEREWITH. OT( GENERAL CONSTRUCTION) AND PLUMBING FILED UNDER SEPARATE APPLICATION. | $75,000 |
| S00418960-I1-MS | 2020-11-10 | Mechanical / HVAC | 101 TYRELLAN AVENUE | PROPOSED MS WORK TYPE APPLICATION FILED TO OBTAIN A CERTIFICATE OFCOMPLIANCE (EQUIPMENT USE PERMIT) FOR A ROOF MOUNTED CONDENSING UNIT. | $5,000 |
| S00257204-I1-MS | 2019-12-12 | Mechanical / HVAC | 101 TYRELLAN AVENUE | Proposed replacement of three (3) existing roof top HVAC units with new ductwork distribution for a proposed tenant build out for a doctors office on the 3rd floor of an existing 3 | $69,000 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
