COMPANY RECORD · NEW YORK, NY

C. D. E. Air-Conditioning — permit history in New York, NY

C. D. E. Air-Conditioning appears on 44 New York permit records from 2020 through 2026, most often mechanical / hvac (75% of the record).

Permit categories

CategoryPermitsShare
Mechanical / HVAC3675%
General construction1225%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20201
202216
202311
202415
20252
20263

Busiest year on record: 2022, with 16 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
I.M.P. Plbg. & Htg. Corp12023-07-06
Louis L.Buttermark & Sons12024-05-07

2 companies are named alongside C. D. E. Air-Conditioning on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
1625 BEDFORD AVENUE2026-05-04
2094 PITKIN AVENUE2026-04-15
501 BRIELLE AVENUE2026-04-07
128 PIERREPONT STREET2025-03-14
1675 BROADWAY2024-12-30
200 CLARKE AVENUE2024-11-18
126 MERIDIAN ROAD2024-10-01
3424 KOSSUTH AVENUE2024-09-12
236 EAST 3 STREET2024-07-12
695 PARK AVENUE2024-06-03
20 BATTERY PLACE2024-04-04
396 CLINTON STREET2024-03-14
1702 60 STREET2024-03-04
423 WEST 215 STREET2024-02-23

35 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $1,000 to $6,356,192, median $743,949. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

44 permits; open the full list
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
B01238139-I1-MS2026-05-04Mechanical / HVAC1625 BEDFORD AVENUEMECHANICAL WORK FOR STUDENT SERVICE BUILDING , PROJECT IS TO MODIFY THE EXISTING HVAC AND LIGHTING SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY$2,065,617
B01367069-I1-MS2026-04-15Mechanical / HVAC2094 PITKIN AVENUERemove and replace and install new AC Units as per plans submitted herewith.$2,200,000
S00581200-I1-MS2026-04-07Mechanical / HVAC501 BRIELLE AVENUEHerewith filing to replace split-system air conditioning units, cooling coils and upgrade HVAC controls as per the drawings. No change in use egress or occupancy$670,000
B00802720-I1-GC2025-03-14General construction128 PIERREPONT STREETRemove Gypsum board ceiling, framing and existing access panels as necessary to replace / install new fire dampers.$4,271,000
B00802156-I1-MS2025-03-14Mechanical / HVAC128 PIERREPONT STREETDisconnect and remove roof mounted Cooling Tower and provide new Chiller with structural base, new heat exchanger, air cooled condenser on roof. New Air Handler unit. Associate duc$4,271,000
B08012458-I1-MS2024-12-30Mechanical / HVAC1675 BROADWAYInstall new modulating Gas Burners, replace existing hot water pumps with variable speed motors & install 2-way control valves each floor. provide heating controls. Demo existing $2,879,000
S01014033-I1-MS2024-11-18Mechanical / HVAC200 CLARKE AVENUEProposed Mechanical work to remove existing RTU, PTAC, split system units, and rooftop toilet exhaust fans. Install new HVAC system as per plans. No change in use, egress, or occu$1,000,000
Q00589331-I1-MS2024-10-01Mechanical / HVAC126 MERIDIAN ROADHerewith filing to refurbish existing chillers, replace condensor water piping and upgrade the HVAC controls as per the drawings. No change in use, egress or occupancy.$1,485,000
X01019875-I1-MS2024-09-12Mechanical / HVAC3424 KOSSUTH AVENUERefurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS$5,214,327
M00199970-I1-MS2024-07-12Mechanical / HVAC236 EAST 3 STREETMECHANICAL WORK IN CONJUNCTION WITH ALT1 APPLICATION #123900939$50,000
M00600299-I1-GC-CX2024-06-03General construction695 PARK AVENUERemove and replace existing HVAC system from basement through roof as per plans. No change in use, egress, or occupancy.$2,345,000
M00600299-I1-GC-CX2024-06-03Mechanical / HVAC695 PARK AVENUERemove and replace existing HVAC system from basement through roof as per plans. No change in use, egress, or occupancy.$2,345,000
M00653429-I1-MS2024-04-04Mechanical / HVAC20 BATTERY PLACEInstallation of mechanical systems. Work related to NB application M00613188-I1.$1,000
B00348062-I1-MS2024-03-14Mechanical / HVAC396 CLINTON STREETreplacement of existing rooftop HVAC and split system air ac units and all new controls.$800,000
B00298829-I1-MS2024-03-04Mechanical / HVAC1702 60 STREETreplacement of existing rooftop HVAC and split system air ac units and all new controls.$573,000
M00493869-I1-MS2024-02-23Mechanical / HVAC423 WEST 215 STREETSLAB REPLACEMENT AT DSNY GARAGE BRONX 7/8 - MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$1,410,235
S00816450-I1-GC-CX2024-02-20Mechanical / HVAC309 NEW DORP LANEComplete HVAC system replacement. Existing gas fired RTU's to be replaced with DOAS/VRF HVAC system. DOAS to be air source heat pump with backup electric heat. VRF system to be spl$100,000
S00816450-I1-GC-CX2024-02-20General construction309 NEW DORP LANEComplete HVAC system replacement. Existing gas fired RTU's to be replaced with DOAS/VRF HVAC system. DOAS to be air source heat pump with backup electric heat. VRF system to be spl$100,000
S00816450-S2-GC2024-02-16General construction309 NEW DORP LANEProvide new ceilings and new enclosure to mechanical units.$100,000
M00634093-I1-GC2024-01-26General construction209 WEST 23 STREETArchitectural changes (Vault Repair) on the 1st floor & cellar as indicated on drawings.$32,000
S08001279-I1-MS2023-09-04Mechanical / HVAC1000M RICHMOND TERRACEMechanical work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback and 3rd floor ad indicated on drawings$3,400,000
B00896508-S1-MS2023-08-31Mechanical / HVAC506 SURF AVENUEInstallation of mechanical systems for Temporary Holding Facility, including all associated duct work.$130,000
S08001255-I1-GC2023-08-23General construction1000M RICHMOND TERRACEConstruction work on the cellar, 1st floor, 2nd floor, 2nd floor roof setback, 3rd floor as indicated on drawings$900,000
Q00270132-I1-MS2023-07-15Mechanical / HVAC92-15 NORTHERN BOULEVARDAPPLICATION FILILING TO REPLACE EXISTINH HVAC EQUIPMENT (AIR COOLED CONDENSING UNIT, CHILLER, PUMPS, AIR HANDLER UNITS, RETURN FANS, CHILLED WATER, HOT WATER PIPING, DUCTWORK AND A$850,000
M00437866-I1-MS2023-07-14Mechanical / HVAC306 WEST 54 STREETREPLACEMENT/UPGRADE EXISTING ROOFTOP HVAC EQUIPMENT FROM BUILDING ROOF A, ROOF B AND ROOF C AREAS.$1,200,000
B00644243-I1-GC-CX2023-07-06General construction120 RICHARDS STREETFiling herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.$1,050,000
B00644243-I1-GC-CX2023-07-06Mechanical / HVAC120 RICHARDS STREETFiling herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.$1,050,000
Q00491761-I1-MS2023-04-27Mechanical / HVAC60-5 MAIN STREETreplace existing hvac split systems in mech penthouse. Replace mechanical piping and replace ductwork in portion of first floor. No change to use egress or occupancy under this $737,898
Q00494761-I1-GC2023-04-27General construction60-5 MAIN STREETreplacing of hung ceilings in portion of first floor and mech penthouse to accommodate new ductwork layout and new lights. Replacement of a portion of roof for installation of new $150,871
X08032570-I1-MS2023-02-14Mechanical / HVAC2530 JEROME AVENUEPROPOSED REPLACEMENT-IN-KIND OF THE EXISTING HVAC AND BOILER SYSTEM AT ST. JAMES RECREATION CENTER, DUE TO HURRICANE IDA. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS $1,742,748
Q00713526-I1-MS2023-01-25Mechanical / HVAC134-26 225 STREETReplacement of existing air handling unit and associated rooftop condenser with minor ductwork. No change of use, egress, or occupancy under this application.$250,000
B00708228-I1-GC-CX2022-10-27General construction100 NORTH PORTLAND AVENUEHerewith filing to replace (2) existing cooling towers included and not limited to associated mechanical components (controls & piping) structural supports to replace steel dunnage$400,000
B00708228-I1-GC-CX2022-10-27Mechanical / HVAC100 NORTH PORTLAND AVENUEHerewith filing to replace (2) existing cooling towers included and not limited to associated mechanical components (controls & piping) structural supports to replace steel dunnage$400,000
Q00713610-I1-MS2022-10-05Mechanical / HVAC41-17 MAIN STREETRemove and replace the existing chiller heater in cellar. Remove rooftop cooling towers and condenser water pump equipment. no change of use, egress, or occupancy under this applic$1,250,000
B00558690-I1-MS2022-07-20Mechanical / HVAC2900 BEDFORD AVENUEInstalling an exhaust fan on roof$207,000
B00559254-I1-GC2022-06-21General construction2900 BEDFORD AVENUERemove and replace existing shaft walls for modification of duct work for new exhaust fan. patch paint and all. flash roof after the installation of steel support dunnage for fan$60,000
Q00720520-I1-GC2022-06-21General construction66-40 KISSENA BOULEVARDGENERAL CONSTRUCTION WORK FILED FOR QUEENS COLLEGE RAZRAN HALL UPGRADE. NO CHANGE TO USE, EGRESS OR OCCUPANCY$500,000
Q00720576-I1-MS2022-06-14Mechanical / HVAC66-40 KISSENA BOULEVARDHVAC UPGRADE FOR QUEENS COLLEGE RAZRAN HALL$6,356,192
X00600842-I1-MS2022-06-06Mechanical / HVAC1400 PELHAM PARKWAYReplacement of HVAC system in auditorium at 4th and 5th floors. No change in use, egress, or occupancy.$413,000
Q00576698-I1-MS2022-05-23Mechanical / HVAC193-20 HORACE HARDING EXPRESSWAYRooftop work includes replacement of existing air-handling unit with new 30-ton unit. Repairs will be made to the roof deck but work does not touch the existing metal deck or stru$100,000
Q00575128-I1-GC2022-05-16General construction193-20 HORACE HARDING EXPRESSWAYRooftop work includes repairs to the roof deck and eave. No change to the metal deck or structural members. No change to st. systems, electrical load or pl. (adjust to gas pipin$736,720
M00245346-I1-MS2022-05-02Mechanical / HVAC209 WEST 23 STREETreplacement of existing rooftop HVAC and split system air ac units and all new controls.$750,000
M00474894-I1-MS2022-04-26Mechanical / HVAC427 GANSEVOORT STREETMECHANICAL WORK BEING FILED IN CONJUNCTION WITH ALT-CO APPLICATION M00477663.$230,000
X00333905-I1-MS2022-03-19Mechanical / HVAC910 MORRIS AVENUEfiling herewith mechanical plans in conjunction with alt 1 210181328$1,500,000
Q00613113-I1-MS2022-02-24Mechanical / HVAC150-20 134 STREETRedesign of existing chiller system at NYC DEP Jamaica WRRF.$129,600
S00658405-I1-MS2022-02-07Mechanical / HVAC78 HOWARD AVENUEINSTALL NEW MECHANICAL WORK ON FIRST AND SECOND FLOOR AT SCHOOL. NO CHANGE IN USE, EGRESS, AND OCCUPANY.$156,750
S00662554-I1-MS2022-02-07Mechanical / HVAC78 HOWARD AVENUEINSTALL NEW MECHANICAL WORK ON FIRST AND SECOND FLOOR AT COTTAGE AREA. NO CHANGE IN USE, EGRESS, AND OCCUPANY.$26,700
B00244599-I1-MS2020-11-25Mechanical / HVAC709 MARCY AVENUEReconstruction of the multipurpose room in the Von King Cultural Center located in Herbert Von King Park$799,960

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →