COMPANY RECORD · NEW YORK, NY
Buildwise Construction Gr — permit history in New York, NY
Buildwise Construction Gr appears on 48 New York permit records from 2025 through 2026, most often general construction (73% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| General construction | 46 | 73% |
| Mechanical / HVAC | 17 | 27% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2025 | 12 |
| 2026 | 51 |
Busiest year on record: 2026, with 51 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| W.R. Plbg And Htg Corp | 26 | 2026-06-11 |
| Crossfield Plbg.&Htg | 2 | 2026-05-18 |
| Best Plumbing & HVAC Inc | 1 | 2026-04-23 |
| Rrp Plumbing Corp | 1 | 2026-06-24 |
4 companies are named alongside Buildwise Construction Gr on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 33-24 86 STREET | 2026-06-05 |
| 100-33 METROPOLITAN AVENUE | 2026-06-03 |
| 378 3 AVENUE | 2026-06-03 |
| 15-14 PARSONS BOULEVARD | 2026-06-03 |
| 161 SPRATT AVENUE | 2026-05-28 |
| 406 LINCOLN AVENUE | 2026-05-22 |
| 148 GRATTAN STREET | 2026-05-21 |
| 246 GATES AVENUE | 2026-05-18 |
| 95-07 71 AVENUE | 2026-04-30 |
| 1165 68 STREET | 2026-04-29 |
| 284 FLATBUSH AVENUE | 2026-04-28 |
| 1118 EAST 15 STREET | 2026-04-27 |
| 2611 AVENUE Z | 2026-04-23 |
| 934 59 STREET | 2026-04-17 |
47 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $10,619 to $640,560, median $86,522. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
48 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| Q01407944-I1-GC-CX | 2026-06-05 | General construction | 33-24 86 STREET | INTERIOR RENOVATION CELLAR, 1ST, 2ND AND 3RD FLOOR OF EXISTING 3 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTIN | $162,850 |
| Q01407944-I1-GC-CX | 2026-06-05 | Mechanical / HVAC | 33-24 86 STREET | INTERIOR RENOVATION CELLAR, 1ST, 2ND AND 3RD FLOOR OF EXISTING 3 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL PARTITION, FLOORING, CEILING AND PAINTIN | $162,850 |
| Q01406707-I1-GC | 2026-06-03 | General construction | 100-33 METROPOLITAN AVENUE | INTERIOR RENOVATION 1ST, 2ND FL AND 3RD FLOOR OF EXISTING 3 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGH | $54,742 |
| M01407415-I1-GC-CX | 2026-06-03 | Mechanical / HVAC | 378 3 AVENUE | INTERIOR RENOVATION SCOPE OF WORK AT CELLAR, 1ST. FL. IN 5 STORY COMMERCIAL BUILDING. CONSTRUCTION WORK AND MECHANICAL WORK AS PER PLAN. REPLACE KITCHEN HOOD IN 1ST FLOOR AND MAINT | $83,500 |
| M01407415-I1-GC-CX | 2026-06-03 | General construction | 378 3 AVENUE | INTERIOR RENOVATION SCOPE OF WORK AT CELLAR, 1ST. FL. IN 5 STORY COMMERCIAL BUILDING. CONSTRUCTION WORK AND MECHANICAL WORK AS PER PLAN. REPLACE KITCHEN HOOD IN 1ST FLOOR AND MAINT | $83,500 |
| Q01399702-I1-GC | 2026-06-03 | General construction | 15-14 PARSONS BOULEVARD | REPLACE THE EXTERIOR WALL VINYL SIDING, DRIVEWAY AND WALKWAY MATERIAL OF 2 STORY EXISTING BUILDING. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $90,463 |
| S01405015-I1-GC | 2026-05-28 | General construction | 161 SPRATT AVENUE | INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND, FLOOR OF EXISTING 2 STORY RESIDENTIAL BUILDING. CONSTRUCTION WORK AS PER PLAN. PARTITION AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, U | $62,000 |
| S01398705-I1-GC | 2026-05-22 | General construction | 406 LINCOLN AVENUE | INSTALL NEW FENCE, SIDING AND WINDOWS. CONSTRUCTION WORK AS PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $84,400 |
| B01371977-I1-GC-CX | 2026-05-21 | General construction | 148 GRATTAN STREET | Emergency alteration to remove collapsed roof, restore roof system, replace structural system per plan, and install new roofing assembly. No change in use, occupancy, or egress. Fi | $258,000 |
| B01399111-I1-GC | 2026-05-18 | General construction | 246 GATES AVENUE | INTERIOR RENOVATION OF CELLAR, BASEMENT, 1ST, 2ND, 3RD AND 4TH FLOOR OF EXISTING 4 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW PARTITION, FLOORIN | $216,222 |
| Q01394098-I1-GC-CX | 2026-04-30 | General construction | 95-07 71 AVENUE | RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING | $158,210 |
| Q01394098-I1-GC-CX | 2026-04-30 | Mechanical / HVAC | 95-07 71 AVENUE | RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTING | $158,210 |
| B01385683-I1-GC-CX | 2026-04-29 | Mechanical / HVAC | 1165 68 STREET | RENOVATION OF CELLAR, 1ST. FLOOR & 2ND FL OF EXISTING 2 STORY BUILDING. MECHANICAL WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTI | $227,000 |
| B01385683-I1-GC-CX | 2026-04-29 | General construction | 1165 68 STREET | RENOVATION OF CELLAR, 1ST. FLOOR & 2ND FL OF EXISTING 2 STORY BUILDING. MECHANICAL WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND PAINTI | $227,000 |
| B01392025-I1-GC-CX | 2026-04-28 | General construction | 284 FLATBUSH AVENUE | RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $74,213 |
| B01392025-I1-GC-CX | 2026-04-28 | Mechanical / HVAC | 284 FLATBUSH AVENUE | RENOVATION IN THE 1ST FLOOR OF EXISTING 3 STORY BUIDLING, CONSTRUCTION WORK, MECHANICAL WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $74,213 |
| B01383708-I1-GC | 2026-04-27 | General construction | 1118 EAST 15 STREET | PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. CONSTRUCTION WORK AS PER PLAN, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE | $85,103 |
| B01359041-I1-GC | 2026-04-23 | General construction | 2611 AVENUE Z | Temporary Trailer in Yard filed for Temp use permit | $41,461 |
| B01378329-I1-GC | 2026-04-17 | General construction | 934 59 STREET | RENOVATION OF THE EXIST. GARAGE AT THE REAR YARD. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $36,754 |
| B01383225-I1-GC-CX | 2026-04-10 | Mechanical / HVAC | 2375 EAST 12 STREET | INTERIOR RENOVATION OF CELLAR BASEMENT AND 1ST FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND | $126,000 |
| B01383225-I1-GC-CX | 2026-04-10 | General construction | 2375 EAST 12 STREET | INTERIOR RENOVATION OF CELLAR BASEMENT AND 1ST FLOOR OF EXISTING 2 STORY BUILDING. DEMOLITION AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILING AND | $126,000 |
| Q01380837-I1-GC | 2026-04-08 | General construction | 4037 GLEANE STREET | REPLACE LEFT SIDE EXISTING SIDING IN EXISTING 2.5 STORY BUILDING.DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $38,000 |
| B01350159-I1-GC | 2026-03-30 | General construction | 2467 EAST 12 STREET | Interior renovation limited to removal of non-load-bearing partitions. Reparation of roofing, windows, and siding. No change to existing occupancy, use, egress. | $95,085 |
| B01357884-I1-GC | 2026-03-23 | General construction | 1439 EAST 56 STREET | INTERIOR RENOVATION EXISTING 2 STORY BUILDING.WORK IN CELLAR, 1ST AND 2ND FLOOR. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. PARTITION, FLOORING, CEILING AND PAINTING THROUG | $84,900 |
| B01336856-I1-GC | 2026-03-20 | General construction | 100 BAY 25 STREET | JOB FILED HEREWITH FOR INTERIOR RENOVATION OF AN EX. 1-FAMILY 2-STORY FRAME, INCL. INTERIOR NON-LOADBEARING WALLS, NEW FINISHES, AND NEW BUILT-IN MILLWORK AS PER PLANS. NO CHANGE I | $353,700 |
| S01364455-I1-GC | 2026-03-19 | General construction | 260 MILTON AVENUE | RENOVATION BASEMENT AND 1ST FLOOR OF EXISTING 1 STORY BUILDING, REPAIR PARTITION, FLOORING AND PAINTING THROUGH OUT. DEMOLITION AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRE | $48,800 |
| M01370996-I1-GC-CX | 2026-03-18 | General construction | 31 CATHERINE STREET | RENOVATION THE STORE#1 ON 1ST FLOOR OF EXISTING 5 STORY BUILDING. INSTALL HVAC AND PARTITION. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $50,000 |
| M01370996-I1-GC-CX | 2026-03-18 | Mechanical / HVAC | 31 CATHERINE STREET | RENOVATION THE STORE#1 ON 1ST FLOOR OF EXISTING 5 STORY BUILDING. INSTALL HVAC AND PARTITION. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $50,000 |
| B01353577-I1-GC | 2026-03-12 | General construction | 1271 79 STREET | IN ORDER TO REMOVE ECB VIOLATION #: 35127508R. INTERIOR RENOVATION OF BASEMENT, 1ST & 2ND FL. OF EXIST. 2 STY BUILDING. DEMOLITION & CONSTRUCTION WORK AS PER PLAN. PARTITION & PAIN | $93,000 |
| S01365990-I1-GC | 2026-03-12 | General construction | 97 MAJOR AVENUE | INTERIOR RENOVATION IN CELLAR OF EXISTING 2 STORY BUILDING. NEW PARTITION, AND PAINTING THROUGH OUT. DEMOLITION AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCU | $10,619 |
| Q01360387-I1-GC | 2026-03-10 | General construction | 200-06 39 AVENUE | INTERIOR RENOVATION EXISTING 2 STORY BUILDING. WORK IN CELLAR, 1ST AND 2ND FLOOR. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL AND REPAIR PARTITION, FLOORING, CEILING | $152,794 |
| Q01365689-I1-GC-CX | 2026-03-09 | Mechanical / HVAC | 46-01 KISSENA BOULEVARD | Filing for interior renovation of existing KTV establishment. No change in egress, use and occupancy. | $185,000 |
| Q01365689-I1-GC-CX | 2026-03-09 | General construction | 46-01 KISSENA BOULEVARD | Filing for interior renovation of existing KTV establishment. No change in egress, use and occupancy. | $185,000 |
| Q01230334-S3-MS | 2026-03-02 | Mechanical / HVAC | 25-30 18 STREET | Mechanical in conjunction with i1 for construction to install 4 split HVAC units with condensers on the roof; Bathroom and Utility Room Ventilation; Ceiling Hung Heaters | $42,000 |
| Q01230334-I1-GC | 2026-02-26 | General construction | 25-30 18 STREET | Interior renovation- existing 3 story-3 family -1 removed partition; modify non bearing partitions, 1st install wood beams; new Lolli columns in cellar, roof mounted condensers; ne | $640,560 |
| B01358173-I1-GC | 2026-02-24 | General construction | 32 BAY 34 STREET | INTERIOR RENOVATION EXISTING 2 STORY BUILDING. WORK IN CELLAR, 1ST AND 2ND FLOOR. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL AND REPAIR PARTITION, FLOORING, CEILING | $164,400 |
| M01350861-I1-GC | 2026-02-20 | General construction | 149 SULLIVAN STREET | RENOVATION THE APARTMENT #1C ON 1ST FLOOR OF EXISTING 6 STORY BUILDING. DEMOLITION AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY. | $24,810 |
| B01353295-I1-GC-CX | 2026-02-19 | General construction | 4612 7 AVENUE | INTERIOR RENOVATION AT THE 1ST FLOOR STORE OF 3 STORY BUILDING. CONSTRUCTION WORK AS PER PLAN. INSTALL HVAC, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY | $45,956 |
| B01353295-I1-GC-CX | 2026-02-19 | Mechanical / HVAC | 4612 7 AVENUE | INTERIOR RENOVATION AT THE 1ST FLOOR STORE OF 3 STORY BUILDING. CONSTRUCTION WORK AS PER PLAN. INSTALL HVAC, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPANCY | $45,956 |
| M01341634-I1-GC-CX | 2026-02-03 | Mechanical / HVAC | 504 GRAND STREET | INTERIOR RENOVATION #510 WORK IN 1ST FL OF EXISTING 6 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL HVAC, PARTITION, CEILING AND PAINTING THROUGHOUT. N | $80,000 |
| M01341634-I1-GC-CX | 2026-02-03 | General construction | 504 GRAND STREET | INTERIOR RENOVATION #510 WORK IN 1ST FL OF EXISTING 6 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL HVAC, PARTITION, CEILING AND PAINTING THROUGHOUT. N | $80,000 |
| B01332430-I1-GC-CX | 2026-01-28 | General construction | 566 MONROE STREET | INTERIOR RENOVATION OF CELLAR, BASEMENT, 1ST & 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILI | $148,835 |
| B01332430-I1-GC-CX | 2026-01-28 | Mechanical / HVAC | 566 MONROE STREET | INTERIOR RENOVATION OF CELLAR, BASEMENT, 1ST & 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEILI | $148,835 |
| B01349400-I1-GC | 2026-01-28 | General construction | 370 UNION STREET | INTERIOR RENOVATION APARTMENT 2C OF EXISTING 4 STORY BUILDING. CONSTRUCTION WORK AS PER PLAN. INSTALL FLOORING, CEILING AND PAINTING THROUGHOUT. NO CHANGE IN EGRESS, USE, OR OCCUPA | $45,500 |
| B01347924-I1-GC-CX | 2026-01-27 | Mechanical / HVAC | 2107 67 STREET | PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. NEW HVAC, CONSTRUCTION WORK AS PER PLAN, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. | $118,950 |
| B01347924-I1-GC-CX | 2026-01-27 | General construction | 2107 67 STREET | PROPOSED INTERIOR RENOVATION OF CELLAR, 1ST & 2ND FLOOR OF EXISTING 2 STORY BUILDING. NEW HVAC, CONSTRUCTION WORK AS PER PLAN, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. | $118,950 |
| Q01345738-I1-GC | 2026-01-27 | General construction | 36-18 MAIN STREET | INTERIOR RENOVATION OF 11TH FL OF EXISTING 14 STORY BUILDING, DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN, PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN | $90,000 |
| Q01304148-I1-GC | 2026-01-20 | General construction | 118-05 12 AVENUE | REMOVE FRAM STORAGE IN REAR YARD. DEMOLITION WORK AS PER PLAN. JOB IS FILED TO RESOLVE ECB VIOLATION#39161281X AND 39161280Y. | $13,500 |
| B01339533-I1-GC-CX | 2026-01-14 | Mechanical / HVAC | 689 MADISON STREET | INTERIOR RENOVATION OF CELLAR, BASEMENT, 1ST AND 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEI | $146,836 |
| B01339533-I1-GC-CX | 2026-01-14 | General construction | 689 MADISON STREET | INTERIOR RENOVATION OF CELLAR, BASEMENT, 1ST AND 2ND FLOOR OF EXIST. 2 STORY BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. INSTALL NEW HVAC, PARTITION, FLOORING, CEI | $146,836 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
