COMPANY RECORD · NEW YORK, NY

Buch Construction, Inc — permit history in New York, NY

Buch Construction, Inc appears on 58 New York permit records from 2020 through 2026, most often general construction (58.3% of the record).

Permit categories

CategoryPermitsShare
General construction3558.3%
Mechanical / HVAC2541.7%

2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.

Activity by year

YearPermits issued
20202
20216
202211
202313
202413
202511
20264

Busiest year on record: 2023, with 13 permits. One project can account for several filings, so read this as filing activity rather than workload.

Named on the same permit

Name in sourceLinked permitsLast seen
Par Plumbing Co., Inc32025-12-19
M&T Plbg And Htg Co., Inc12024-04-19
Par Fire Protection LLC12025-12-19
Sirina Fire Prot Corp12024-08-02

4 companies are named alongside Buch Construction, Inc on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.

Where they worked

Address in sourceMost recent permit
225 WEST 57 STREET2026-05-26
136-50 ROOSEVELT AVENUE2025-12-10
11 MADISON AVENUE2025-10-09
1790 BROADWAY2025-07-18
1 CROSBY STREET2025-05-13
1080 LEGGETT AVENUE2025-04-28
223 MULBERRY STREET2025-02-11
66 HUDSON BOULEVARD2024-10-10
60 CHARLTON STREET2024-06-26
111 EIGHTH AVENUE2024-04-29
2501 GRAND CONCOURSE2024-03-15
440 9 AVENUE2024-01-25
1000 3 AVENUE2024-01-24
151 WEST 34 STREET2023-10-23

28 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $100 to $4,405,047, median $100,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.

Permits on record

58 permits; open the 50 most recent
PermitIssuedCategoryAddress in sourceScope as filedDeclared value
M01364085-I1-MS2026-05-26Mechanical / HVAC225 WEST 57 STREETHEREWITH FILING FOR INTERIOR MODIFICATIONS OF ASSOCIATED DUCTS, PIPING, AND DIFFUSERS IN SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.$17,650
M01364047-I1-GC2026-05-14General construction225 WEST 57 STREETHEREWITH FILING FOR INTERIOR RENOVATIONS OF THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. energy being filed under DOBB MH applicati$1,145,350
M01349927-I1-GC2026-03-18General construction225 WEST 57 STREETHEREWITH FILING FOR DEMOLITION OF THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.$467,950
M01349944-I1-MS2026-03-18Mechanical / HVAC225 WEST 57 STREETHEREWITH FILING FOR INTERIOR DEMOLITION OF EXISTING MECHANICAL SYSTEMS IN SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS.$17,650
Q01311871-I1-GC2025-12-10General construction136-50 ROOSEVELT AVENUEInterior renovations as per plans filed herewith, No change to use, egress or occupancy$66,000
Q01311871-S2-MS2025-12-09Mechanical / HVAC136-50 ROOSEVELT AVENUEInstallation of mechanical equipment as per plans filed herewith. No change to use, egress or occupancy$15,000
M01284280-I1-MS2025-10-09Mechanical / HVAC11 MADISON AVENUEModifications to the existing HVAC system and associated ducts and piping on the 17th Floor (Tempus) as per plans. No change to use, egress or occupancy.$95,000
M01284265-I1-GC2025-10-09General construction11 MADISON AVENUEArchitectural modifications to the 17th floor (Tempus) as per plans. No change to use, egress, or occupancy.$200,000
M01265834-I1-GC2025-09-05General construction225 WEST 57 STREETHEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$8,000
M01201868-I1-MS2025-07-18Mechanical / HVAC1790 BROADWAYherewith filing for alterations to the existing mechanical system as per plans. No change to use occupancy or egress.$2,500
M01197311-I1-GC2025-07-15General construction1790 BROADWAYHEREWITH FILING FOR ARCHITECTURE INTERIOR RENOVATIONS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.$25,000
M01215732-I1-GC2025-05-13General construction1 CROSBY STREET5th floor renovation to white box status. Minor plumbing work to be filed subsequently.$32,814
X01174240-I1-GC2025-04-28General construction1080 LEGGETT AVENUEMINOR INTERIOR AND EXTERIOR ALTERATION TO EXISTING AMAZON WAREHOUSE ON MEZZANINE AND FIRST FLOOR LEVEL INCLUDING STOREFRONT ENTRANCE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE $160,000
M01140784-I1-MS2025-02-11Mechanical / HVAC223 MULBERRY STREETREMOVAL AND INSTALLATION OF DISTRIBUTION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$78,900
M01140777-I1-GC2025-02-10General construction223 MULBERRY STREETREMOVAL AND INSTALLATION OF WALLS, DOORS, FLOOR FINISHES & CEILING OF AN EXISTING 1ST FLOOR STOREFRONT AS SHOWN ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$834,000
M01021844-S4-MS2024-10-10Mechanical / HVAC66 HUDSON BOULEVARDHereby filing to install new mechanical units and modify/install ductwork and piping for office fit out as shown on plans filed herewith. NO change to use, occupancy or egress.$2,000,000
M01054866-I1-GC2024-06-26General construction60 CHARLTON STREETThe primary scope of work under this application is the Interior Alteration of a Corporate office located on the 9th Floor of 60 Charlton Street. The work consists of new non-beari$286,160
M01054879-I1-GC2024-06-20General construction60 CHARLTON STREETHVAC alterations of the existing building system to support interior alterations of an existing corporate office on the 9th floor of the building.$8,030
M01021844-I1-GC2024-05-21General construction66 HUDSON BOULEVARDHereby filing to construct interior partitions, ceilings, finishes, and doors for office fit out as shown on plans filed herewith. NO change to use, occupancy or egress.$3,500,000
M01018177-I1-GC2024-04-29General construction111 EIGHTH AVENUEPropose to perform interior removal work on the Third Floor.$76,080
M01018830-I1-GC2024-04-29General construction111 EIGHTH AVENUEDemolition of piping and ductwork as indicated on plans.$545,790
X00951251-I1-MS2024-03-15Mechanical / HVAC2501 GRAND CONCOURSEMechanical modifications taking place on the cellar, 1st floor as per plans filed herewith. No change in use, egress or occupancy$625,250
X00951172-I1-GC2024-02-09General construction2501 GRAND CONCOURSEGeneral construction modifications taking place on the 1st floor as per plans filed herewith. No change in use, egress or occupancy$4,405,047
M00982818-I1-GC2024-01-25General construction440 9 AVENUEINSTALLATION OF DOOR AND MINOR PARTITION WORK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.$12,000
M00979888-I1-MS2024-01-24General construction1000 3 AVENUE8823 - Modification of Ductwork, Lighting and non bearing partitions in L'Oreal space. No change in egress, use, or occupancy.$233,469
M00979888-I1-MS2024-01-24Mechanical / HVAC1000 3 AVENUE8823 - Modification of Ductwork, Lighting and non bearing partitions in L'Oreal space. No change in egress, use, or occupancy.$233,469
M00979888-I1-GC2024-01-11Mechanical / HVAC1000 3 AVENUE8823 - Modification of Ductwork, Lighting and non bearing partitions in L'Oreal space. No change in egress, use, or occupancy.$233,469
M00979888-I1-GC2024-01-11General construction1000 3 AVENUE8823 - Modification of Ductwork, Lighting and non bearing partitions in L'Oreal space. No change in egress, use, or occupancy.$233,469
M00925759-I1-GC2023-10-23General construction151 WEST 34 STREETInterior renovation on the ground floor. There is no change in use egress or occupancy.$204,827
B00890419-S1-MS2023-09-12Mechanical / HVAC445 GOLD STREETMinor Mechanical work related to the General Commercial space tenant build out for Escape Room game space. No change to use, egress or occupancy.$100,000
B00890419-I1-GC2023-09-12General construction445 GOLD STREETGeneral Commercial space tenant build out for Escape Room game space. Mechanical and plumbing work to be filed subsequently. No change to use, egress or occupancy.$399,987
B00890419-S3-GC2023-09-12General construction445 GOLD STREETEnergy lighting work related to the General Commercial space tenant build out for Escape Room game space. No change to use, egress or occupancy.$100
M00749968-I1-MS2023-09-07Mechanical / HVAC853 BROADWAYMechanical work as reflected on plans herewith. No change to use, egress, or occupancy.$340,015
M00749951-I1-GC2023-09-07General construction853 BROADWAYinterior renovations as per plans filed herewith no change in use, egress or occupancy.$1,854,440
B00683050-I1-MS2023-03-30Mechanical / HVAC6401 18 AVENUEmodification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.$63,001
B00682959-I1-GC2023-03-15General construction6401 18 AVENUEGENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS INDICATED ON PLANS FILED HEREWITH. THEREIS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.$72,007
M00812046-S1-MS2023-03-14Mechanical / HVAC295 MADISON AVENUEMinor mechanical work related to minor general renovation of existing commercial space. No change to use, egress or occupancy.$15,000
M00812046-I1-GC2023-03-14General construction295 MADISON AVENUEMinor General construction renovation to existing commercial space. Minor mechanical work to be filed subsequently. No Change to use, egress or occupancy.$35,000
M08013530-S1-MS2023-03-03Mechanical / HVAC340 MADISON AVENUESubsequent Mechanical work related to general office renovation. No change to use, egress or occupancy.$750,000
M08013530-I1-GC2023-03-02General construction340 MADISON AVENUEGeneral office renovation. Mechanical work to be filed subsequently. No change to use, egress or occupancy.$550,000
M08013530-S2-GC2023-03-01General construction340 MADISON AVENUEEnergy lighting work related to General office renovation. No change to use, egress or occupancy.$100
M00711181-I1-GC2022-11-30General construction512 SECOND AVENUERemoval and installation of non bearing partitions and related finishes as per plans filed herewith. No change in use egress or occupancy under this application.$47,884
M00711250-I1-MS2022-11-28Mechanical / HVAC512 SECOND AVENUEModification to existing HVAC system and refrigeration system as per plans filed herewith. No change in use, egress or occupancy under this application.$53,440
M00738627-I1-MS2022-08-15Mechanical / HVAC119 WEST 24 STREETMechanical work as shown on plans$20,223
M00738621-I1-GC2022-08-04General construction119 WEST 24 STREETGeneral Construction work as shown on plans.$533,232
M00734699-I1-MS2022-07-21Mechanical / HVAC151 WEST 34 STREETMechanical modifications on part of the 7th floor retail. There is no change in use. egress or occupancy.$142,000
M00734686-I1-GC2022-07-21General construction151 WEST 34 STREETInterior renovation on part of the 7th floor retail. There is no change in use egress or occupancy.$435,000
M00735552-I1-GC2022-07-21General construction151 WEST 34 STREETInterior renovation on part of the 8th floor HR space. There is no change in use. egress or occupancy.$235,000
M00735557-I1-MS2022-07-13Mechanical / HVAC151 WEST 34 STREETMechanical modifications on part of the 8th floor HR space. There is no change in use. egress or occupancy.$42,000
M00313573-I1-MS2022-06-22Mechanical / HVAC125 BROAD STREETMODIFICATION TO EXISTING MECHANICAL SYSTEM AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.$9,500

Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.

Source and limits

Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →