COMPANY RECORD · NEW YORK, NY
Broadway Construction Gro — permit history in New York, NY
Broadway Construction Gro appears on 47 New York permit records from 2020 through 2026, most often mechanical / hvac (51.1% of the record).
Permit categories
| Category | Permits | Share |
|---|---|---|
| Mechanical / HVAC | 24 | 51.1% |
| General construction | 23 | 48.9% |
2 categories, as classified by the issuing authority. Small categories stay visible rather than being rounded away.
Activity by year
| Year | Permits issued |
|---|---|
| 2020 | 1 |
| 2021 | 4 |
| 2022 | 3 |
| 2023 | 9 |
| 2024 | 11 |
| 2025 | 15 |
| 2026 | 4 |
Busiest year on record: 2025, with 15 permits. One project can account for several filings, so read this as filing activity rather than workload.
Named on the same permit
| Name in source | Linked permits | Last seen |
|---|---|---|
| G.N.T. Mechanical LLC | 5 | 2026-06-22 |
| Safety Fire Sprinkler Cor | 5 | 2026-01-09 |
| A M B Mechanical Inc | 2 | 2025-11-05 |
| Jcc Construction Corp | 2 | 2025-11-07 |
| Rael Automatic Spr.Co Inc | 2 | 2026-08-07 |
| Rightway Plbg And Htg Inc | 2 | 2026-06-04 |
| Standard Plbg Svs LLC | 2 | 2025-04-08 |
| A&H Plumbing, LLC | 1 | 2025-02-10 |
| Bradford Mech. Contr Inc | 1 | 2023-10-20 |
| Cara Plumbing Group Inc | 1 | 2023-11-01 |
| Hudson Plmbing & Mch, LLC | 1 | 2024-02-26 |
| Lemode Plbg & Htg Corp | 1 | 2024-11-18 |
13 companies are named alongside Broadway Construction Gro on the same New York permit. A shared permit is a documented co-appearance, not proof of a current contract. Names appear as the authority published them.
Where they worked
| Address in source | Most recent permit |
|---|---|
| 340 NEVINS STREET | 2026-02-25 |
| 245 PARK AVENUE | 2026-02-09 |
| 45-11 23 STREET | 2026-02-06 |
| 351 WEST 14 STREET | 2025-12-23 |
| 119 WEST 56 STREET | 2025-11-13 |
| 95 ROCKWELL PLACE | 2025-11-12 |
| 582 SACKETT STREET | 2025-08-11 |
| 22 EAST 29 STREET | 2025-08-01 |
| 1186 BROADWAY | 2025-08-01 |
| 576 SACKETT STREET | 2025-06-09 |
| 1975 MADISON AVENUE | 2025-04-24 |
| 61 BOND STREET | 2025-02-06 |
| 310 NEVINS STREET | 2024-07-11 |
| 571 UNION STREET | 2024-04-19 |
23 distinct addresses on record; the 14 most recent are shown. Declared value on record runs from $0 to $699,930, median $10,000. Addresses appear as the authority published them. A permit is a filing at an address, not a completed job there.
Permits on record
47 permits; open the full list
| Permit | Issued | Category | Address in source | Scope as filed | Declared value |
|---|---|---|---|---|---|
| B00611202-Z2-MS | 2026-02-25 | Mechanical / HVAC | 340 NEVINS STREET | This subsequent document is administrative in nature in order to be able to obtain COC's in DOBNOW for mechanical units. All work/floor plans are submitted under the main MS filing | $0 |
| M01322959-I1-MS | 2026-02-09 | Mechanical / HVAC | 245 PARK AVENUE | Modifications to the existing HVAC system on the 1st floor (Cala Scarpetta) as per plans. No change to use, egress or occupancy. | $699,930 |
| Q00674206-I1-GC | 2026-02-06 | General construction | 45-11 23 STREET | New 54-story Building. | $1,000 |
| M01345468-I1-GC | 2026-02-05 | General construction | 245 PARK AVENUE | 1ST FL. COMMERCIAL ESTABLISHMENT. ERECT MINOR INTERIOR PARTITIONS, NEW FINISHES THRU-OUT, NEW HUNG CEILING. NEW PLUMBING, HVAC FILED SEPARATELY. NO CHANGE IN EGRESS, OCCUPANCY, OR | $399,960 |
| M01041962-I1-GC | 2025-12-23 | General construction | 351 WEST 14 STREET | General construction work as shown on plans. | $500,000 |
| M01041962-S1-MS | 2025-12-04 | Mechanical / HVAC | 351 WEST 14 STREET | Mechanical work as shown on plans (Prebuild Phase - Floors 5, 6, 9) | $200,000 |
| M01307501-I1-MS | 2025-11-13 | Mechanical / HVAC | 119 WEST 56 STREET | DEMOLISH (2) EXISTING HVAC UNITS LOCATED ON FOURTH FLOOR ROOF TO RESOLVE FDNY SUMMONS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. | $7,500 |
| B00948534-S4-MS | 2025-11-12 | Mechanical / HVAC | 95 ROCKWELL PLACE | Mechanical work for new 43 story building. | $0 |
| B00948534-I1-GC | 2025-11-06 | General construction | 95 ROCKWELL PLACE | Erect new 43 story building. Hub consultation held on 10.17.23. MPP project #349. | $0 |
| B01134080-I1-GC | 2025-08-11 | General construction | 582 SACKETT STREET | FILING 'NO WORK' APPLICATION TO UPDATE METES AND BOUNDS FOR RELATED NB APPLICATION # B00621076-I1. | $1,000 |
| M01024376-I1-MS | 2025-08-01 | Mechanical / HVAC | 22 EAST 29 STREET | REPLACE CHILLER AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $315,000 |
| M01183278-I1-MS | 2025-08-01 | Mechanical / HVAC | 1186 BROADWAY | REPLACE (2) MODULAR CHILLERS AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $175,000 |
| B01189283-I1-GC | 2025-06-09 | General construction | 576 SACKETT STREET | NO WORK APPLICATION IN CONJUNCTION WITH NB JOB # B00621076-I1 TO REFLECT ZONING LOT. ZONING LOTS 23, 26, 28, 47, 50 AND 51 HAVE BEEN COMBINED AND RECORDED AT THE CITY REGISTERS OF | $1,000 |
| M01203118-I1-GC | 2025-04-24 | General construction | 1975 MADISON AVENUE | This application is filed for a Temporary Corridor and Doors in conjunction with TUP Application # M01197710-I1 | $20,000 |
| M01172297-S2-GC | 2025-04-23 | General construction | 22 EAST 29 STREET | INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $25,000 |
| M01172297-I1-MS | 2025-04-21 | Mechanical / HVAC | 22 EAST 29 STREET | MODIFY EXISTING HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $20,000 |
| M01197710-I1-GC | 2025-04-21 | General construction | 1975 MADISON AVENUE | This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002-Option B | $20,000 |
| B01133301-S2-GC | 2025-02-06 | General construction | 61 BOND STREET | Energy Analysis filed in conjunction with const. application # B01133301-l1 | $1,000 |
| B01133301-I1-GC | 2025-02-06 | General construction | 61 BOND STREET | Demolish and Install interior non load bearing partitions related to Food & Beverage Interior Renovations per plans filed herewith. | $124,998 |
| M01012935-S1-MS | 2024-07-25 | Mechanical / HVAC | 22 EAST 29 STREET | Mechanical modifications related to 3rd and 4th fl. Hotel rooms renovations. No changes to layout or configuration under this filing. | $21,984 |
| M01012935-I1-GC | 2024-07-24 | General construction | 22 EAST 29 STREET | Interior remodeling of Hotel Guestrooms on the 3rd fl. ( Rm #'s 303, 304,305,307,308,309,315,334) and 4th fl.( Rm # 404). There are No Changes to Layout or configurations. | $96,240 |
| B00611202-I1-GC | 2024-07-15 | General construction | 340 NEVINS STREET | Filing to erect a new 22 story mixed use building (building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St). This NB is located within the Gowanus rezo | $1,000 |
| B00611166-I1-GC | 2024-07-11 | General construction | 310 NEVINS STREET | Filing to erect a new 22 story mixed use building (Building A). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St). This NB is located within the Gowanus rezo | $1,000 |
| M00289159-I1-MS | 2024-05-31 | Mechanical / HVAC | 1975 MADISON AVENUE | MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION 121206818. PAA FILED TO INDICATE REVISED PLANS AS PER AI 1 DESCRIPTION OF CHANGES. | $1,000 |
| B01013442-I1-GC | 2024-04-19 | General construction | 571 UNION STREET | NO WORK APPLICATION IN CONJUNCTION WITH NB JOB # B00621076-I1 TO REFLECT ZONING LOT. ZONING LOTS 23, 26, 28, 47, 50 AND 51 HAVE BEEN COMBINED AND RECORDED AT THE CITY REGISTERS OF | $1,000 |
| M01005511-I1-GC | 2024-04-09 | General construction | 22 EAST 29 STREET | Remove and install interior non load bearing partitions related to 2nd floor Lobby renovation. | $84,000 |
| Q00979672-I1-GC | 2024-03-04 | General construction | 10-27 JACKSON AVENUE | General construction as shown on the plans. | $5,000 |
| Q00979672-S1-MS | 2024-03-04 | Mechanical / HVAC | 10-27 JACKSON AVENUE | Mechanical work as shown on the plans. | $5,000 |
| B00611166-S3-MS | 2024-01-24 | Mechanical / HVAC | 310 NEVINS STREET | Mechanical work in conjunction with NB B00611166-I1 (Building A). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St). | $1,000 |
| B00611202-S3-MS | 2024-01-19 | Mechanical / HVAC | 340 NEVINS STREET | Mechanical work in conjunction with NB B00611202-I1 (Building B). Affordable housing. HUB consultation accepted on 9/21/21 (300 Nevins St). | $1,000 |
| B00621076-S4-MS | 2023-12-26 | Mechanical / HVAC | 240 3RD AVENUE | Mechanical work as shown on plans in conjunction with NB # B00621076-I1. | $1,000 |
| B00621061-S4-MS | 2023-11-03 | Mechanical / HVAC | 251 DOUGLASS STREET | Mechanical work as shown on plans in conjunction with NB # B00621061-I1. | $1,000 |
| B00621061-I1-GC | 2023-10-19 | General construction | 251 DOUGLASS STREET | Application to be assigned to HUB per Consultation meeting with SPV on 9/29/2021, 25% inclusionary housing. Application filed in order to erect 15 story mixed use new building. | $1,000 |
| M00346082-I1-MS | 2023-10-16 | Mechanical / HVAC | 44 NINTH AVENUE | Mechanical work as shown on plans. | $445,830 |
| M00813877-I1-MS | 2023-06-06 | Mechanical / HVAC | 119 WEST 56 STREET | Installing ventilation ducts and piping | $3,500 |
| M00813742-I1-GC | 2023-06-05 | General construction | 119 WEST 56 STREET | Removal and Construction of concrete sidewalk, sidewalk grates, planters related to renovation at 56th Street plaza for the Parker Hotel. | $75,000 |
| M00407801-I1-MS | 2023-04-13 | Mechanical / HVAC | 351 EAST 10 STREET | Installation of Packaged Heat Pumps in apartments and auxiliary AC in ancillary spaces.. - 56 units. | $338,885 |
| M00412871-I1-MS | 2023-04-13 | Mechanical / HVAC | 645 EAST 9 STREET | Installation of Packaged Heat Pump units in apartments and auxiliary AC units to service ancillary rooms, and installation of Ventilation and Energy Ventilator. | $188,000 |
| B00621076-I1-GC | 2023-03-21 | General construction | 240 3RD AVENUE | Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building. | $1,000 |
| M00697537-I1-GC | 2022-09-30 | General construction | 119 WEST 56 STREET | REMOVE AND INSTALL INTERIOR NON-LOAD BEARING PARTITIONS AND HUNG CEILING RELATED TO 23RD FLOOR RENOVATION. | $199,967 |
| M00703420-I1-MS | 2022-09-30 | Mechanical / HVAC | 119 WEST 56 STREET | REMOVE AND INSTALL MECHANICAL HVAC DUCTWORK AND EQUIPMENT PER PLANS. | $100,000 |
| B00338975-I1-MS | 2022-03-04 | Mechanical / HVAC | 171 NORTH 1 STREET | Mechanical work as shown on plans filed herewith, in conjunction with New Building application #321589722. | $1,000 |
| M00605068-I1-GC | 2021-10-25 | General construction | 148 MADISON AVENUE | Architectural changes on the 11th floor (Baharestani & Ritt) as indicated on drawings. | $68,888 |
| M00605074-I1-MS | 2021-10-25 | Mechanical / HVAC | 148 MADISON AVENUE | Mechanical changes on the 11th floor (Baharestani & Ritt) as indicated on drawings. | $3,500 |
| M00449893-I1-GC | 2021-02-25 | General construction | 351 WEST 14 STREET | General construction work as shown on plans. | $10,000 |
| M00448838-I1-MS | 2021-02-25 | Mechanical / HVAC | 119 WEST 56 STREET | Install new bathroom exhaust system for bathroom. Remove and install exhaust ductwork, outlets, diffusers related to Public spaces including 1st fl. Restaurant, 3rd fl. Ballroom, | $69,996 |
| B00343926-I1-MS | 2020-06-24 | Mechanical / HVAC | 810 FULTON STREET | Post Approval Amendment being filed to revise plan to add HVAC equipment certificate numbers to the mechanical schedule | $449,731 |
Fields appear as the issuing authority published them, including spelling and blanks. Scope text is the applicant's description of intended work, not an inspection finding.
Source and limits
Public New York permit records through 2026, counted by distinct permit number. This is a historical filing record: it cannot show current backlog, pricing, crew availability, licensing or insurance, and a quiet period may only mean work was filed elsewhere. Confirm anything commercial with the company and with the issuing authority before acting. How we build these records, and what we withhold →
